Loading...
HomeMy WebLinkAbout2-4-2026 TRC Agenda Packet TECHNICAL REVIEW COMMITTEE AGENDA February 4, 2026 New Hanover County’s Technical Review Committee (TRC) will meet Wednesday, December February 4, 2026 at 2:00 p.m. to discuss the below items. The Technical Review Committee (TRC) is a staff-level group that reviews projects for compliance with the regulations administered by each respective review agency. The TRC meetings are considered staff meetings with applicants and are not public hearings. The TRC meeting is an opportunity for applicants to speak with county staff and any voluntarily participating state agencies about the review comments they have been provided. No voting is involved in the technical review process and no approvals or denials are made at TRC meetings. Following the TRC meeting, applicants are responsible for updating their plans to address review comments. Applicants are also responsible for coordinating with state and federal agencies for compliance with any additional requirements. Information about the projects can be found on online at the county’s Development Activity page. This meeting will be conducted remotely via teleconference. Interested parties can listen to the February 4, 2026 TRC meeting by calling 336-218-2051 and entering conference ID: 748 275 992# 2 Agenda Items Item 1: Swartville Residential – SUBPP-25-0038 • Request by Ross Tomaselli for a 2-phase, 292 unit major residential development. • The site is located at 317 Crowatan Rd in Castle Hayne and is 89.9 acres, zoned R-7. • The engineer is Brian Ensign with TCCO/TC2 (brian@tc2pllc.com) • The case planner is Zach Dickerson (zdickerson@nhcgov.com) Item 2: 3411 Merchant Court – Flex Space – SITECN-26-000002 • Request by Rick Campagna with the Camp Group, LLC for a 7,400 sq ft flex space building. • The site is located at 3411 Merchant Court and is 1 acre, zoned PD (Planned Development- part of Northchase) • The engineer is Branch Smith with Dogwood PLLC (dogwoodpllc@gmail.com) • The case planner is Amy Doss (adoss@nhcgov.com) Item 3: 3303 N Kerr Ave – N Kerr Retail/Office – SITECN-26-000001 • Request by Shayla Sochalski with Atlantic Glass for a 19,650 sq ft office and retail building. • The site is located at 3303 N Kerr and is 2.5 acres, zoned Airport Commerce • The engineer is Phil Tripp with Tripp Engineering (ptripp@trippengineering.com) • The case planner is Zach Dickerson (zdickerson@nhcgov.com) 3 Item 4: 3036 Hall Watters Drive – Gym – SITECN-26-000003 • Request by Robert Broadfoot for a 15,120 sq ft gym • The site is located at 3036 Hall Watters Drive and is 2.48 acres, zoned PD (Blue Clay Farms) • The engineer is John Tunstall with Tunstall Consulting Engineers (jtunstall@tunstallengineers.com) • The case planner is Ryan Beil (rbeil@nhcgov.com) Swartville Residential – Major Subdivision – TRC Review Page | 1 To: Ross Tomaselli, rojoto@icloud.com Brian Ensign, brian@tc2pllc.com From: Zach Dickerson, Senior Planner Date: February 4, 2026 TRC Review PID#: R02500-002-030-000 Egov# SUBPP-25-0038 Subject: Swartville Residential- Preliminary Plan TRC Review Technical Review Committee (TRC) General Information The TRC is a staff-level group of local government officials that reviews projects for compliance with the local regulations administered by each respective review agency. Voluntarily participating state agencies may also provide comments. And general information and non-binding recommendations about the site may also be provided by government agencies. The TRC meetings are considered staff meetings and are not public hearings. The TRC meeting is an opportunity for applicants to speak with county staff and any voluntarily participating state or federal agencies about the review comments they have been provided. No voting is involved in the TRC process, and no final approvals or denials are made at the TRC meetings. Following the TRC meeting, applicants are responsible for updating their plans to address review comments. Those revised plans need to be resubmitted to the assigned case planner. The case planner will facilitate additional reviews until all comments have been addressed, and the necessary departments have stated the plans comply with the applicable minimum requirements for development. Following any future TRC approval, the project is required to obtain additional permits to include a zoning compliance permit for the site. Applicants are also responsible for coordinating with state and federal agencies for compliance with any additional requirements. Any activity on the property that is not approved as part of the TRC review and zoning compliance permit will be considered a violation of the UDO and subject to enforcement action under Article 12 Violations and Enforcement. Swartville Residential – Major Subdivision – TRC Review Page | 2 The following comments have been received for the February 4, 2026, TRC meeting. Additional comments may be made upon further review of subsequent revisions. Planning, Zach Dickerson, zdickerson@nhcgov.com Compliance with local zoning requirements 1. General Comments a. The zoning on this site is R-7, tied to rezoning case Z23-02. It is a straight rezoning with no conditions. b. This is a performance residential subdivision. i. The R-7 district allows a maximum 6 dwelling units per acre. ii. There are Class IV soils on this site which are not being set aside for density purposes. Those numbers are broken out below. iii. Density Calculations: 1. Total site acreage = 89.9 acres 2. Less 11.3 acres of Pamlico Muck Soil. 3. R-7 Zoning District allows maximum of 6 dwelling units per acre under performance residential subdivision. 4. 78.6 acres * 6 dwelling units per acre = 472 maximum dwelling units 5. This project only shows 241 lots, less than the maximum allowable. c. Staff recommend including the location of traffic calming devices on the preliminary plans. Installation of traffic calming devices are not required, but including potential locations on the plan ensures the future HOA / owners will have the opportunity to install them without conducting a traffic study. 2. UDO Section 5.1, Parking and Loading a. Single-family dwellings, detached, require 2 parking spaces per unit. Generally this is achieved in the driveways. Please confirm each dwelling unit will have at least 2 parking spaces. 3. UDO Section 5.2, Traffic, Access and Connectivity a. Please note that no building permit for any structure shall be issued which requires NCDOT approval for a Driveway Permit until NCDOT has issued the permit approval. Evidence of approval shall accompany the application for building permit. Swartville Residential – Major Subdivision – TRC Review Page | 3 b. I will get into this more in the Subdivision Design, but please detail how the development will connect out to Castle Hayne Road. It shows a stub road currently, but it would be helpful to see a zoomed out site plan that shows the road connecting out to Castle Hayne. c. We discussed this on the phone, but please detail how the stub road to the south will connect to the Old Mill neighborhood, if such a connection is planned. d. See WMPO’s comments about a TIA- most of these details will likely get ironed out in the TIA. 4. UDO Section 5.3, Tree Retention a. Note: Land disturbance permits can be issued by county Engineering before a Tree Removal Permit is approved by Planning. However, any trees removed before the Tree Removal Permit is issued may result in enforcement action under Section 5.3.2 of the Unified Development Ordinance to include prohibiting any development of the site for 3 to 5 years. b. Tree Removal Permits are not required for residential lots of less than one acre in size if they are shown as part of an approved preliminary plan. c. Please note that a Tree Removal Permit will be required for essential site improvements, such as roads and stormwater infrastructure. 5. UDO Section 5.4, Landscaping and Buffering a. Landscaping and buffering are only required for the amenity areas, if any are planned. 6. UDO Section 5.5, Lighting a. Please note under 5.5.2.A that a lighting plan is not required for single-family residential projects and the county does not require streetlights, however a lighting plan is required for any amenity area. 7. UDO Section 5.6, Signs a. No signs are shown on the plan. However, if any are planned, please ensure you submit for a sign permit and that they are outside of the NCDOT sight triangles on Castle Hayne Rd. b. For any signs on the site, a separate sign permit must be submitted and reviewed by the county for compliance with Section 5.6 of the UDO for standards at or after the submittal of the separate zoning compliance and construction permits for the primary building or use. Swartville Residential – Major Subdivision – TRC Review Page | 4 8. UDO Section 5.7, Conservation Resources (COD) a. Per the New Hanover County Conservation Resources Map, there is a large area of the Pocosin Conservation Resource on this site. i. A rough measurement using New Hanover County GIS shows approximately 76.8 acres of the site is Pocosin Conservation Resource. I have included a screenshot below showing what our records show. Pocosin Conservation Resource ii. Table 5.7.2.A states that Pocosin areas greater than 5 acres in size are regulated, and Conservation Resource Standards kick in. iii. However, a historic staff determination states that Pocosin Conservation Resources, specific to only Pocosin, kick in when they are underlaid with Class IV soils. Swartville Residential – Major Subdivision – TRC Review Page | 5 iv. As indicated in the application, there are 11.3 acres of Pamlico Muck soil on the site. I have included a screenshot below, similar to the one above, showing the areas on the site that our maps show there is Pamlico Muck soil. Pamlico Muck Soil (Pm) v. The way the required conservation space would be calculated out is as follows: 1. Field verification of the exact acreage of Class IV soils that underly the Pocosin Conservation Resource. In this case, we can use 11.3 acres as an example. 2. The 11.3 acres of Pamlico Muck underlies the Pocosin Conservation Resource, indicating this is an area that would trigger COD requirements. This translates to 11.3 acres of Pocosin COD. 3. Table 5.7.3.A.5 shows how to calculate required Conservation Space. 4. 11.3 acres * .5 Conservation Space Factor = 5.65 Acres of required conservation space. Swartville Residential – Major Subdivision – TRC Review Page | 6 vi. Please refer to UDO Section 5.7.3.E for methods of setting aside Conservation Space. vii. All structures must be set back at least 25 feet from the Conservation Space Area. 9. UDO Section 5.8, Open Space Requirements a. Total site acreage is 89.90 acres. b. Performance Residential Developments require 20% open space. c. Site plan shows open space at 26.89 acres. This is approximately 30% open space, exceeding the minimum requirements. 10. UDO Article 6, Subdivision Design and Improvements. a. The R-7 district requires sidewalks on both sides of the street. i. The site plan itself appears to show sidewalks on both sides of all streets, but the road cross section only shows sidewalks on one side. b. Block lengths are all less than 1000’ ft, block length is compliant. c. Site plan shows 16 links and 11 nodes, meeting a link to node ratio of 1.45. This is sufficient. d. It appears that the streets in between lots 126-141|162-175, 190-176|191-204, and 218-205|61-44 (the eastern side of the development) are much narrower than the streets in the other parts of the development. Are these intended to be more narrow? e. It appears that the travelway width of the roads is only 20’- per the New Hanover County Private Roadway Design Manual for Private Roads, the travelway needs to be at least 24’ in width. f. The ROW width is sufficient at 50’. 11. UDO Article 9, Flood Damage Prevention a. None of this property is in the floodplain. Swartville Residential – Major Subdivision – TRC Review Page | 7 NHC Fire Services, Ray Griswold 910-798-7448 Compliance with the NC Fire Code 1. This is a preliminary review only for PHASE # 1 2. Additional fire hydrants will be required. You show only show 3 3. Fire hydrants are required at each entrance to the project. The 1,000 foot rule is not as the crow flys, it is measured by driving distance. I do see small dots, are these additional ones??? 4. Where will the water access be coming from? 5. No gates or traffic calming devices allowed unless identified. NHC Engineering, Galen Jamison 910-798-7072 Stormwater management and land disturbance 1. A County stormwater and land disturbing permit issued by the County is required for this project. Please digitally submit the permit applications documentation with requisite review fees to the COAST online permit portal (https://newhanovercountync- energovpub.tylerhost.net/apps/selfservice#/home). Applicable forms can be found at https://www.nhcgov.com/251/Stormwater-Permitting and https://www.nhcgov.com/249/Sediment-Erosion-Control. 2. Page 5 of the application, item 15, indicates the need to show all proposed stormwater and drainage facilities on the site plan. This information will need to be shown prior to Engineering providing approval for TRC. Please ensure the SCM outfall locations are identified, 10’ access along the top of the SCMs are provided for maintenance, how the emergency spillway will outfall for SCM pond A, and how roadside drainage is anticipated. 3. Please contact the State for their stormwater permit requirements. It is anticipated a new high density permit will be required. NHC Environmental Health, Dustin Fenske 910-798-6732 Septic tanks and wells 1. Subdivision must connect to public water and sewer. Lots do not appear large enough to support well and septic systems. 2. Site plan does not appear to reflect any setback issues to well or septic systems (more details is needed.) Swartville Residential – Major Subdivision – TRC Review Page | 8 NHC Addressing, McCabe Watson 910-798-7068 Street naming and property address 1. Please submit street name proposals with alternatives to be approved prior to TRC approval. 2. Please contact me for address assignments following TRC approval. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 Public water and sewer 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan Review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. 3. CFPUA water will require a mainline extension. 4. Sewer will require design, permitting, and construction (at the Developers Expense and to CPFUA Standards) a public Regional Pump Station and Force Main That Discharges Into Existing Force Main (see attached map) 5. CFPUA Meter Sizing Form will be required. 6. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains). 7. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. 8. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. NCDOT, Nick Drees 910-343-3915 Driveway access and state road improvements 1. See attached comments. WMPO, Luke Hutson 910-343-3915 New Hanover County contracted traffic engineering services comments: 1. See attached comments. Swartville Residential – Major Subdivision – TRC Review Page | 9 Army Corps of Engineers, Brad Shaver 910-251-4611 Requirements if wetlands are impacted 1. This proposed development will impact both wetlands and jurisdictional ditches and require permitting, likely an individual permit as impacts appear to be greater than 0.5 of an acre. The phase 2 portion of the development has not received a jurisdictional determination to date. This site has seen on-site restoration which was closed out in August 2024 through enforcement procedures. Project information also provided to the following state agencies and non-regulatory local agencies for their awareness: New Hanover County Emergency Management New Hanover County Schools NC Department of Environmental Quality (DEQ) NC DEQ Division of Coastal Management NC DEQ Division of Energy, Mineral, and Land Resources New Hanover County Sustainability Manager New Hanover County Soil & Water Conservation 8" PVC 8" DIP 8"PVC8" PVC 8"PVC 8"PVC 8 "P V C 8 " P V C 8" PVC 8" PVC 8" P V C 8 "P V C 8"P V C 8"PVC 8 "P V C 1 5"P V C 8" PVC 8"P V C8"PVC 8 "P V C 8 "PVC 8" P V C 8"PVC 8 " P V C 8"PVC 8"PVC 8" PVC 8" DIP 8"PVC 8"PVC 8"PVC 8"PVC 8"PVC 8" PVC 8" PVC 8" PVC 8" PVC 8 "PVC8" PVC 8"PVC 8"PVC8" PVC 10" PVC 10''DI 12'' PVC 2'' HDPE 4'' DI 8''DI 6''DI 12''HDPE 16'' DI 6 ''P V C 3'' PVC 10''PVC 1 6 '' H D P E 2''PVC 4'' PVC 8'' P VC 16''PVC PS-104RunnyMeade 1 PS-105RunnyMeade 2 10" PVC 4"PVC 12" PVC 8" PVC 10" DIP 6" PVC 317 Crowatan Road 06/18/2021Sensitive Public Security Information Non-Releasable per NCGS 132-1.7 This data is from GIS sources.The accuracy can not beguaranteed and should not takethe place of a field survey. 1,000 0 1,000500 1 Inch = 1,000 Feet Legend Proposed Force Main Proposed Water Main 317 Crowatan Road Water Mains 8" or Less (or Unknown) 10" - 12" Greater Than 12" Sewer Gravity Mains ?8" or Less (or Unknown) ?10" - 24" Parcels Elevation Value High : 54 Low : 4 I Map 0399Ver. 2 Kerr Ave C olle g e R d Blue Clay Rd Castle Hayne Rd §¨¦140 I JDH Created: 06/18/21 Last Updated: 1/10/2023S:\TreatmentEngCM\Engineers\2002_Planning and Design Division\Master Planning\0399_317Crowatan Road\Working\317 Crowatan Road - V2.mxd Connect To ExistingWater Main And LoopThrough Development Design, Permit and Construct(At Developers Expense And ToCPFUA Standards) A PublicRegional Pump Station And ForceMain That Discharges Into ExistingForce Main STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JOSH STEIN DANIEL H. JOHNSON GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Memorandum DATE: January 26, 2026 TO: New Hanover County Technical Review Committee SUBJECT: Swartville Residential – 317 Crowatan Road ________________________________________________________________________ These are preliminary comments and are based on the plans as submitted for the proposed site. They are subject to further review upon receipt of any additional information. Subsequently, additional comments and/or requirements may be necessary for this site. General Comments: NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx You can coordinate with the District Office with any questions 910-398-9100. NCDOT Driveway Permit: An NCDOT Driveway permit is not required as the proposed development does not connect to a state-maintained road. NCDOT Encroachment Agreement: An NCDOT Encroachment Agreement may be required for any off-site roadway improvements. • It is recommended that you reach out to the NCDOT District Office prior to submitting plans An NCDOT Encroachment Agreement is required for any utility connections or installations within the NCDOT right-of-way (form 16.6). • Refer to the NCDOT UAM Manual and the NCDOT encroachment checklist for required documents and site plan information. An NCDOT Encroachment Agreement is required for any sidewalk or multi-use paths installed within the NCDOT right-of-way (form 16.6). Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Required Roadway Improvements: It appears that a TIA will be required per the county’s requirements. Refer to the NCDOT Roadway Design Manual for help with the design of any required roadway improvements. Site Plan Comments: Driveway Plan Requirements (roadway improvements): • Provide comprehensive survey within the existing R/W on both sides of the road for a distance of 500’ in all directions from the development’s property lines. Provide additional hydraulic survey data to the nearest storm water inlet/outlet including ditch lines and storm water pipes, if located outside of the 500' distance. • Driveway Profile - In shoulder sections, maintain minimum 2% fall from edge of travel way for required shoulder width distance (6’ minimum). • If the drainage does not naturally flow to the NCDOT right of way the historic drainage pattern should be maintained. • Pipe Cover Minimums (measured from top of pipe to subgrade): o High Density Polyethylene (HDPE): 24” | Corrugated Aluminum (CAP): 12” | Reinforced Concrete (RCP): 12”. • Pipe End Treatment: use parallel pipe end sections. o NCDOT Standards 310.02. • All sizes, types, and invert elevations of existing/proposed pipes and drainage structures must be shown. o Provide spot elevations along frontage of driveway (at EOP and centerline). o Provide grades and spot elevations for existing and proposed ditches. o Show how drainage will be accommodated along property frontage. • Hydraulic calculations and associated plan sheets will need to be submitted for the site. NCDOT Standard Drawings: • Include/update the NCDOT Standard Drawings (2024) that are applicable to the development. Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Sight Triangles and Sight Distance: • Show and label the 10’ X 70’ NCDOT sight triangles. o No obstructions shall be placed within the NCDOT sight triangles. • Show and label the stopping sight distance. o No obstructions shall be placed within the stopping sight distance. Identification Signing and Landscaping: • Identification signing or landscape vegetation within the median and the sight distance triangle must not obstruct the driver’s line of sight. No landscaping or signing will be allowed to exceed 42 inches in height, measured from the Edge of Pavement (EOP) within the median or sight triangle. • All pylon signs in the median or sight distance triangle must provide a vertical clear sight zone between 3 feet-6 inches and 10 feet-0 inches measured from the EOP. Signing located within a clear recovery area shall be of a “breakaway design.” • Only low growing shrubbery, consistent with the NCDOT’s landscaping policies, as contained in the publication “Guidelines for Planting Within Highway Right of Way,” will be allowed within a landscaped median and the sight distance triangle at the entranceway to a development, whether the street or driveway connection to the State Highway System is designated as a public facility or not. Landscaping within the right-of-way and sight distance triangles may require additional approval by the District Engineer. Gated Entrances: • Show and label any proposed gates with distances to the right of way line. NCDOT | Division 3 | District 3 Project Name:_____________________________ Date:_______________ Applicant Checklist NCDOT Checklist Driveway Application Process and Site Plan Requirements ALL APPLICATIONS SHALL BE ACCOMPANIED BY COMPLETE AND DETAILED SITE PLANS THAT ADHERE TO THE POLICIES LISTED IN THE POLICY ON STREET AND DRIVEWAY ACCESS TO NORTH CAROLINA HIGHWAYS AND THIS DOCUMENT. FAILURE TO ADHERE TO THESE POLICIES WILL RESULT IN THE RETURN OF THE APPLICATION TO THE APPLICANT FOR REVISION. ***THE NCDOT WILL NOT BEGIN THE REVIEW PROCESS ON INCOMPLETE APPLICATIONS*** Electronic Pre-Submittals In an effort to save time and resources, we are happy to provide an initial assessment of a driveway permit submittal’s plans via email to identify any major issues up front. This initial assessment can be followed up with a submittal of one digital copy of the plans along with all other required documents. All Permit applications shall be submitted through the online portal https://connect.ncdot.gov/site/Permits/Pages/default.aspx In the notify email section of the portal application please include the District Office email (Div3Dist3@ncdot.gov). See the last pages for further instruction. Online resources: •NCDOT Policy on Street and Driveway Access to North Carolina Highways: https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Policy%20on%20Street%20an d%20Driveway%20Access.pdf •NCDOT Policies and Procedures for Accommodating Utilities on Highway Rights of Way: https://connect.ncdot.gov/municipalities/Utilities/Pages/UtilitiesManuals.aspx •Electronic Forms Database: https://connect.ncdot.gov/Pages/default.aspx 1) a.Cover Letter Include contact information for applicant and engineer, including email address, mailing address, and phone number. Include the parcel number(s), description of all phases of the development and future land uses to be served by the permit, and a description of the adjoining land owned or controlled by the applicant. b.NCDOT Street and Driveway Access Permit Application (form downloadable via link below) https://connect.ncdot.gov/resources/BusinessForms/TEB-65-04.doc c.$50.00 Inspection Fee Per Access Point Attach to Permit Application form (not applicable for municipalities, churches, and schools) d.NPDES Stormwater Permit Compliance Certification (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/NPDESstatement.doc e.Verification of Compliance with Environmental Regulations (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/VCER-1.pdf f.Site Plans (to include the “Master Plan” of a tract even if only a small portion is being developed first) Additional site plan requirement details can be found in section 2 of this document. g.Design Plan Requirements for projects involving roadway improvements If roadway improvements are required as part of the permit, then roadway plans, pavement marking plans,signing plans, and traffic control plans will be required - See Section 6 for more information Y N n/a Engineering Studies The applicant may be required by the District Engineer to submit studies based on, but not limited to, the parameters outlined herein. If study requirements of the local government agency are more restrictive than the NCDOT requirements, then local government requirements will govern. However, this does not imply that the NCDOT is obligated to approve entrance designs that are too constrictive to allow smooth and safe traffic flow. All studies including, but not limited to, Traffic Impact Analyses (TIA), traffic signal studies, and drainage studies, must be prepared under the direct charge of and sealed by a North Carolina licensed Professional Engineer. Section 1: Requi red Documents |Required documents to accompany all Initial Driveway Application Submittals Please note that these are the minimum requirements of all driveway permit applications. All required documentation shall be submitted through the online portal as PDF files, with the exception of the Performance and Indemnity Bond and the $50 Inspection Fee(s), these should be mailed or delivered to 5501 Barbados Blvd, Castle Hayne, NC 28429. If a Traffic Impact Analysis and/or roadway improvements are deemed necessary as a condition of the permit, there may be additional submittal materials required. State of North Carolina | Department of Transportation | Division 3 | District 3 5501 Barbados Blvd, Castle Hayne, NC 28429 Form Updated 10/15/2021 (910) 398-9100 T NCDOT Permit #___________________ Y N n/a Section 1: Required Documents (continued) 2)Required documents to accompany all Driveway Applications PRIOR TO FINAL APPROVAL a.Site Plans One (1) digital copy (PDF) unless otherwise requested by the District Office. Additional site plan requirement details can be found in section 2 of this document. b.Performance and Indemnity Bond Information/Forms See last page of document for bond information and forms c.Performance and Indemnity Bond Amount 100% of the cost of the work within NCDOT Right-of-Way (R/W) based on the attached estimate determined by the applicant's engineer and approved by the District Engineer. Bond hold letter required for for municipalities, churches, and schools. See pages 101-105 in the Policies and Procedures for Accommodating Utilities on Highway Rights of Way for acceptable bond types d.Radius Encroachment Letter (if applicable) If driveway radius encroaches on the frontage of an adjacent property, a Radius Encroachment will be required e.Hold Harmless Letter (if applicable) If the Permit is within the limits of an active NCDOT project, a Hold Harmless letter from the NCDOT contractor will be required. If the project is in preconstruction, coordinate with the Department's Project Development Unit Section 2: General Site Plan Requirements | All site plans shall include and show, at a minimum, the items listed below Page numbers reference the NCDOT Policy on Street and Driveway Access to North Carolina Highways 1)Drawn to a scale of 20, 30, 40, or 50 feet per inch and the scale shall be shown 2)North arrow, vicinity map, date of plan, and date of most-recent revision if applicable 3)Contact information of applicant and engineer, including mailing address, phone number, and email address 4)Show R/W lines, highway control of access, and property lines 5)All existing utilities (including handholes) and easements 6)R/W width 7)Existing posted speed limit(s) and design speed limit(s) 8)Show all property lines, intersections, signals, signal loops, railroads, or crossovers within 500’ in all directions of the property lines of the proposed development 9)Show location of sidewalks, crosswalks, greenways, multi-use paths, curb ramps, railroads, bus stops, and any other relevant transportation facilities in the development area 10)Include a plan sheet showing full site build-out and land use 11)Buildings shown with “gross leasable area” 12)Width of property frontage 13)Distance from R/W to buildings and gasoline service islands 14)Distance from R/W to existing/proposed Edge of Pavement (EOP) (pages 32 & 34) 15)All streams, bridges, retaining walls, signs, or other fixed objects such as trees, utility poles, traffic signals, etc. Section 3: Driveway Plan Requirements | All driveway plans shall include and show, at a minimum, the items listed below 1)Provide comprehensive survey within the existing R/W on both sides of the road for a distance of 500’ in all directions from the development’s property lines. Provide additional hydraulic survey data to the nearest storm water inlet/outlet including ditch lines and storm water pipes, if located outside of the 500' distance. 2)Lane configurations and widths of all existing and proposed driveways, roadways, and adjacent roadways 3)All driveway widths (2-way: 20’ minimum, 36’ maximum | 1-way: 12’ minimum, 24’ maximum | with island: 14'ingress, 18' egress) (pages 50 & 77) 4)Driveway Profile - In shoulder sections, maintain minimum 2% fall from edge of travel way for required shoulder width distance Primary: 8’ minimum | Secondary: 6’ minimum 5)All existing and/or proposed driveway radii (20’ minimum, 50’ maximum, 30’ typical) (pages 34 & 51) In curb and gutter sections, use City of Wilmington flare (SD 3-03.3) - (see attached) In shoulder sections, show grades at the EOP and centerline 6)No curbing is allowed within NCDOT R/W along shoulder sections except as part of a driveway island (page 31) 7)Driveway angles of approach to existing roadway (90° preferred, 75°-90° required for 2-way driveways, 45°-90° allowed for right-in/right-out on a case-by-case basis) (page 51) 8)Driveway Profile (pages 42- 43) Y N n/a Y N n/a □□ □□ □ □ Y N n/a Y N n/a Y N n/a Y N n/a Section 3: Driveway Plan Requirements (continued) 9)Driveway Pavement Cross Section (to be in place from EOP to edge of R/W) Asphalt: 8” ABC stone and 1.5” S9.5B Concrete: 6” of concrete 10)Driveway Offset (driveway EOP to property line; page 75): Minimum: 20’ 11)Corner Clearance (radius point to radius point; page 52)Minimum: 50’ Desirable: 100’ or Municipal std. 12)Minimum 10’x70’ sight triangles at driveways (measured from and along the R/W line) (page 31) 13)Sight Distance (length of sight-distance in both directions shown for each driveway; pages 27-29) 14)Driveways should be aligned with existing opposing driveways or correct offset should be provided (pages 40-41) 15)Distance between driveways being requested (if applicable; page 51) 16)Minimum internal storage areas with specified queues (pages 31-33) 17)Minimum protected driveway stem(s) provided and indicated (pages 33-34) 18)Indicate any gated entrances (100’ minimum setback from R/W required) - traffic queuing study may be required | Section 6: Roadway Plan Requirements If off-site improvements are required, roadway plans shall show, at a minimum, the items below 1)Full width typical sections must be shown (paved shoulders to match the typical section of the adjacent roadway) 2)Minimum Asphalt Typical Section (for turn lanes and/or paved shoulders) Adjacent recently-completed or upcoming TIP projects w/ different typical sections may supersede those below •Primary Routes (US & NC) and Secondary Routes with Annual Average Daily Traffic (AADT) ≥10,000 5.5” B25.0C, 3” I19.0C, 1.5” S9.5C; any overlay of existing pavement is to be a minimum of 1.5” S9.5C •Secondary Routes with AADT<10,000 5.5” B25.0C, 1.5” S9.5B; any overlay of existing pavement is to be a minimum of 1.5” S9.5B 3)Pavement overlay is required if modification of existing pavement markings and/or lanes is necessary The grinding of pavement markings will not be allowed 4)Shoulder Widths (Paved + Unpaved) Primary: 8’ minimum | Secondary: 6’ minimum 5)Ditch Slopes - front and back slopes - minimum 3:1 or flatter 6)Indicate existing roadway grade 7)All taper lengths and deceleration lengths should be appropriately designed for the given design speed (page 78) 8)All turn lanes should be designed according to the Driveway Manual and Roadway Standard Drawings (page 79) See 1205.04 Sheets 1 & 2 and 1205.05 Sheet 1 of the Roadway Standard Drawings for details 9)Pavement marking and signing plans are required - plans must be approved by Division Traffic Services 10)Traffic control plans are required - Detailed phasing plans may be required based on project type and location 11)New and/or revised signal plans must be included for new installations and if signal modifications are required All signal plans must be reviewed and approved by Division Traffic Services and the Signal Design Unit. A Traffic Agreement must be completed to facilitate the review. Contact Division Traffic Services at (910) 341-2200. | Section 4: Drainag e Requirements All drainage features on NCDOT Right-of-Way shall adhere to, at a minimum, the items listed below Section 5: Internal Circ ulation Requirements |All internal circulation details shall adhere to, at a minimum, the items listed below 1)Interior driveway channelization stems Minimum 100’ from the ROW or at the discretion of the District Engineer 2)Traffic flow pattern 3)Traffic control devices 4)Pavement Markings Y N n/a Y N n /a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a 1)Pipe Cover Minimums (measured from top of pipe to subgrade) High Density Polyethylene (HDPE): 24” | Corrugated Aluminum (CAP): 12” | Reinforced Concrete (RCP): 12” 2)Pipe End Treatment (see Roadway Design Manual 5-20, B-2) Pipes ≤24" on multilane highways posted above 45mph require Parallel Pipe End Sections See 310.02 and 310.04 of the Roadway Standard Drawings for details Pipes >30" on multilane highways posted above 45mph require guardrail Pipes ≥36" require an endwall on the inlet end 3)All proposed Drainage is to be provided inside existing R/W. Otherwise, additional R/W or a permanently dedicated drainage easement will be required to accommodate the proposed project drainage 4)All sizes, types, and invert elevations of existing/proposed pipes and drainage structures must be shown(see Sec.3 #1 for survey requirements) 5)Provide spot elevations along frontage of driveway (at EOP and centerline) 6)Provide grades and spot elevations for existing and proposed ditches 7)Show how drainage will be accommodated along property frontage(District Engineer may require applicant to provide drainage calculations when warranted) C/L EOTEOP P/L R/WR/W R/W EOP EOP EOP EOP NTS R/W P/L DRAINAGE FLOW DRAINAGE FLOW DRAINAGE FLOW SHOULDER WIDTH SHOULDER WIDTH SHOULDER WIDTH SHOULDER WIDTH S IGHT T R IANGLE 10 ' BY 70 'S I GHT T R I AN G L E10' B Y 70' DRIVEWAY RR MIN. 30'MIN. 30' NO ROADWAY IMPROVEMENT COMMERCIAL DRIVEWAY WITH NORMAL CROWN ROADWAY 6" LOWER THAN THE EDGE OF PAVEMENTMIN 2% FALL AWAY or 20' AWAY FROM THE PROPERTY LINEDRIVEWAY SHALL BE LOCATED AT LEAST PIPE/TYPE/SIZE WIDTH CON CR ET E /ASP HA LT LOCAL NAME ROAD POSTED SPEED ( ) MPH WIDTH WIDTHSR NUMBER SITE ADDRESS:TAX PARCEL # 20191115 PARALLEL END S.D. 310.02 INVERT ELEVATION PARALLEL END S.D. 310.02 INVERT ELEVATION 20' AWAY FROM THE PROPERTY LINEDRIVEWAY SHALL BE LOCATED AT LEAST OR 500' OF XYZ SURVEY DATA PAST THE PROPERT LINENEAREST OUTFALL ELEVATION OR 500' OF XYZ SURVEY DATA PAST THE PROPERT LINENEAREST OUTFALL ELEVATION 125' 50' 15'8' TC 2 EN G I N E E R I N G , P L L C 91 0 - 5 4 7 - 5 8 5 6 20 1 N . F r o n t S t r e e t Su i t e M - 1 0 8 Wil m i n g t o n , N C 2 8 4 0 1 PRE L I M I N A R Y NFeet1:125 5002500125 LOCATION MAP NTSN SITE SITE DATA PARCEL ID: R02500-002-030-000ZONING: R-20 TOTAL TRACT AREA: 89.90 AC (GROSS) DISTURBED/DEVELOPED AREA: 57.57 AC (NET) TOTAL UNITS: 190 UNITS DENSITY: 2.11 UNITS / ACRE TYPICAL LOT DETAIL 1"=30'N 24'50' A STATE EROSION CONTROL PERMIT WILL BE REQUIRED.A COUNTY SW PERMIT WILL BE REQUIRED.COUNTY SW REQUIREMENTS: PRE/POST FOR THE 1, 10 AND 25 YEAR DESIGN STORMS.SCMS MUST BE ABLE TO HANDLE THE 100YR STORM WITHOUT OVERTOPPING. SE A B O A R D C O A S T L I N E R A I L R O A D I-140 WIL M I N G T O N B Y P A S S SITE TC 2 EN G I N E E R I N G , P L L C 91 0 - 5 4 7 - 5 8 5 6 20 1 N . F r o n t S t r e e t Su i t e M - 1 0 8 Wil m i n g t o n , N C 2 8 4 0 1 PRE L I M I N A R Y NFeet1:125 5002500125 LOCATION MAP NTSN MEMORANDUM To: New Hanover County Technical Review Committee Date: January 22, 2026 Subject: Swartville Residential NCDOT Projects: • N/A WMPO 2045 MTP Projects: • N/A New Hanover County Projects: • N/A TIA: Based upon the proposed estimated Trip Generation Numbers for the AM and/or PM peak hour Swartville Residential a TIA is required. Please contact Caitlin Cerza, the Transportation Planning Engineer at Caitlin.Cerza@wilmingtonnc.gov or (910) 473-5130 to begin the TIA Scoping process for this development Land Use (ITE Code) Intensity Unit 24 Hour Volumes AM Peak Hour Trips PM Peak Hour Trips Single Family Detached (210) 292 DU 1,997 146 200 Northchase Flex Building – 3411 Merchant Court – TRC Review Page | 1 To: The Camp Group, LLC From: Amy Doss, Development Planner Date: February 4, 2026 Technical Review Committee (TRC) PID#: R02612-002-011-000 Egov# SITECN-26-000002 Subject: 3411 Merchant Court – Northchase Flex Building - TRC Review Technical Review Committee (TRC) General Information The TRC is a staff-level group of local government officials that reviews projects for compliance with the local regulations administered by each respective review agency. Voluntarily participating state agencies may also provide comments. And general information and non-binding recommendations about the site may also be provided by government agencies. The TRC meetings are considered staff meetings and are not public hearings. The TRC meeting is an opportunity for applicants to speak with county staff and any voluntarily participating state or federal agencies about the review comments they have been provided. No voting is involved in the TRC process, and no final approvals or denials are made at the TRC meetings. Following the TRC meeting, applicants are responsible for updating their plans to address review comments. Those revised plans need to be resubmitted to the assigned case planner. The case planner will facilitate additional reviews until all comments have been addressed, and the necessary departments have stated the plans comply with the applicable minimum requirements for development. Following any future TRC approval, the project is required to obtain additional permits to include a zoning compliance permit for the site. Applicants are also responsible for coordinating with state and federal agencies for compliance with any additional requirements. Any activity on the property that is not approved as part of the TRC review and zoning compliance permit will be considered a violation of the UDO and subject to enforcement action under Article 12 Violations and Enforcement. The following comments have been received for the February 4, 2026, TRC meeting. Additional comments may be made upon further review of subsequent revisions. Northchase Flex Building – 3411 Merchant Court – TRC Review Page | 2 Planning, Amy Doss 910-798-7571 Compliance with local UDO requirements 1. General Comments a. Northchase PD zoning district (7-1-1985, Case Z-231). b. As stated in the application the intended use is contractor office. The Unified Development Ordinance (UDO) defines the use as: i. An establishment primarily engaged in the day-to-day administrative and clerical services for businesses providing contracted services, such as building contractors, heating and air conditioning (HVAC) repair, landscaping and janitorial services, etc., that require outside and/or fleet storage. The use may include some on-site repair and material preparation work. c. The Planning and Land Use Department’s review of the site is for compliance with the UDO and use specific requirements of the specified land use. Any other activity that might occur on the property beyond the definition above should be noted on the application and site plan for additional review and comment. d. Easements are noted on the subdivision plat. Please show these on the landscape plan and site plan as well. e. Please confirm whether there are Duke Energy Transmission Lines/Easement on the Property. 2. UDO Section 5.1, Parking and Loading a. Use requires 3 parking spaces for every 1,000 square feet of building area. Project proposes 7,400 square feet. Required parking is (3 x 7.4) 22. Site plan shows 15 parking spaces. Please provide additional spaces, a parking demand study, or a shared parking agreement. 3. UDO Section 5.2, Traffic, Access and Connectivity a. Please note that no building permit for any structure shall be issued which requires NCDOT approval for a Driveway Permit until NCDOT has issued the permit approval. Evidence of approval shall accompany the application for building permit. b. The WMPO estimates 17 AM and 49 PM peak hour trips. No TIA is required. 4. UDO Section 5.3, Tree Retention a. No tree removal is necessary as it appears no trees are on the site. 5. UDO Section 5.4, Landscaping and Buffering Northchase Flex Building – 3411 Merchant Court – TRC Review Page | 3 a. Foundation and street yard plantings are sufficient. Please provide parking lot interior and perimeter landscaping, as well as trees required for disturbed acreage (15 trees per acre) to assure compliance with section 5.4. b. All planting materials must comply with the approved planting materials listed in the New Hanover County Tree & Landscaping Manual. The species and size must be listed in the final landscape plan indicating compliance with the manual. Or evidence the proposed plant species are acceptable from the county Agricultural Extension office. 6. UDO Section 5.5, Lighting a. Please note that a lighting plan is not required for TRC approval but will be required prior to issuance of construction plan approvals. b. Is any lighting proposed for the site? 7. UDO Section 5.6, Signs a. Is this the location of a sign? If so, please show the required DOT sight triangles on the plan and the sign location must be outside the sight triangles. If not, are any signs planned? b. For any signs on the site, a separate sign permit must be submitted and reviewed by the county for compliance with Section 5.6 of the UDO for standards at or after the submittal of the separate zoning compliance and construction permits for the primary building or use. Any approvals granted by the TRC for the site design is not an approval for the ultimate size or placement of the sign. 8. UDO Section 5.7, Conservation Resources a. The conservation resources map does not indicate any conservation resources impacting the property, this section does not apply. 9. UDO Article 9, Flood Damage Prevention a. Site is not in the floodplain. Northchase Flex Building – 3411 Merchant Court – TRC Review Page | 4 NHC Fire Services, Ray Griswold 910-798-7448 Compliance with NC Fire Code 1. Fire finals required 2. Portable fire extinguishers per NFPA 10 3. No storage over 12 foot high unless permitted through this office NHC Engineering, Galen Jamison 910-798-7072 Stormwater management and land disturbance 1. A revision to ATC# 64/108-1/2/03 REV will be required. Please include all requisite calculations for the proposed conveyance systems and documentation that the offsite SCM is sized for the proposed impervious area. Please digitally submit the permit applications documentation revisions with requisite review fees and a new STMW permit will be assigned 23-0039 to the COAST online permit portal (https://newhanovercountync- energovpub.tylerhost.net/apps/selfservice#/home. 2. A land disturbing permit issued by the County is required for this project. Please digitally submit the permit applications documentation with requisite review fees to the COAST online permit portal (https://newhanovercountync-energovpub.tylerhost.net/apps/selfservice#/home). Applicable forms can be found at https://www.nhcgov.com/249/Sediment-Erosion-Control. 3. Please contact the State for their stormwater permit requirements. NHC Environmental Health, Dustin Fenske 910-798-6732 Septic tanks and wells 1. Site plan reflects connection to public water and sewer. All surrounding properties are on public water and sewer. NHC Addressing, McCabe Watson 910-798-7068 Street naming and property address 1. Please contact me for unit addresses following TRC approval. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 Public water and sewer 1. CFPUA TRC Comments provided are preliminary comments only. Northchase Flex Building – 3411 Merchant Court – TRC Review Page | 5 2. Utility Plan Review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. 3. CFPUA water and sewer available. 4. CFPUA Meter Sizing Form will be required. 5. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains). 6. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. 7. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. NCDOT, Nick Drees 910-343-3915 Driveway access and state road improvements 1. No comments provided at this time. WMPO, Luke Hutson 910-343-3915 New Hanover County contracted traffic engineering services comments: 1. Comments attached. Project information also provided to the following state agencies and non-regulatory local agencies for their awareness: New Hanover County Emergency Management New Hanover County Schools NC Department of Environmental Quality (DEQ) NC DEQ Division of Coastal Management NC DEQ Division of Energy, Mineral, and Land Resources NHC Soil & Water Conservation NHC Sustainability Manager, Madelyn Wampler Army Corps of Engineers, Brad Shaver MEMORANDUM To: New Hanover County Technical Review Committee Date: January 22, 2026 Subject: 3411 Merchant Court - Northchase Flex Space NCDOT Projects: • N/A WMPO 2050 MTP Projects: • N/A New Hanover County Projects: • N/A TIA: Based on the 11th edition ITE Trip Generation Manual, a TIA is not required. Land Use (ITE Code) Intensity Unit 24 Hour Volumes AM Peak Hour Trips PM Peak Hour Trips Strip Retail Plaza (822) 7,400 SF 403 17 49 Atlantic Glass – 3303 N Kerr Ave – TRC Review Page | 1 To: Shayla Sochalski, Skye Property Holdings, (dsochalski@atlanticglass.net) From: Zach Dickerson, Senior Planner Date: February 4, 2026 Technical Review Committee (TRC) PID#: R03316-004-006-000 Egov# SITECN-26-000001 Subject: 3303 N Kerr Ave – Atlantic Glass - TRC Review Technical Review Committee (TRC) General Information The TRC is a staff-level group of local government officials that reviews projects for compliance with the local regulations administered by each respective review agency. Voluntarily participating state agencies may also provide comments. And general information and non-binding recommendations about the site may also be provided by government agencies. The TRC meetings are considered staff meetings and are not public hearings. The TRC meeting is an opportunity for applicants to speak with county staff and any voluntarily participating state or federal agencies about the review comments they have been provided. No voting is involved in the TRC process, and no final approvals or denials are made at the TRC meetings. Following the TRC meeting, applicants are responsible for updating their plans to address review comments. Those revised plans need to be resubmitted to the assigned case planner. The case planner will facilitate additional reviews until all comments have been addressed, and the necessary departments have stated the plans comply with the applicable minimum requirements for development. Following any future TRC approval, the project is required to obtain additional permits to include a zoning compliance permit for the site. Applicants are also responsible for coordinating with state and federal agencies for compliance with any additional requirements. Any activity on the property that is not approved as part of the TRC review and zoning compliance permit will be considered a violation of the UDO and subject to enforcement action under Article 12 Violations and Enforcement. The following comments have been received for the February 4, 2026, TRC meeting. Additional comments may be made upon further review of subsequent revisions. Atlantic Glass – 3303 N Kerr Ave – TRC Review Page | 2 Planning, Zach Dickerson, zdickerson@nhcgov.com Compliance with local UDO requirements 1. General Comments a. The zoning district is I-1, Light Industrial b. As stated in the application the intended use is Retail/Office. The Unified Development Ordinance (UDO) defines the use as i. Retail Sales, General: Commercial enterprises that provide goods and/or services for sale, lease, or rental directly to the consumer. Examples include stores selling, leasing, or renting consumer, home, and business goods such as art, clothing, dry goods, electronic equipment, furniture, garden supplies, hardware, jewelry, pet food, and printed material. ii. Office for Private Business and Professional Activities: Establishments primarily engaged in the day-to-day administrative or clerical services for businesses or other organizations that provide professional or other services to the general public on a walk-in or appointment basis in an office setting. c. The Planning and Land Use Department’s review of the site is for compliance with the UDO and use specific requirements of the specified land use. Any other activity that might occur on the property beyond the definition above should be noted on the application and site plan for additional review and comment. 2. UDO Section 5.1, Parking and Loading a. Both Retail Sales, General and Offices for Private Business and Professional Activities require 2.5 parking spaces per 1,000 feet of use. b. 8,750 sq ft building would require 22 parking spaces. c. Site plan shows 22 parking spaces for this new building, parking is sufficient. d. The ADA parking spaces will also need to meet the 9’x18’ minimum for 90° parking spaces. 3. UDO Section 5.2, Traffic, Access and Connectivity a. Please note that no building permit for any structure shall be issued which requires NCDOT approval for a Driveway Permit until NCDOT has issued the permit approval. Evidence of approval shall accompany the application for building permit. b. Include the WMPO’s estimated AM and PM traffic generation. If either AM or PM peak hour exceeds 100 trips, state a TIA is required. Atlantic Glass – 3303 N Kerr Ave – TRC Review Page | 3 4. UDO Section 5.3, Tree Retention a. The site plan notes that there are trees planned to be removed here, please apply for a Tree Removal Permit. b. The permit application can be found here: https://www.nhcgov.com/DocumentCenter/View/1239/Tree-Removal-Permit-PDF c. Note: Land disturbance permits can be issued by county Engineering before a Tree Removal Permit is approved by Planning. However, any trees removed before the Tree Removal Permit is issued may result in enforcement action under Section 5.3.2 of the Unified Development Ordinance to include prohibiting any development of the site for 3 to 5 years. 5. UDO Section 5.4, Landscaping and Buffering a. It appears there is already street yard for this site. Please confirm that it will remain. It is sufficient for the building expansion. b. Foundation plantings look fine too, thanks! c. Please confirm parking lot landscaping- this is calculated at 8% of the area used for parking and interior drive aisles. d. Per UDO Section 5.4.2.B, 15 trees must be planted or retained per acre disturbed. Per the application, 0.98 acres are being disturbed, so 15 trees would be required to be planted or disturbed on the site. This can be achieved through landscape plantings, including parking lot trees, and trees around the perimeter of the site. e. A transitional landscape buffer is required for this site, to the west and south where the site abuts residential lots. a. It appears that there is already a transitional buffer for this site to the west, but it is not wide enough. b. The transitional buffer is calculated at a minimum of 50% of the required setback. c. The I-1 district requires a minimum of 50’ side setback from residential uses, so the transitional buffer needs to be a minimum of 25’ in width. d. Per Table 5.4.1.B, the width of the transitional buffer along the western boundary of the site will need to be brought up to current standards. f. All planting materials must comply with the approved planting materials listed in the New Hanover County Tree & Landscaping Manual. The species and size must be listed in the final landscape plan indicating compliance with the manual. Or evidence the proposed plant species are acceptable from the county Agricultural Extension office. Atlantic Glass – 3303 N Kerr Ave – TRC Review Page | 4 6. UDO Section 5.5, Lighting a. Please note that a lighting plan is not required for TRC approval but will be required prior to issuance of construction plan approvals. b. Is any lighting proposed for the site? 7. UDO Section 5.6, Signs a. There is already a sign on the site for Atlantic Glass- will another sign be added? b. For any signs on the site, a separate sign permit must be submitted and reviewed by the county for compliance with Section 5.6 of the UDO for standards at or after the submittal of the separate zoning compliance and construction permits for the primary building or use. Any approvals granted by the TRC for the site design is not an approval for the ultimate size or placement of the sign. 8. UDO Section 5.7, Conservation Resources a. There are no Conservation Resources on this site. 9. UDO Article 9, Flood Damage Prevention a. None of this site is in the floodplain. NHC Fire Services, Ray Griswold 910-798-7448 Compliance with NC Fire Code 1. Fire finals required. 2. Portable fire extinguishers required per NFPA 10 3. No storage over 12 foot high, unless approved by this office and the proper fire protections are met. NHC Engineering, Galen Jamison 910-798-7072 Stormwater management and land disturbance 1. There appears no increase in impervious surface or proposed conveyance measures from the original permit, ATC-322-07/12/06. If so, there is no requirement for a county issued stormwater report. 2. It appears the limits of disturbance is less than 1 acre and the original common plan of development is greater than 7 years. If so, there is no requirements for a land disturbing Atlantic Glass – 3303 N Kerr Ave – TRC Review Page | 5 permit but appropriate measures as indicated on the site plan shall be provided. The building permit application will need to include the final designed site plan. 3. Should either of the above statements become false, a stormwater and/or land disturbing permit may be required. 4. Please contact the State for their stormwater permit requirements. It is anticipated a minor modification to SW8 060636 will be required. NHC Environmental Health, Dustin Fenske 910-798-6732 Septic tanks and wells 1. Existing structure on this property is connected to public water. The new structure must connect to public water as well. 2. Site plan and improvements reflect maintaining the septic system and repair area with no paving or setback issues related to the existing system. The site plan indicates the new building will have a septic system. The building will need an approved septic permit prior to application. Appropriate applications will need to be made to NHC Environmental Health or a Private Soil Scientist and corresponding permits issued. NHC Addressing, McCabe Watson 910-798-7068 Street naming and property address 1. Proposed building and units will need their own individual address. Please contact me for address assignments following TRC approval. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 Public water and sewer 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan Review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. 3. CFPUA water available. Atlantic Glass – 3303 N Kerr Ave – TRC Review Page | 6 4. Further evaluation will need to be completed to determine if a forcemain-to-forcemain connection can be done for sewer. 5. CFPUA Meter Sizing Form will be required. 6. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains). 7. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. 8. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. NCDOT, Nick Drees 910-343-3915 Driveway access and state road improvements 1. Please see attached comments. WMPO, Luke Hutson 910-343-3915 New Hanover County contracted traffic engineering services comments: 1. Please see attached comments. Army Corps of Engineers, Brad Shaver 910-251-4611 Information or Requirements if wetlands are impacted 1. No comments on this site. Atlantic Glass – 3303 N Kerr Ave – TRC Review Page | 7 Project information also provided to the following state agencies and non-regulatory local agencies for their awareness: New Hanover County Emergency Management New Hanover County Schools NC Department of Environmental Quality (DEQ) NC DEQ Division of Coastal Management NC DEQ Division of Energy, Mineral, and Land Resources New Hanover County Sustainability Manager STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JOSH STEIN DANIEL H. JOHNSON GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Memorandum DATE: January 26, 2026 TO: New Hanover County Technical Review Committee SUBJECT: Atlantic Glass – 3303 North Kerr Avenue ________________________________________________________________________ These are preliminary comments and are based on the plans as submitted for the proposed site. They are subject to further review upon receipt of any additional information. Subsequently, additional comments and/or requirements may be necessary for this site. General Comments: NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx You can coordinate with the District Office with any questions 910-398-9100. NCDOT Driveway Permit: An NCDOT Driveway Permit is required. Submit plans in accordance with pages 14 and 15 of the Policy on Street and Driveway Access to North Carolina Highways to include access locations within 500’ of the proposed access on both sides of the State Road. Submit to the local NCDOT District Engineer’s Office. • Refer to the NCDOT checklist (included) for required documents and site plan information. NCDOT Encroachment Agreement: An NCDOT Encroachment Agreement is required for any utility connections or installations within the NCDOT right-of-way (form 16.6). • Refer to the NCDOT UAM Manual and the NCDOT encroachment checklist for required documents and site plan information. An NCDOT Encroachment Agreement is required for any sidewalk or multi-use paths installed within the NCDOT right-of-way (form 16.6). Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Site Plan Comments: NCDOT Standard Drawings: • Include/update the NCDOT Standard Drawings (2024) that are applicable to the development. Sight Triangles and Sight Distance: • Show and label the 10’ X 70’ NCDOT sight triangles. o No obstructions shall be placed within the NCDOT sight triangles. • Show and label the stopping sight distance. o No obstructions shall be placed within the stopping sight distance. Identification Signing and Landscaping: • Identification signing or landscape vegetation within the median and the sight distance triangle must not obstruct the driver’s line of sight. No landscaping or signing will be allowed to exceed 42 inches in height, measured from the Edge of Pavement (EOP) within the median or sight triangle. • All pylon signs in the median or sight distance triangle must provide a vertical clear sight zone between 3 feet-6 inches and 10 feet-0 inches measured from the EOP. Signing located within a clear recovery area shall be of a “breakaway design.” • Only low growing shrubbery, consistent with the NCDOT’s landscaping policies, as contained in the publication “Guidelines for Planting Within Highway Right of Way,” will be allowed within a landscaped median and the sight distance triangle at the entranceway to a development, whether the street or driveway connection to the State Highway System is designated as a public facility or not. Landscaping within the right-of-way and sight distance triangles may require additional approval by the District Engineer. Gated Entrances: • Show and label any proposed gates with distances to the right of way line. NCDOT | Division 3 | District 3 Project Name:_____________________________ Date:_______________ Applicant Checklist NCDOT Checklist Driveway Application Process and Site Plan Requirements ALL APPLICATIONS SHALL BE ACCOMPANIED BY COMPLETE AND DETAILED SITE PLANS THAT ADHERE TO THE POLICIES LISTED IN THE POLICY ON STREET AND DRIVEWAY ACCESS TO NORTH CAROLINA HIGHWAYS AND THIS DOCUMENT. FAILURE TO ADHERE TO THESE POLICIES WILL RESULT IN THE RETURN OF THE APPLICATION TO THE APPLICANT FOR REVISION. ***THE NCDOT WILL NOT BEGIN THE REVIEW PROCESS ON INCOMPLETE APPLICATIONS*** Electronic Pre-Submittals In an effort to save time and resources, we are happy to provide an initial assessment of a driveway permit submittal’s plans via email to identify any major issues up front. This initial assessment can be followed up with a submittal of one digital copy of the plans along with all other required documents. All Permit applications shall be submitted through the online portal https://connect.ncdot.gov/site/Permits/Pages/default.aspx In the notify email section of the portal application please include the District Office email (Div3Dist3@ncdot.gov). See the last pages for further instruction. Online resources: •NCDOT Policy on Street and Driveway Access to North Carolina Highways: https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Policy%20on%20Street%20an d%20Driveway%20Access.pdf •NCDOT Policies and Procedures for Accommodating Utilities on Highway Rights of Way: https://connect.ncdot.gov/municipalities/Utilities/Pages/UtilitiesManuals.aspx •Electronic Forms Database: https://connect.ncdot.gov/Pages/default.aspx 1) a.Cover Letter Include contact information for applicant and engineer, including email address, mailing address, and phone number. Include the parcel number(s), description of all phases of the development and future land uses to be served by the permit, and a description of the adjoining land owned or controlled by the applicant. b.NCDOT Street and Driveway Access Permit Application (form downloadable via link below) https://connect.ncdot.gov/resources/BusinessForms/TEB-65-04.doc c.$50.00 Inspection Fee Per Access Point Attach to Permit Application form (not applicable for municipalities, churches, and schools) d.NPDES Stormwater Permit Compliance Certification (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/NPDESstatement.doc e.Verification of Compliance with Environmental Regulations (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/VCER-1.pdf f.Site Plans (to include the “Master Plan” of a tract even if only a small portion is being developed first) Additional site plan requirement details can be found in section 2 of this document. g.Design Plan Requirements for projects involving roadway improvements If roadway improvements are required as part of the permit, then roadway plans, pavement marking plans,signing plans, and traffic control plans will be required - See Section 6 for more information Y N n/a Engineering Studies The applicant may be required by the District Engineer to submit studies based on, but not limited to, the parameters outlined herein. If study requirements of the local government agency are more restrictive than the NCDOT requirements, then local government requirements will govern. However, this does not imply that the NCDOT is obligated to approve entrance designs that are too constrictive to allow smooth and safe traffic flow. All studies including, but not limited to, Traffic Impact Analyses (TIA), traffic signal studies, and drainage studies, must be prepared under the direct charge of and sealed by a North Carolina licensed Professional Engineer. Section 1: Requi red Documents |Required documents to accompany all Initial Driveway Application Submittals Please note that these are the minimum requirements of all driveway permit applications. All required documentation shall be submitted through the online portal as PDF files, with the exception of the Performance and Indemnity Bond and the $50 Inspection Fee(s), these should be mailed or delivered to 5501 Barbados Blvd, Castle Hayne, NC 28429. If a Traffic Impact Analysis and/or roadway improvements are deemed necessary as a condition of the permit, there may be additional submittal materials required. State of North Carolina | Department of Transportation | Division 3 | District 3 5501 Barbados Blvd, Castle Hayne, NC 28429 Form Updated 10/15/2021 (910) 398-9100 T NCDOT Permit #___________________ Y N n/a Section 1: Required Documents (continued) 2)Required documents to accompany all Driveway Applications PRIOR TO FINAL APPROVAL a.Site Plans One (1) digital copy (PDF) unless otherwise requested by the District Office. Additional site plan requirement details can be found in section 2 of this document. b.Performance and Indemnity Bond Information/Forms See last page of document for bond information and forms c.Performance and Indemnity Bond Amount 100% of the cost of the work within NCDOT Right-of-Way (R/W) based on the attached estimate determined by the applicant's engineer and approved by the District Engineer. Bond hold letter required for for municipalities, churches, and schools. See pages 101-105 in the Policies and Procedures for Accommodating Utilities on Highway Rights of Way for acceptable bond types d.Radius Encroachment Letter (if applicable) If driveway radius encroaches on the frontage of an adjacent property, a Radius Encroachment will be required e.Hold Harmless Letter (if applicable) If the Permit is within the limits of an active NCDOT project, a Hold Harmless letter from the NCDOT contractor will be required. If the project is in preconstruction, coordinate with the Department's Project Development Unit Section 2: General Site Plan Requirements | All site plans shall include and show, at a minimum, the items listed below Page numbers reference the NCDOT Policy on Street and Driveway Access to North Carolina Highways 1)Drawn to a scale of 20, 30, 40, or 50 feet per inch and the scale shall be shown 2)North arrow, vicinity map, date of plan, and date of most-recent revision if applicable 3)Contact information of applicant and engineer, including mailing address, phone number, and email address 4)Show R/W lines, highway control of access, and property lines 5)All existing utilities (including handholes) and easements 6)R/W width 7)Existing posted speed limit(s) and design speed limit(s) 8)Show all property lines, intersections, signals, signal loops, railroads, or crossovers within 500’ in all directions of the property lines of the proposed development 9)Show location of sidewalks, crosswalks, greenways, multi-use paths, curb ramps, railroads, bus stops, and any other relevant transportation facilities in the development area 10)Include a plan sheet showing full site build-out and land use 11)Buildings shown with “gross leasable area” 12)Width of property frontage 13)Distance from R/W to buildings and gasoline service islands 14)Distance from R/W to existing/proposed Edge of Pavement (EOP) (pages 32 & 34) 15)All streams, bridges, retaining walls, signs, or other fixed objects such as trees, utility poles, traffic signals, etc. Section 3: Driveway Plan Requirements | All driveway plans shall include and show, at a minimum, the items listed below 1)Provide comprehensive survey within the existing R/W on both sides of the road for a distance of 500’ in all directions from the development’s property lines. Provide additional hydraulic survey data to the nearest storm water inlet/outlet including ditch lines and storm water pipes, if located outside of the 500' distance. 2)Lane configurations and widths of all existing and proposed driveways, roadways, and adjacent roadways 3)All driveway widths (2-way: 20’ minimum, 36’ maximum | 1-way: 12’ minimum, 24’ maximum | with island: 14'ingress, 18' egress) (pages 50 & 77) 4)Driveway Profile - In shoulder sections, maintain minimum 2% fall from edge of travel way for required shoulder width distance Primary: 8’ minimum | Secondary: 6’ minimum 5)All existing and/or proposed driveway radii (20’ minimum, 50’ maximum, 30’ typical) (pages 34 & 51) In curb and gutter sections, use City of Wilmington flare (SD 3-03.3) - (see attached) In shoulder sections, show grades at the EOP and centerline 6)No curbing is allowed within NCDOT R/W along shoulder sections except as part of a driveway island (page 31) 7)Driveway angles of approach to existing roadway (90° preferred, 75°-90° required for 2-way driveways, 45°-90° allowed for right-in/right-out on a case-by-case basis) (page 51) 8)Driveway Profile (pages 42- 43) Y N n/a Y N n/a □□ □□ □ □ Y N n/a Y N n/a Y N n/a Y N n/a Section 3: Driveway Plan Requirements (continued) 9)Driveway Pavement Cross Section (to be in place from EOP to edge of R/W) Asphalt: 8” ABC stone and 1.5” S9.5B Concrete: 6” of concrete 10)Driveway Offset (driveway EOP to property line; page 75): Minimum: 20’ 11)Corner Clearance (radius point to radius point; page 52)Minimum: 50’ Desirable: 100’ or Municipal std. 12)Minimum 10’x70’ sight triangles at driveways (measured from and along the R/W line) (page 31) 13)Sight Distance (length of sight-distance in both directions shown for each driveway; pages 27-29) 14)Driveways should be aligned with existing opposing driveways or correct offset should be provided (pages 40-41) 15)Distance between driveways being requested (if applicable; page 51) 16)Minimum internal storage areas with specified queues (pages 31-33) 17)Minimum protected driveway stem(s) provided and indicated (pages 33-34) 18)Indicate any gated entrances (100’ minimum setback from R/W required) - traffic queuing study may be required | Section 6: Roadway Plan Requirements If off-site improvements are required, roadway plans shall show, at a minimum, the items below 1)Full width typical sections must be shown (paved shoulders to match the typical section of the adjacent roadway) 2)Minimum Asphalt Typical Section (for turn lanes and/or paved shoulders) Adjacent recently-completed or upcoming TIP projects w/ different typical sections may supersede those below •Primary Routes (US & NC) and Secondary Routes with Annual Average Daily Traffic (AADT) ≥10,000 5.5” B25.0C, 3” I19.0C, 1.5” S9.5C; any overlay of existing pavement is to be a minimum of 1.5” S9.5C •Secondary Routes with AADT<10,000 5.5” B25.0C, 1.5” S9.5B; any overlay of existing pavement is to be a minimum of 1.5” S9.5B 3)Pavement overlay is required if modification of existing pavement markings and/or lanes is necessary The grinding of pavement markings will not be allowed 4)Shoulder Widths (Paved + Unpaved) Primary: 8’ minimum | Secondary: 6’ minimum 5)Ditch Slopes - front and back slopes - minimum 3:1 or flatter 6)Indicate existing roadway grade 7)All taper lengths and deceleration lengths should be appropriately designed for the given design speed (page 78) 8)All turn lanes should be designed according to the Driveway Manual and Roadway Standard Drawings (page 79) See 1205.04 Sheets 1 & 2 and 1205.05 Sheet 1 of the Roadway Standard Drawings for details 9)Pavement marking and signing plans are required - plans must be approved by Division Traffic Services 10)Traffic control plans are required - Detailed phasing plans may be required based on project type and location 11)New and/or revised signal plans must be included for new installations and if signal modifications are required All signal plans must be reviewed and approved by Division Traffic Services and the Signal Design Unit. A Traffic Agreement must be completed to facilitate the review. Contact Division Traffic Services at (910) 341-2200. | Section 4: Drainag e Requirements All drainage features on NCDOT Right-of-Way shall adhere to, at a minimum, the items listed below Section 5: Internal Circ ulation Requirements |All internal circulation details shall adhere to, at a minimum, the items listed below 1)Interior driveway channelization stems Minimum 100’ from the ROW or at the discretion of the District Engineer 2)Traffic flow pattern 3)Traffic control devices 4)Pavement Markings Y N n/a Y N n /a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a 1)Pipe Cover Minimums (measured from top of pipe to subgrade) High Density Polyethylene (HDPE): 24” | Corrugated Aluminum (CAP): 12” | Reinforced Concrete (RCP): 12” 2)Pipe End Treatment (see Roadway Design Manual 5-20, B-2) Pipes ≤24" on multilane highways posted above 45mph require Parallel Pipe End Sections See 310.02 and 310.04 of the Roadway Standard Drawings for details Pipes >30" on multilane highways posted above 45mph require guardrail Pipes ≥36" require an endwall on the inlet end 3)All proposed Drainage is to be provided inside existing R/W. Otherwise, additional R/W or a permanently dedicated drainage easement will be required to accommodate the proposed project drainage 4)All sizes, types, and invert elevations of existing/proposed pipes and drainage structures must be shown(see Sec.3 #1 for survey requirements) 5)Provide spot elevations along frontage of driveway (at EOP and centerline) 6)Provide grades and spot elevations for existing and proposed ditches 7)Show how drainage will be accommodated along property frontage(District Engineer may require applicant to provide drainage calculations when warranted) C/L EOTEOP P/L R/WR/W R/W EOP EOP EOP EOP NTS R/W P/L DRAINAGE FLOW DRAINAGE FLOW DRAINAGE FLOW SHOULDER WIDTH SHOULDER WIDTH SHOULDER WIDTH SHOULDER WIDTH S IGHT T R IANGLE 10 ' BY 70 'S I GHT T R I AN G L E10' B Y 70' DRIVEWAY RR MIN. 30'MIN. 30' NO ROADWAY IMPROVEMENT COMMERCIAL DRIVEWAY WITH NORMAL CROWN ROADWAY 6" LOWER THAN THE EDGE OF PAVEMENTMIN 2% FALL AWAY or 20' AWAY FROM THE PROPERTY LINEDRIVEWAY SHALL BE LOCATED AT LEAST PIPE/TYPE/SIZE WIDTH CON CR ET E /ASP HA LT LOCAL NAME ROAD POSTED SPEED ( ) MPH WIDTH WIDTHSR NUMBER SITE ADDRESS:TAX PARCEL # 20191115 PARALLEL END S.D. 310.02 INVERT ELEVATION PARALLEL END S.D. 310.02 INVERT ELEVATION 20' AWAY FROM THE PROPERTY LINEDRIVEWAY SHALL BE LOCATED AT LEAST OR 500' OF XYZ SURVEY DATA PAST THE PROPERT LINENEAREST OUTFALL ELEVATION OR 500' OF XYZ SURVEY DATA PAST THE PROPERT LINENEAREST OUTFALL ELEVATION MEMORANDUM To: New Hanover County Technical Review Committee Date: January 23, 2026 Subject: 3303 N Kerr Flex Space Comments: • Please confirm that the appropriate ITE land use code has been used below to ensure accurate trip generation estimates. NCDOT Projects: • N/A WMPO 2050 MTP Projects: • N/A New Hanover County Projects: • N/A TIA: Based on the 11th edition ITE Trip Generation Manual, a TIA is not required. Land Use (ITE Code) Intensity Unit 24 Hour Volumes AM Peak Hour Trips PM Peak Hour Trips General Office (710) Combined 19,650 SF 282 41 43 General Office (710) Proposed 8,750 SF 139 21 22 NKIP Gym – 3036 Hall Watters Drive – TRC Review Page | 1 To: Robert W. Broadfoot, Owner/Applicant From: Ryan Beil, Development Review Planner Date: February 4, 2026 Technical Review Committee (TRC) PID#: R02600-003-076-000 Egov# SITECN-26-000003 Subject: 3036 Hall Watters Drive – NKIP Gym- TRC Review Technical Review Committee (TRC) General Information The TRC is a staff-level group of local government officials that reviews projects for compliance with the local regulations administered by each respective review agency. Voluntarily participating state agencies may also provide comments. And general information and non-binding recommendations about the site may also be provided by government agencies. The TRC meetings are considered staff meetings and are not public hearings. The TRC meeting is an opportunity for applicants to speak with county staff and any voluntarily participating state or federal agencies about the review comments they have been provided. No voting is involved in the TRC process, and no final approvals or denials are made at the TRC meetings. Following the TRC meeting, applicants are responsible for updating their plans to address review comments. Those revised plans need to be resubmitted to the assigned case planner. The case planner will facilitate additional reviews until all comments have been addressed, and the necessary departments have stated the plans comply with the applicable minimum requirements for development. Following any future TRC approval, the project is required to obtain additional permits to include a zoning compliance permit for the site. Applicants are also responsible for coordinating with state and federal agencies for compliance with any additional requirements. Any activity on the property that is not approved as part of the TRC review and zoning compliance permit will be considered a violation of the UDO and subject to enforcement action under Article 12 Violations and Enforcement. The following comments have been received for the February 4, 2026, TRC meeting. Additional comments may be made upon further review of subsequent revisions. NKIP Gym – 3036 Hall Watters Drive – TRC Review Page | 2 Planning, Your Name 910-798-7444 Compliance with local zoning requirements 1. General Comments a. The property is zoned PD. b. As stated in the application the intended use is Indoor Recreation Establishment (Gymnasium). The Unified Development Ordinance (UDO) defines the use as i. A commercial establishment that provides indoor facilities for recreation, entertainment (except adult entertainment), or amusement, including but not limited to: bowling alleys, pool rooms, indoor sports gymnasiums, movie theaters and live theaters, indoor skating rinks, video arcades, and indoor shooting ranges. ii. Please list all incidental or customary activities that may occur on the property in line with and under the general definition of the requested use. c. The Planning and Land Use Department’s review of the site is for compliance with the UDO and use specific requirements of the specified land use. Any other activity that might occur on the property beyond the definition above should be noted on the application and site plan for additional review and comment. d. This property is a part of the Blue Clay Farms Planned Development, and the conditions listed in that case were as follows: i. Align N. Kerr Avenue entrance with Trusdale Road prior to final plan approval. ii. MPO and NCDOT review and approval of the Traffic Impact Analysis and the Traffic Circulation Plan prior to approval of the final plan. iii. Provide Homeowner Association documents for review and approval along with submission of the final plan. iv. All required information relating to drainage and stormwater management must be submitted for review in conjunction with the final plan. v. Detailed street system and infrastructure location must be submitted for review in conjunction with the final plan. e. Please include the conditions on the plans. 2. UDO Section 5.1, Parking and Loading NKIP Gym – 3036 Hall Watters Drive – TRC Review Page | 3 a. Use requires 4 parking spots for every 1,000 square feet of building area. Project proposes 15,120 square feet. Required parking is 15,120 / 1,000 = 15.12 x 4 = 60 required parking spaces. 62 parking spaces proposed. 3. UDO Section 5.2, Traffic, Access and Connectivity a. Please note that no building permit for any structure shall be issued which requires NCDOT approval for a Driveway Permit until NCDOT has issued the permit approval. Evidence of approval shall accompany the application for building permit. 4. UDO Section 5.3, Tree Retention a. Note: Land disturbance permits can be issued by county Engineering before a Tree Removal Permit is approved by Planning. However, any trees removed before the Tree Removal Permit is issued may result in enforcement action under Section 5.3.2 of the Unified Development Ordinance to include prohibiting any development of the site for 3 to 5 years. 5. UDO Section 5.4, Landscaping and Buffering a. Street yard landscaping shall be required along street frontages. b. B-2 primary street yard requires 25 square feet for each linear foot of street frontage, with a minimum width of 12.5’. While Hall Watters Drive does not extend presently, considering it is marked as Future Public Right of Way on the plat, trees along that frontage must be preserved and be prepared to install street yard in the future if that road does get build out. i. Appears to be roughly 340 linear feet along Hall Watters Road. 25’ x 340’ = roughly 8,500 square feet of street yard landscaping that will be required if the road is built out. ii. For every 600 square feet, 1 canopy tree or three understory trees are required, along with 6 shrubs. c. Parking lot landscaping required equaling 8% of the total vehicular use area. i. One tree per 144 square feet. ii. At least 75% of trees shall be shade/canopy species iii. No parking space shall be located more than 120 feet from a landscape island. d. Foundation plantings located between the building face and the parking lot or drive aisle shall be required for all portions of buildings adjacent to parking lots or internal drive aisles. i. The foundation planting area shall be 12% of the area of the first floor building face, or building face up to 25 feet in height, whichever is less, adjacent to the parking area or internal drive; and NKIP Gym – 3036 Hall Watters Drive – TRC Review Page | 4 ii. The foundation planted area shall be planted as landscaped areas of sufficient variety, height, and size with plantings listed in New Hanover County Tree and Landscaping Manual. 6. UDO Section 5.5, Lighting a. Please note that a lighting plan is not required for TRC approval but will be required prior to issuance of construction plan approvals. b. Is any lighting proposed for the site? 7. UDO Section 5.6, Signs a. There does not appear to be a freestanding sign shown on the plan. If the sign is along a DOT maintained road or near an intersection with a DOT road (including the driveway access). The required DOT sight triangles must be shown on the plan and the sign location must be outside the sight triangles. b. For any signs on the site, a separate sign permit must be submitted and reviewed by the county for compliance with Section 5.6 of the UDO for standards at or after the submittal of the separate zoning compliance and construction permits for the primary building or use. 8. UDO Section 5.7, Conservation Resources a. Per the New Hanover County Conservation Resource map there are no Conservation Resources located on site. 9. UDO Article 9, Flood Damage Prevention a. Per the New Hanover County Flood Map, no part of the property is in the floodplain. NHC Fire Services, Ray Griswold 910-798-7448 Compliance with NC Fire Code 1. Fire finals required 2. Will this building be sprinklered??? 3. Will this facility have a fire alarm?? 4. A Section 510 study will have to be completed - Emergency First Responder Coverage 5. KNX Box(s) may be required 6. No parking will be allowed in / along the existing drive way. 7. There is a new gate that was installed by the neighboring building. How will that impact your project. 8. If Hall Watters is extended you may want to add an additional entrance at the back gravel area. NKIP Gym – 3036 Hall Watters Drive – TRC Review Page | 5 NHC Soil & Water Conservation, Dru Harrison 910-798-7135 General comments about existing soil conditions of the site. 1. No comments NHC Engineering, Galen Jamison 910-798-7072 Stormwater management and land disturbance 1. A revision to STMW -20-0013 will be required. Please digitally submit the permit applications documentation revisions with requisite review fees using STMW-20-0013 to the COAST online permit portal (https://newhanovercountync- energovpub.tylerhost.net/apps/selfservice#/home. 2. A land disturbing permit issued by the County is required for this project. Please digitally submit the permit applications documentation with requisite review fees to the COAST online permit portal (https://newhanovercountync- energovpub.tylerhost.net/apps/selfservice#/home). Applicable forms can be found at https://www.nhcgov.com/249/Sediment-Erosion-Control. 3. Please contact the State for their stormwater permit requirements. It is anticipated a offsite permit and minor modification to SW8 960411 will be required. NHC Environmental Health, Dustin Fenske 910-798-6732 Septic tanks and wells 1. Site plan reflects connection to public water and sewer. All surrounding properties are on public water and sewer. NHC Addressing, McCabe Watson 910-798-7068 Street naming and property address 1. No comments, existing address is acceptable. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 Public water and sewer 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan Review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. 3. CFPUA water available. End of line manhole location will require field and permit verification. A mainline extension and/or permitting may be required. 4. CFPUA Meter Sizing Form will be required. NKIP Gym – 3036 Hall Watters Drive – TRC Review Page | 6 5. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains). 6. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. 7. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. NCDOT, Nick Drees 910-398-9114 Driveway access and state road improvements 1. Comments attached WMPO, Luke Hutson 910-343-3915 New Hanover County contracted traffic engineering services comments: 1. Comments attached Army Corps of Engineers, Brad Shaver 910-251-4611 Requirements if wetlands are impacted 1. No comments Project information also provided to the following state agencies and non-regulatory local agencies for their awareness: New Hanover County Emergency Management New Hanover County Schools New Hanover County Sustainability Manager NC Department of Environmental Quality (DEQ) NC DEQ Division of Coastal Management NC DEQ Division of Energy, Mineral, and Land Resources STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JOSH STEIN DANIEL H. JOHNSON GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Memorandum DATE: January 26, 2026 TO: New Hanover County Technical Review Committee SUBJECT: Gymnasium – 3036 Hall Waters Drive ________________________________________________________________________ These are preliminary comments and are based on the plans as submitted for the proposed site. They are subject to further review upon receipt of any additional information. Subsequently, additional comments and/or requirements may be necessary for this site. General Comments: NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx This road is public but has not been accepted by NCDOT. For it to be eligible to be taken over in the future, any work within the right of way will need to be completed per NCDOT standards. You can coordinate with the District Office with any questions 910-398-9100. NCDOT Driveway Permit: An NCDOT Driveway permit is not required as this is not on a current state-maintained road. NCDOT Encroachment Agreement: An NCDOT Encroachment Agreement is not required as this is not on a current state- maintained road. Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Site Plan Comments: Driveway Plan Requirements: • The driveway must be designed and built to meet NCDOT requirements for Hall Watters Drive and Pennington Road to be added to the state system in the future. Drainage/Stormwater Conveyance: • If the drainage does not naturally flow to the NCDOT right of way the historic drainage pattern should be maintained. Sight Triangles and Sight Distance: • Show and label the 10’ X 70’ NCDOT sight triangles. o No obstructions shall be placed within the NCDOT sight triangles. • Show and label the stopping sight distance. o No obstructions shall be placed within the stopping sight distance. Identification Signing and Landscaping: • Identification signing or landscape vegetation within the median and the sight distance triangle must not obstruct the driver’s line of sight. No landscaping or signing will be allowed to exceed 42 inches in height, measured from the Edge of Pavement (EOP) within the median or sight triangle. • All pylon signs in the median or sight distance triangle must provide a vertical clear sight zone between 3 feet-6 inches and 10 feet-0 inches measured from the EOP. Signing located within a clear recovery area shall be of a “breakaway design.” • Only low growing shrubbery, consistent with the NCDOT’s landscaping policies, as contained in the publication “Guidelines for Planting Within Highway Right of Way,” will be allowed within a landscaped median and the sight distance triangle at the entranceway to a development, whether the street or driveway connection to the State Highway System is designated as a public facility or not. Landscaping within the right-of-way and sight distance triangles may require additional approval by the District Engineer. Gated Entrances: • Show and label any proposed gates with distances to the right of way line. NCDOT | Division 3 | District 3 Project Name:_____________________________ Date:_______________ Applicant Checklist NCDOT Checklist Driveway Application Process and Site Plan Requirements ALL APPLICATIONS SHALL BE ACCOMPANIED BY COMPLETE AND DETAILED SITE PLANS THAT ADHERE TO THE POLICIES LISTED IN THE POLICY ON STREET AND DRIVEWAY ACCESS TO NORTH CAROLINA HIGHWAYS AND THIS DOCUMENT. FAILURE TO ADHERE TO THESE POLICIES WILL RESULT IN THE RETURN OF THE APPLICATION TO THE APPLICANT FOR REVISION. ***THE NCDOT WILL NOT BEGIN THE REVIEW PROCESS ON INCOMPLETE APPLICATIONS*** Electronic Pre-Submittals In an effort to save time and resources, we are happy to provide an initial assessment of a driveway permit submittal’s plans via email to identify any major issues up front. This initial assessment can be followed up with a submittal of one digital copy of the plans along with all other required documents. All Permit applications shall be submitted through the online portal https://connect.ncdot.gov/site/Permits/Pages/default.aspx In the notify email section of the portal application please include the District Office email (Div3Dist3@ncdot.gov). See the last pages for further instruction. Online resources: •NCDOT Policy on Street and Driveway Access to North Carolina Highways: https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Policy%20on%20Street%20an d%20Driveway%20Access.pdf •NCDOT Policies and Procedures for Accommodating Utilities on Highway Rights of Way: https://connect.ncdot.gov/municipalities/Utilities/Pages/UtilitiesManuals.aspx •Electronic Forms Database: https://connect.ncdot.gov/Pages/default.aspx 1) a.Cover Letter Include contact information for applicant and engineer, including email address, mailing address, and phone number. Include the parcel number(s), description of all phases of the development and future land uses to be served by the permit, and a description of the adjoining land owned or controlled by the applicant. b.NCDOT Street and Driveway Access Permit Application (form downloadable via link below) https://connect.ncdot.gov/resources/BusinessForms/TEB-65-04.doc c.$50.00 Inspection Fee Per Access Point Attach to Permit Application form (not applicable for municipalities, churches, and schools) d.NPDES Stormwater Permit Compliance Certification (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/NPDESstatement.doc e.Verification of Compliance with Environmental Regulations (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/VCER-1.pdf f.Site Plans (to include the “Master Plan” of a tract even if only a small portion is being developed first) Additional site plan requirement details can be found in section 2 of this document. g.Design Plan Requirements for projects involving roadway improvements If roadway improvements are required as part of the permit, then roadway plans, pavement marking plans,signing plans, and traffic control plans will be required - See Section 6 for more information Y N n/a Engineering Studies The applicant may be required by the District Engineer to submit studies based on, but not limited to, the parameters outlined herein. If study requirements of the local government agency are more restrictive than the NCDOT requirements, then local government requirements will govern. However, this does not imply that the NCDOT is obligated to approve entrance designs that are too constrictive to allow smooth and safe traffic flow. All studies including, but not limited to, Traffic Impact Analyses (TIA), traffic signal studies, and drainage studies, must be prepared under the direct charge of and sealed by a North Carolina licensed Professional Engineer. Section 1: Requi red Documents |Required documents to accompany all Initial Driveway Application Submittals Please note that these are the minimum requirements of all driveway permit applications. All required documentation shall be submitted through the online portal as PDF files, with the exception of the Performance and Indemnity Bond and the $50 Inspection Fee(s), these should be mailed or delivered to 5501 Barbados Blvd, Castle Hayne, NC 28429. If a Traffic Impact Analysis and/or roadway improvements are deemed necessary as a condition of the permit, there may be additional submittal materials required. State of North Carolina | Department of Transportation | Division 3 | District 3 5501 Barbados Blvd, Castle Hayne, NC 28429 Form Updated 10/15/2021 (910) 398-9100 T NCDOT Permit #___________________ Y N n/a Section 1: Required Documents (continued) 2)Required documents to accompany all Driveway Applications PRIOR TO FINAL APPROVAL a.Site Plans One (1) digital copy (PDF) unless otherwise requested by the District Office. Additional site plan requirement details can be found in section 2 of this document. b.Performance and Indemnity Bond Information/Forms See last page of document for bond information and forms c.Performance and Indemnity Bond Amount 100% of the cost of the work within NCDOT Right-of-Way (R/W) based on the attached estimate determined by the applicant's engineer and approved by the District Engineer. Bond hold letter required for for municipalities, churches, and schools. See pages 101-105 in the Policies and Procedures for Accommodating Utilities on Highway Rights of Way for acceptable bond types d.Radius Encroachment Letter (if applicable) If driveway radius encroaches on the frontage of an adjacent property, a Radius Encroachment will be required e.Hold Harmless Letter (if applicable) If the Permit is within the limits of an active NCDOT project, a Hold Harmless letter from the NCDOT contractor will be required. If the project is in preconstruction, coordinate with the Department's Project Development Unit Section 2: General Site Plan Requirements | All site plans shall include and show, at a minimum, the items listed below Page numbers reference the NCDOT Policy on Street and Driveway Access to North Carolina Highways 1)Drawn to a scale of 20, 30, 40, or 50 feet per inch and the scale shall be shown 2)North arrow, vicinity map, date of plan, and date of most-recent revision if applicable 3)Contact information of applicant and engineer, including mailing address, phone number, and email address 4)Show R/W lines, highway control of access, and property lines 5)All existing utilities (including handholes) and easements 6)R/W width 7)Existing posted speed limit(s) and design speed limit(s) 8)Show all property lines, intersections, signals, signal loops, railroads, or crossovers within 500’ in all directions of the property lines of the proposed development 9)Show location of sidewalks, crosswalks, greenways, multi-use paths, curb ramps, railroads, bus stops, and any other relevant transportation facilities in the development area 10)Include a plan sheet showing full site build-out and land use 11)Buildings shown with “gross leasable area” 12)Width of property frontage 13)Distance from R/W to buildings and gasoline service islands 14)Distance from R/W to existing/proposed Edge of Pavement (EOP) (pages 32 & 34) 15)All streams, bridges, retaining walls, signs, or other fixed objects such as trees, utility poles, traffic signals, etc. Section 3: Driveway Plan Requirements | All driveway plans shall include and show, at a minimum, the items listed below 1)Provide comprehensive survey within the existing R/W on both sides of the road for a distance of 500’ in all directions from the development’s property lines. Provide additional hydraulic survey data to the nearest storm water inlet/outlet including ditch lines and storm water pipes, if located outside of the 500' distance. 2)Lane configurations and widths of all existing and proposed driveways, roadways, and adjacent roadways 3)All driveway widths (2-way: 20’ minimum, 36’ maximum | 1-way: 12’ minimum, 24’ maximum | with island: 14'ingress, 18' egress) (pages 50 & 77) 4)Driveway Profile - In shoulder sections, maintain minimum 2% fall from edge of travel way for required shoulder width distance Primary: 8’ minimum | Secondary: 6’ minimum 5)All existing and/or proposed driveway radii (20’ minimum, 50’ maximum, 30’ typical) (pages 34 & 51) In curb and gutter sections, use City of Wilmington flare (SD 3-03.3) - (see attached) In shoulder sections, show grades at the EOP and centerline 6)No curbing is allowed within NCDOT R/W along shoulder sections except as part of a driveway island (page 31) 7)Driveway angles of approach to existing roadway (90° preferred, 75°-90° required for 2-way driveways, 45°-90° allowed for right-in/right-out on a case-by-case basis) (page 51) 8)Driveway Profile (pages 42- 43) Y N n/a Y N n/a □□ □□ □ □ Y N n/a Y N n/a Y N n/a Y N n/a Section 3: Driveway Plan Requirements (continued) 9)Driveway Pavement Cross Section (to be in place from EOP to edge of R/W) Asphalt: 8” ABC stone and 1.5” S9.5B Concrete: 6” of concrete 10)Driveway Offset (driveway EOP to property line; page 75): Minimum: 20’ 11)Corner Clearance (radius point to radius point; page 52)Minimum: 50’ Desirable: 100’ or Municipal std. 12)Minimum 10’x70’ sight triangles at driveways (measured from and along the R/W line) (page 31) 13)Sight Distance (length of sight-distance in both directions shown for each driveway; pages 27-29) 14)Driveways should be aligned with existing opposing driveways or correct offset should be provided (pages 40-41) 15)Distance between driveways being requested (if applicable; page 51) 16)Minimum internal storage areas with specified queues (pages 31-33) 17)Minimum protected driveway stem(s) provided and indicated (pages 33-34) 18)Indicate any gated entrances (100’ minimum setback from R/W required) - traffic queuing study may be required | Section 6: Roadway Plan Requirements If off-site improvements are required, roadway plans shall show, at a minimum, the items below 1)Full width typical sections must be shown (paved shoulders to match the typical section of the adjacent roadway) 2)Minimum Asphalt Typical Section (for turn lanes and/or paved shoulders) Adjacent recently-completed or upcoming TIP projects w/ different typical sections may supersede those below •Primary Routes (US & NC) and Secondary Routes with Annual Average Daily Traffic (AADT) ≥10,000 5.5” B25.0C, 3” I19.0C, 1.5” S9.5C; any overlay of existing pavement is to be a minimum of 1.5” S9.5C •Secondary Routes with AADT<10,000 5.5” B25.0C, 1.5” S9.5B; any overlay of existing pavement is to be a minimum of 1.5” S9.5B 3)Pavement overlay is required if modification of existing pavement markings and/or lanes is necessary The grinding of pavement markings will not be allowed 4)Shoulder Widths (Paved + Unpaved) Primary: 8’ minimum | Secondary: 6’ minimum 5)Ditch Slopes - front and back slopes - minimum 3:1 or flatter 6)Indicate existing roadway grade 7)All taper lengths and deceleration lengths should be appropriately designed for the given design speed (page 78) 8)All turn lanes should be designed according to the Driveway Manual and Roadway Standard Drawings (page 79) See 1205.04 Sheets 1 & 2 and 1205.05 Sheet 1 of the Roadway Standard Drawings for details 9)Pavement marking and signing plans are required - plans must be approved by Division Traffic Services 10)Traffic control plans are required - Detailed phasing plans may be required based on project type and location 11)New and/or revised signal plans must be included for new installations and if signal modifications are required All signal plans must be reviewed and approved by Division Traffic Services and the Signal Design Unit. A Traffic Agreement must be completed to facilitate the review. Contact Division Traffic Services at (910) 341-2200. | Section 4: Drainag e Requirements All drainage features on NCDOT Right-of-Way shall adhere to, at a minimum, the items listed below Section 5: Internal Circ ulation Requirements |All internal circulation details shall adhere to, at a minimum, the items listed below 1)Interior driveway channelization stems Minimum 100’ from the ROW or at the discretion of the District Engineer 2)Traffic flow pattern 3)Traffic control devices 4)Pavement Markings Y N n/a Y N n /a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a 1)Pipe Cover Minimums (measured from top of pipe to subgrade) High Density Polyethylene (HDPE): 24” | Corrugated Aluminum (CAP): 12” | Reinforced Concrete (RCP): 12” 2)Pipe End Treatment (see Roadway Design Manual 5-20, B-2) Pipes ≤24" on multilane highways posted above 45mph require Parallel Pipe End Sections See 310.02 and 310.04 of the Roadway Standard Drawings for details Pipes >30" on multilane highways posted above 45mph require guardrail Pipes ≥36" require an endwall on the inlet end 3)All proposed Drainage is to be provided inside existing R/W. Otherwise, additional R/W or a permanently dedicated drainage easement will be required to accommodate the proposed project drainage 4)All sizes, types, and invert elevations of existing/proposed pipes and drainage structures must be shown(see Sec.3 #1 for survey requirements) 5)Provide spot elevations along frontage of driveway (at EOP and centerline) 6)Provide grades and spot elevations for existing and proposed ditches 7)Show how drainage will be accommodated along property frontage(District Engineer may require applicant to provide drainage calculations when warranted) C/L EOTEOP P/L R/WR/W R/W EOP EOP EOP EOP NTS R/W P/L DRAINAGE FLOW DRAINAGE FLOW DRAINAGE FLOW SHOULDER WIDTH SHOULDER WIDTH SHOULDER WIDTH SHOULDER WIDTH S IGHT T R IANGLE 10 ' BY 70 'S I GHT T R I AN G L E10' B Y 70' DRIVEWAY RR MIN. 30'MIN. 30' NO ROADWAY IMPROVEMENT COMMERCIAL DRIVEWAY WITH NORMAL CROWN ROADWAY 6" LOWER THAN THE EDGE OF PAVEMENTMIN 2% FALL AWAY or 20' AWAY FROM THE PROPERTY LINEDRIVEWAY SHALL BE LOCATED AT LEAST PIPE/TYPE/SIZE WIDTH CON CR ET E /ASP HA LT LOCAL NAME ROAD POSTED SPEED ( ) MPH WIDTH WIDTHSR NUMBER SITE ADDRESS:TAX PARCEL # 20191115 PARALLEL END S.D. 310.02 INVERT ELEVATION PARALLEL END S.D. 310.02 INVERT ELEVATION 20' AWAY FROM THE PROPERTY LINEDRIVEWAY SHALL BE LOCATED AT LEAST OR 500' OF XYZ SURVEY DATA PAST THE PROPERT LINENEAREST OUTFALL ELEVATION OR 500' OF XYZ SURVEY DATA PAST THE PROPERT LINENEAREST OUTFALL ELEVATION /271257+.(55,1'8675,$/3$5. +$//:$77(56'5,9( :,/0,1*7211& '(&(0%(5       /LFHQFH3         -2 +1678167$//     (1*,1((5 ,521*$7('568,7( :,/0,1*7211&3+21(   7XQVWDOO&RQVXOWLQJ(QJLQHHUV3//&                            , 5 2 1  * $ 7 (  ' 5    6 8 , 7 (     :,/ 0 , 1 * 7 2 1   1 &        3+ 2 1 (              7X Q V W D O O  & R Q V X O W L Q J  ( Q J L Q H H U V  3 / / &         - 2+167816 7 $//    (1*,1((5   /LFHQVH3                                                                                                                                                   , 5 2 1  * $ 7 (  ' 5    6 8 , 7 (     :,/ 0 , 1 * 7 2 1   1 &        3+ 2 1 (              7X Q V W D O O  & R Q V X O W L Q J  ( Q J L Q H H U V  3 / / & /(*(1'       , 5 2 1  * $ 7 (  ' 5    6 8 , 7 (     :,/ 0 , 1 * 7 2 1   1 &        3+ 2 1 (              7X Q V W D O O  & R Q V X O W L Q J  ( Q J L Q H H U V  3 / / &         - 2+167816 7 $//    (1*,1((5   /LFHQVH3                                                                                                                                               , 5 2 1  * $ 7 (  ' 5    6 8 , 7 (     :,/ 0 , 1 * 7 2 1   1 &        3+ 2 1 (              7X Q V W D O O  & R Q V X O W L Q J  ( Q J L Q H H U V  3 / / &                 MEMORANDUM To: City of Wilmington Technical Review Committee Date: January 23, 2026 Subject: 3036 Hall Water Drive Gym NCDOT Projects: • N/A WMPO 2050 MTP Projects: • N/A New Hanover County Projects: • N/A TIA: Please confirm that the correct land use code is used below to ensure accurate trip generation numbers for the proposed site. Land Use (ITE Code) Intensity Unit 24 Hour Volumes AM Peak Hour Trips PM Peak Hour Trips Recreational Com. Center (495) 15,120 SF 436 29 38