Loading...
HomeMy WebLinkAbout3303 N Kerr Ave TRC Compiled Comments Atlantic Glass – 3303 N Kerr Ave – TRC Review Page | 1 To: Shayla Sochalski, Skye Property Holdings, (dsochalski@atlanticglass.net) From: Zach Dickerson, Senior Planner Date: February 4, 2026 Technical Review Committee (TRC) PID#: R03316-004-006-000 Egov# SITECN-26-000001 Subject: 3303 N Kerr Ave – Atlantic Glass - TRC Review Technical Review Committee (TRC) General Information The TRC is a staff-level group of local government officials that reviews projects for compliance with the local regulations administered by each respective review agency. Voluntarily participating state agencies may also provide comments. And general information and non-binding recommendations about the site may also be provided by government agencies. The TRC meetings are considered staff meetings and are not public hearings. The TRC meeting is an opportunity for applicants to speak with county staff and any voluntarily participating state or federal agencies about the review comments they have been provided. No voting is involved in the TRC process, and no final approvals or denials are made at the TRC meetings. Following the TRC meeting, applicants are responsible for updating their plans to address review comments. Those revised plans need to be resubmitted to the assigned case planner. The case planner will facilitate additional reviews until all comments have been addressed, and the necessary departments have stated the plans comply with the applicable minimum requirements for development. Following any future TRC approval, the project is required to obtain additional permits to include a zoning compliance permit for the site. Applicants are also responsible for coordinating with state and federal agencies for compliance with any additional requirements. Any activity on the property that is not approved as part of the TRC review and zoning compliance permit will be considered a violation of the UDO and subject to enforcement action under Article 12 Violations and Enforcement. The following comments have been received for the February 4, 2026, TRC meeting. Additional comments may be made upon further review of subsequent revisions. Atlantic Glass – 3303 N Kerr Ave – TRC Review Page | 2 Planning, Zach Dickerson, zdickerson@nhcgov.com Compliance with local UDO requirements 1. General Comments a. The zoning district is I-1, Light Industrial b. As stated in the application the intended use is Retail/Office. The Unified Development Ordinance (UDO) defines the use as i. Retail Sales, General: Commercial enterprises that provide goods and/or services for sale, lease, or rental directly to the consumer. Examples include stores selling, leasing, or renting consumer, home, and business goods such as art, clothing, dry goods, electronic equipment, furniture, garden supplies, hardware, jewelry, pet food, and printed material. ii. Office for Private Business and Professional Activities: Establishments primarily engaged in the day-to-day administrative or clerical services for businesses or other organizations that provide professional or other services to the general public on a walk-in or appointment basis in an office setting. c. The Planning and Land Use Department’s review of the site is for compliance with the UDO and use specific requirements of the specified land use. Any other activity that might occur on the property beyond the definition above should be noted on the application and site plan for additional review and comment. 2. UDO Section 5.1, Parking and Loading a. Both Retail Sales, General and Offices for Private Business and Professional Activities require 2.5 parking spaces per 1,000 feet of use. b. 8,750 sq ft building would require 22 parking spaces. c. Site plan shows 22 parking spaces for this new building, parking is sufficient. d. The ADA parking spaces will also need to meet the 9’x18’ minimum for 90° parking spaces. 3. UDO Section 5.2, Traffic, Access and Connectivity a. Please note that no building permit for any structure shall be issued which requires NCDOT approval for a Driveway Permit until NCDOT has issued the permit approval. Evidence of approval shall accompany the application for building permit. b. Include the WMPO’s estimated AM and PM traffic generation. If either AM or PM peak hour exceeds 100 trips, state a TIA is required. Atlantic Glass – 3303 N Kerr Ave – TRC Review Page | 3 4. UDO Section 5.3, Tree Retention a. The site plan notes that there are trees planned to be removed here, please apply for a Tree Removal Permit. b. The permit application can be found here: https://www.nhcgov.com/DocumentCenter/View/1239/Tree-Removal-Permit-PDF c. Note: Land disturbance permits can be issued by county Engineering before a Tree Removal Permit is approved by Planning. However, any trees removed before the Tree Removal Permit is issued may result in enforcement action under Section 5.3.2 of the Unified Development Ordinance to include prohibiting any development of the site for 3 to 5 years. 5. UDO Section 5.4, Landscaping and Buffering a. It appears there is already street yard for this site. Please confirm that it will remain. It is sufficient for the building expansion. b. Foundation plantings look fine too, thanks! c. Please confirm parking lot landscaping- this is calculated at 8% of the area used for parking and interior drive aisles. d. Per UDO Section 5.4.2.B, 15 trees must be planted or retained per acre disturbed. Per the application, 0.98 acres are being disturbed, so 15 trees would be required to be planted or disturbed on the site. This can be achieved through landscape plantings, including parking lot trees, and trees around the perimeter of the site. e. A transitional landscape buffer is required for this site, to the west and south where the site abuts residential lots. a. It appears that there is already a transitional buffer for this site to the west, but it is not wide enough. b. The transitional buffer is calculated at a minimum of 50% of the required setback. c. The I-1 district requires a minimum of 50’ side setback from residential uses, so the transitional buffer needs to be a minimum of 25’ in width. d. Per Table 5.4.1.B, the width of the transitional buffer along the western boundary of the site will need to be brought up to current standards. f. All planting materials must comply with the approved planting materials listed in the New Hanover County Tree & Landscaping Manual. The species and size must be listed in the final landscape plan indicating compliance with the manual. Or evidence the proposed plant species are acceptable from the county Agricultural Extension office. Atlantic Glass – 3303 N Kerr Ave – TRC Review Page | 4 6. UDO Section 5.5, Lighting a. Please note that a lighting plan is not required for TRC approval but will be required prior to issuance of construction plan approvals. b. Is any lighting proposed for the site? 7. UDO Section 5.6, Signs a. There is already a sign on the site for Atlantic Glass- will another sign be added? b. For any signs on the site, a separate sign permit must be submitted and reviewed by the county for compliance with Section 5.6 of the UDO for standards at or after the submittal of the separate zoning compliance and construction permits for the primary building or use. Any approvals granted by the TRC for the site design is not an approval for the ultimate size or placement of the sign. 8. UDO Section 5.7, Conservation Resources a. There are no Conservation Resources on this site. 9. UDO Article 9, Flood Damage Prevention a. None of this site is in the floodplain. NHC Fire Services, Ray Griswold 910-798-7448 Compliance with NC Fire Code 1. Fire finals required. 2. Portable fire extinguishers required per NFPA 10 3. No storage over 12 foot high, unless approved by this office and the proper fire protections are met. NHC Engineering, Galen Jamison 910-798-7072 Stormwater management and land disturbance 1. There appears no increase in impervious surface or proposed conveyance measures from the original permit, ATC-322-07/12/06. If so, there is no requirement for a county issued stormwater report. 2. It appears the limits of disturbance is less than 1 acre and the original common plan of development is greater than 7 years. If so, there is no requirements for a land disturbing Atlantic Glass – 3303 N Kerr Ave – TRC Review Page | 5 permit but appropriate measures as indicated on the site plan shall be provided. The building permit application will need to include the final designed site plan. 3. Should either of the above statements become false, a stormwater and/or land disturbing permit may be required. 4. Please contact the State for their stormwater permit requirements. It is anticipated a minor modification to SW8 060636 will be required. NHC Environmental Health, Dustin Fenske 910-798-6732 Septic tanks and wells 1. Existing structure on this property is connected to public water. The new structure must connect to public water as well. 2. Site plan and improvements reflect maintaining the septic system and repair area with no paving or setback issues related to the existing system. The site plan indicates the new building will have a septic system. The building will need an approved septic permit prior to application. Appropriate applications will need to be made to NHC Environmental Health or a Private Soil Scientist and corresponding permits issued. NHC Addressing, McCabe Watson 910-798-7068 Street naming and property address 1. Proposed building and units will need their own individual address. Please contact me for address assignments following TRC approval. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 Public water and sewer 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan Review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. 3. CFPUA water available. Atlantic Glass – 3303 N Kerr Ave – TRC Review Page | 6 4. Further evaluation will need to be completed to determine if a forcemain-to-forcemain connection can be done for sewer. 5. CFPUA Meter Sizing Form will be required. 6. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains). 7. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. 8. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. NCDOT, Nick Drees 910-343-3915 Driveway access and state road improvements 1. Please see attached comments. WMPO, Luke Hutson 910-343-3915 New Hanover County contracted traffic engineering services comments: 1. Please see attached comments. Army Corps of Engineers, Brad Shaver 910-251-4611 Information or Requirements if wetlands are impacted 1. No comments on this site. Atlantic Glass – 3303 N Kerr Ave – TRC Review Page | 7 Project information also provided to the following state agencies and non-regulatory local agencies for their awareness: New Hanover County Emergency Management New Hanover County Schools NC Department of Environmental Quality (DEQ) NC DEQ Division of Coastal Management NC DEQ Division of Energy, Mineral, and Land Resources New Hanover County Sustainability Manager STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JOSH STEIN DANIEL H. JOHNSON GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Memorandum DATE: January 26, 2026 TO: New Hanover County Technical Review Committee SUBJECT: Atlantic Glass – 3303 North Kerr Avenue ________________________________________________________________________ These are preliminary comments and are based on the plans as submitted for the proposed site. They are subject to further review upon receipt of any additional information. Subsequently, additional comments and/or requirements may be necessary for this site. General Comments: NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx You can coordinate with the District Office with any questions 910-398-9100. NCDOT Driveway Permit: An NCDOT Driveway Permit is required. Submit plans in accordance with pages 14 and 15 of the Policy on Street and Driveway Access to North Carolina Highways to include access locations within 500’ of the proposed access on both sides of the State Road. Submit to the local NCDOT District Engineer’s Office. • Refer to the NCDOT checklist (included) for required documents and site plan information. NCDOT Encroachment Agreement: An NCDOT Encroachment Agreement is required for any utility connections or installations within the NCDOT right-of-way (form 16.6). • Refer to the NCDOT UAM Manual and the NCDOT encroachment checklist for required documents and site plan information. An NCDOT Encroachment Agreement is required for any sidewalk or multi-use paths installed within the NCDOT right-of-way (form 16.6). Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Site Plan Comments: NCDOT Standard Drawings: • Include/update the NCDOT Standard Drawings (2024) that are applicable to the development. Sight Triangles and Sight Distance: • Show and label the 10’ X 70’ NCDOT sight triangles. o No obstructions shall be placed within the NCDOT sight triangles. • Show and label the stopping sight distance. o No obstructions shall be placed within the stopping sight distance. Identification Signing and Landscaping: • Identification signing or landscape vegetation within the median and the sight distance triangle must not obstruct the driver’s line of sight. No landscaping or signing will be allowed to exceed 42 inches in height, measured from the Edge of Pavement (EOP) within the median or sight triangle. • All pylon signs in the median or sight distance triangle must provide a vertical clear sight zone between 3 feet-6 inches and 10 feet-0 inches measured from the EOP. Signing located within a clear recovery area shall be of a “breakaway design.” • Only low growing shrubbery, consistent with the NCDOT’s landscaping policies, as contained in the publication “Guidelines for Planting Within Highway Right of Way,” will be allowed within a landscaped median and the sight distance triangle at the entranceway to a development, whether the street or driveway connection to the State Highway System is designated as a public facility or not. Landscaping within the right-of-way and sight distance triangles may require additional approval by the District Engineer. Gated Entrances: • Show and label any proposed gates with distances to the right of way line. NCDOT | Division 3 | District 3 Project Name:_____________________________ Date:_______________ Applicant Checklist NCDOT Checklist Driveway Application Process and Site Plan Requirements ALL APPLICATIONS SHALL BE ACCOMPANIED BY COMPLETE AND DETAILED SITE PLANS THAT ADHERE TO THE POLICIES LISTED IN THE POLICY ON STREET AND DRIVEWAY ACCESS TO NORTH CAROLINA HIGHWAYS AND THIS DOCUMENT. FAILURE TO ADHERE TO THESE POLICIES WILL RESULT IN THE RETURN OF THE APPLICATION TO THE APPLICANT FOR REVISION. ***THE NCDOT WILL NOT BEGIN THE REVIEW PROCESS ON INCOMPLETE APPLICATIONS*** Electronic Pre-Submittals In an effort to save time and resources, we are happy to provide an initial assessment of a driveway permit submittal’s plans via email to identify any major issues up front. This initial assessment can be followed up with a submittal of one digital copy of the plans along with all other required documents. All Permit applications shall be submitted through the online portal https://connect.ncdot.gov/site/Permits/Pages/default.aspx In the notify email section of the portal application please include the District Office email (Div3Dist3@ncdot.gov). See the last pages for further instruction. Online resources: •NCDOT Policy on Street and Driveway Access to North Carolina Highways: https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Policy%20on%20Street%20an d%20Driveway%20Access.pdf •NCDOT Policies and Procedures for Accommodating Utilities on Highway Rights of Way: https://connect.ncdot.gov/municipalities/Utilities/Pages/UtilitiesManuals.aspx •Electronic Forms Database: https://connect.ncdot.gov/Pages/default.aspx 1) a.Cover Letter Include contact information for applicant and engineer, including email address, mailing address, and phone number. Include the parcel number(s), description of all phases of the development and future land uses to be served by the permit, and a description of the adjoining land owned or controlled by the applicant. b.NCDOT Street and Driveway Access Permit Application (form downloadable via link below) https://connect.ncdot.gov/resources/BusinessForms/TEB-65-04.doc c.$50.00 Inspection Fee Per Access Point Attach to Permit Application form (not applicable for municipalities, churches, and schools) d.NPDES Stormwater Permit Compliance Certification (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/NPDESstatement.doc e.Verification of Compliance with Environmental Regulations (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/VCER-1.pdf f.Site Plans (to include the “Master Plan” of a tract even if only a small portion is being developed first) Additional site plan requirement details can be found in section 2 of this document. g.Design Plan Requirements for projects involving roadway improvements If roadway improvements are required as part of the permit, then roadway plans, pavement marking plans,signing plans, and traffic control plans will be required - See Section 6 for more information Y N n/a Engineering Studies The applicant may be required by the District Engineer to submit studies based on, but not limited to, the parameters outlined herein. If study requirements of the local government agency are more restrictive than the NCDOT requirements, then local government requirements will govern. However, this does not imply that the NCDOT is obligated to approve entrance designs that are too constrictive to allow smooth and safe traffic flow. All studies including, but not limited to, Traffic Impact Analyses (TIA), traffic signal studies, and drainage studies, must be prepared under the direct charge of and sealed by a North Carolina licensed Professional Engineer. Section 1: Requi red Documents |Required documents to accompany all Initial Driveway Application Submittals Please note that these are the minimum requirements of all driveway permit applications. All required documentation shall be submitted through the online portal as PDF files, with the exception of the Performance and Indemnity Bond and the $50 Inspection Fee(s), these should be mailed or delivered to 5501 Barbados Blvd, Castle Hayne, NC 28429. If a Traffic Impact Analysis and/or roadway improvements are deemed necessary as a condition of the permit, there may be additional submittal materials required. State of North Carolina | Department of Transportation | Division 3 | District 3 5501 Barbados Blvd, Castle Hayne, NC 28429 Form Updated 10/15/2021 (910) 398-9100 T NCDOT Permit #___________________ Y N n/a Section 1: Required Documents (continued) 2)Required documents to accompany all Driveway Applications PRIOR TO FINAL APPROVAL a.Site Plans One (1) digital copy (PDF) unless otherwise requested by the District Office. Additional site plan requirement details can be found in section 2 of this document. b.Performance and Indemnity Bond Information/Forms See last page of document for bond information and forms c.Performance and Indemnity Bond Amount 100% of the cost of the work within NCDOT Right-of-Way (R/W) based on the attached estimate determined by the applicant's engineer and approved by the District Engineer. Bond hold letter required for for municipalities, churches, and schools. See pages 101-105 in the Policies and Procedures for Accommodating Utilities on Highway Rights of Way for acceptable bond types d.Radius Encroachment Letter (if applicable) If driveway radius encroaches on the frontage of an adjacent property, a Radius Encroachment will be required e.Hold Harmless Letter (if applicable) If the Permit is within the limits of an active NCDOT project, a Hold Harmless letter from the NCDOT contractor will be required. If the project is in preconstruction, coordinate with the Department's Project Development Unit Section 2: General Site Plan Requirements | All site plans shall include and show, at a minimum, the items listed below Page numbers reference the NCDOT Policy on Street and Driveway Access to North Carolina Highways 1)Drawn to a scale of 20, 30, 40, or 50 feet per inch and the scale shall be shown 2)North arrow, vicinity map, date of plan, and date of most-recent revision if applicable 3)Contact information of applicant and engineer, including mailing address, phone number, and email address 4)Show R/W lines, highway control of access, and property lines 5)All existing utilities (including handholes) and easements 6)R/W width 7)Existing posted speed limit(s) and design speed limit(s) 8)Show all property lines, intersections, signals, signal loops, railroads, or crossovers within 500’ in all directions of the property lines of the proposed development 9)Show location of sidewalks, crosswalks, greenways, multi-use paths, curb ramps, railroads, bus stops, and any other relevant transportation facilities in the development area 10)Include a plan sheet showing full site build-out and land use 11)Buildings shown with “gross leasable area” 12)Width of property frontage 13)Distance from R/W to buildings and gasoline service islands 14)Distance from R/W to existing/proposed Edge of Pavement (EOP) (pages 32 & 34) 15)All streams, bridges, retaining walls, signs, or other fixed objects such as trees, utility poles, traffic signals, etc. Section 3: Driveway Plan Requirements | All driveway plans shall include and show, at a minimum, the items listed below 1)Provide comprehensive survey within the existing R/W on both sides of the road for a distance of 500’ in all directions from the development’s property lines. Provide additional hydraulic survey data to the nearest storm water inlet/outlet including ditch lines and storm water pipes, if located outside of the 500' distance. 2)Lane configurations and widths of all existing and proposed driveways, roadways, and adjacent roadways 3)All driveway widths (2-way: 20’ minimum, 36’ maximum | 1-way: 12’ minimum, 24’ maximum | with island: 14'ingress, 18' egress) (pages 50 & 77) 4)Driveway Profile - In shoulder sections, maintain minimum 2% fall from edge of travel way for required shoulder width distance Primary: 8’ minimum | Secondary: 6’ minimum 5)All existing and/or proposed driveway radii (20’ minimum, 50’ maximum, 30’ typical) (pages 34 & 51) In curb and gutter sections, use City of Wilmington flare (SD 3-03.3) - (see attached) In shoulder sections, show grades at the EOP and centerline 6)No curbing is allowed within NCDOT R/W along shoulder sections except as part of a driveway island (page 31) 7)Driveway angles of approach to existing roadway (90° preferred, 75°-90° required for 2-way driveways, 45°-90° allowed for right-in/right-out on a case-by-case basis) (page 51) 8)Driveway Profile (pages 42- 43) Y N n/a Y N n/a □□ □□ □ □ Y N n/a Y N n/a Y N n/a Y N n/a Section 3: Driveway Plan Requirements (continued) 9)Driveway Pavement Cross Section (to be in place from EOP to edge of R/W) Asphalt: 8” ABC stone and 1.5” S9.5B Concrete: 6” of concrete 10)Driveway Offset (driveway EOP to property line; page 75): Minimum: 20’ 11)Corner Clearance (radius point to radius point; page 52)Minimum: 50’ Desirable: 100’ or Municipal std. 12)Minimum 10’x70’ sight triangles at driveways (measured from and along the R/W line) (page 31) 13)Sight Distance (length of sight-distance in both directions shown for each driveway; pages 27-29) 14)Driveways should be aligned with existing opposing driveways or correct offset should be provided (pages 40-41) 15)Distance between driveways being requested (if applicable; page 51) 16)Minimum internal storage areas with specified queues (pages 31-33) 17)Minimum protected driveway stem(s) provided and indicated (pages 33-34) 18)Indicate any gated entrances (100’ minimum setback from R/W required) - traffic queuing study may be required | Section 6: Roadway Plan Requirements If off-site improvements are required, roadway plans shall show, at a minimum, the items below 1)Full width typical sections must be shown (paved shoulders to match the typical section of the adjacent roadway) 2)Minimum Asphalt Typical Section (for turn lanes and/or paved shoulders) Adjacent recently-completed or upcoming TIP projects w/ different typical sections may supersede those below •Primary Routes (US & NC) and Secondary Routes with Annual Average Daily Traffic (AADT) ≥10,000 5.5” B25.0C, 3” I19.0C, 1.5” S9.5C; any overlay of existing pavement is to be a minimum of 1.5” S9.5C •Secondary Routes with AADT<10,000 5.5” B25.0C, 1.5” S9.5B; any overlay of existing pavement is to be a minimum of 1.5” S9.5B 3)Pavement overlay is required if modification of existing pavement markings and/or lanes is necessary The grinding of pavement markings will not be allowed 4)Shoulder Widths (Paved + Unpaved) Primary: 8’ minimum | Secondary: 6’ minimum 5)Ditch Slopes - front and back slopes - minimum 3:1 or flatter 6)Indicate existing roadway grade 7)All taper lengths and deceleration lengths should be appropriately designed for the given design speed (page 78) 8)All turn lanes should be designed according to the Driveway Manual and Roadway Standard Drawings (page 79) See 1205.04 Sheets 1 & 2 and 1205.05 Sheet 1 of the Roadway Standard Drawings for details 9)Pavement marking and signing plans are required - plans must be approved by Division Traffic Services 10)Traffic control plans are required - Detailed phasing plans may be required based on project type and location 11)New and/or revised signal plans must be included for new installations and if signal modifications are required All signal plans must be reviewed and approved by Division Traffic Services and the Signal Design Unit. A Traffic Agreement must be completed to facilitate the review. Contact Division Traffic Services at (910) 341-2200. | Section 4: Drainag e Requirements All drainage features on NCDOT Right-of-Way shall adhere to, at a minimum, the items listed below Section 5: Internal Circ ulation Requirements |All internal circulation details shall adhere to, at a minimum, the items listed below 1)Interior driveway channelization stems Minimum 100’ from the ROW or at the discretion of the District Engineer 2)Traffic flow pattern 3)Traffic control devices 4)Pavement Markings Y N n/a Y N n /a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a 1)Pipe Cover Minimums (measured from top of pipe to subgrade) High Density Polyethylene (HDPE): 24” | Corrugated Aluminum (CAP): 12” | Reinforced Concrete (RCP): 12” 2)Pipe End Treatment (see Roadway Design Manual 5-20, B-2) Pipes ≤24" on multilane highways posted above 45mph require Parallel Pipe End Sections See 310.02 and 310.04 of the Roadway Standard Drawings for details Pipes >30" on multilane highways posted above 45mph require guardrail Pipes ≥36" require an endwall on the inlet end 3)All proposed Drainage is to be provided inside existing R/W. Otherwise, additional R/W or a permanently dedicated drainage easement will be required to accommodate the proposed project drainage 4)All sizes, types, and invert elevations of existing/proposed pipes and drainage structures must be shown(see Sec.3 #1 for survey requirements) 5)Provide spot elevations along frontage of driveway (at EOP and centerline) 6)Provide grades and spot elevations for existing and proposed ditches 7)Show how drainage will be accommodated along property frontage(District Engineer may require applicant to provide drainage calculations when warranted) C/L EOTEOP P/L R/WR/W R/W EOP EOP EOP EOP NTS R/W P/L DRAINAGE FLOW DRAINAGE FLOW DRAINAGE FLOW SHOULDER WIDTH SHOULDER WIDTH SHOULDER WIDTH SHOULDER WIDTH S IGHT T R IANGLE 10 ' BY 70 'S I GHT T R I AN G L E10' B Y 70' DRIVEWAY RR MIN. 30'MIN. 30' NO ROADWAY IMPROVEMENT COMMERCIAL DRIVEWAY WITH NORMAL CROWN ROADWAY 6" LOWER THAN THE EDGE OF PAVEMENTMIN 2% FALL AWAY or 20' AWAY FROM THE PROPERTY LINEDRIVEWAY SHALL BE LOCATED AT LEAST PIPE/TYPE/SIZE WIDTH CON CR ET E /ASP HA LT LOCAL NAME ROAD POSTED SPEED ( ) MPH WIDTH WIDTHSR NUMBER SITE ADDRESS:TAX PARCEL # 20191115 PARALLEL END S.D. 310.02 INVERT ELEVATION PARALLEL END S.D. 310.02 INVERT ELEVATION 20' AWAY FROM THE PROPERTY LINEDRIVEWAY SHALL BE LOCATED AT LEAST OR 500' OF XYZ SURVEY DATA PAST THE PROPERT LINENEAREST OUTFALL ELEVATION OR 500' OF XYZ SURVEY DATA PAST THE PROPERT LINENEAREST OUTFALL ELEVATION MEMORANDUM To: New Hanover County Technical Review Committee Date: January 23, 2026 Subject: 3303 N Kerr Flex Space Comments: • Please confirm that the appropriate ITE land use code has been used below to ensure accurate trip generation estimates. NCDOT Projects: • N/A WMPO 2050 MTP Projects: • N/A New Hanover County Projects: • N/A TIA: Based on the 11th edition ITE Trip Generation Manual, a TIA is not required. Land Use (ITE Code) Intensity Unit 24 Hour Volumes AM Peak Hour Trips PM Peak Hour Trips General Office (710) Combined 19,650 SF 282 41 43 General Office (710) Proposed 8,750 SF 139 21 22