Truck Parking Expansion – 6601 Windmill Way – TRC Review
Page | 1
To: Branch Smith, PE
From: Amy Doss, Development Planner
Date: March 18, 2026 Technical Review Committee (TRC)
PID#: R04319-004-006-000
Egov# SITECN-26-000010
Subject: 6601 Windmill Way – Truck Parking Expansion - TRC Review
Technical Review Committee (TRC) General Information
The TRC is a staff-level group of local government officials that reviews projects for compliance with
the local regulations administered by each respective review agency. Voluntarily participating state
agencies may also provide comments. And general information and non-binding recommendations
about the site may also be provided by government agencies.
The TRC meetings are considered staff meetings and are not public hearings. The TRC meeting is an
opportunity for applicants to speak with county staff and any voluntarily participating state or federal
agencies about the review comments they have been provided.
No voting is involved in the TRC process, and no final approvals or denials are made at the TRC
meetings. Following the TRC meeting, applicants are responsible for updating their plans to address
review comments. Those revised plans need to be resubmitted to the assigned case planner. The case
planner will facilitate additional reviews until all comments have been addressed, and the necessary
departments have stated the plans comply with the applicable minimum requirements for
development.
Following any future TRC approval, the project is required to obtain additional permits to include a
zoning compliance permit for the site. Applicants are also responsible for coordinating with state and
federal agencies for compliance with any additional requirements. Any activity on the property that is
not approved as part of the TRC review and zoning compliance permit will be considered a violation
of the UDO and subject to enforcement action under Article 12 Violations and Enforcement.
The following comments have been received for the March 18, 2026, TRC meeting. Additional
comments may be made upon further review of subsequent revisions.
Truck Parking Expansion – 6601 Windmill Way – TRC Review
Page | 2
Planning, Amy Doss 910-798-7571
Compliance with local UDO requirements
1. General Comments
a. Zoning is I-2, Industrial.
b. As stated in the application the intended use is expansion of an existing Utility
Structure.
i. The Unified Development Ordinance (UDO) defines the use as: Lines, facilities,
or structures engaged in the treatment, transmission, and/or distribution of
electricity, gas, steam, water, sewer, cable, or other utility not otherwise
specified by this ordinance.
c. The Planning and Land Use Department’s review of the site is for compliance with the
UDO and use specific requirements of the specified land use. Any other activity that
might occur on the property beyond the definition above should be noted on the
application and site plan for additional review and comment.
2. UDO Section 5.1, Parking and Loading
a. No additional parking required. Request is for additional parking and loading area.
3. UDO Section 5.2, Traffic, Access and Connectivity
a. Please note that no building permit for any structure shall be issued which requires
NCDOT approval for a Driveway Permit until NCDOT has issued the permit approval.
Evidence of approval shall accompany the application for building permit.
b. No TIA required.
4. UDO Section 5.3, Tree Retention
a. Will any trees be removed?
b. Note: Land disturbance permits can be issued by county Engineering before a Tree
Removal Permit is approved by Planning. However, any trees removed before the Tree
Removal Permit is issued may result in enforcement action under Section 5.3.2 of the
Unified Development Ordinance to include prohibiting any development of the site for
3 to 5 years.
5. UDO Section 5.4, Landscaping and Buffering
Truck Parking Expansion – 6601 Windmill Way – TRC Review
Page | 3
a. Please refer to section 5.4.5.C of the UDO for parking lot interior requirements and
standards. Landscaping shall be a minimum of 8% of the total area (approximately
3,000 SF). Please show your calculation.
b. All planting materials must comply with the approved planting materials listed in the
New Hanover County Tree & Landscaping Manual. The species and size must be listed
in the final landscape plan indicating compliance with the manual. Or evidence the
proposed plant species are acceptable from the county Agricultural Extension office.
6. UDO Section 5.5, Lighting
a. Please note that a lighting plan is not required for TRC approval but will be required
prior to issuance of construction plan approvals.
b. Is any lighting proposed for the site?
7. UDO Section 5.6, Signs
a. Are any signs are planned? If signs will be added, the plans need to show the location,
but not the size.
b. For any signs on the site, a separate sign permit must be submitted and reviewed by
the county for compliance with Section 5.6 of the UDO for standards at or after the
submittal of the separate zoning compliance and construction permits for the primary
building or use. Any approvals granted by the TRC for the site design is not an approval
for the ultimate size or placement of the sign.
8. UDO Section 5.7, Conservation Resources
a. No conservation resources on site.
9. UDO Article 9, Flood Damage Prevention
a. Property is not in the floodplain.
NHC Fire Services, David Stone 910-798-7458
Compliance with NC Fire Code
1. No Fire Service Comments for this project.
NHC Engineering, Galen Jamison 910-798-7072
Stormwater management and land disturbance
Truck Parking Expansion – 6601 Windmill Way – TRC Review
Page | 4
1. There appears no increase in impervious surface or proposed conveyance measures. If so,
there is no requirement for a county issued stormwater report.
2. It appears the limits of disturbance is less than 1 acre and the original common plan of
development is greater than 7 years. If so, there is no requirements for a land disturbing
permit, but appropriate measures as indicated on the site plan shall be provided. The
building permit application will need to include the final designed site plan.
NHC Environmental Health, Dustin Fenske 910-798-6732
Septic tanks and wells
1. It appears site is connected up to public water and sewer. Environmental Health cannot find
any recent records for septic at 6601 Watermill Way.
NHC Addressing, McCabe Watson 910-798-7068
Street naming and property address
1. No comments.
Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620
Public water and sewer
1. CFPUA TRC Comments provided are preliminary comments only.
2. Utility Plan Review required by CFPUA. CFPUA is moving toward becoming paperless. When
ready to submit plan review package, upload all documents to
https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103.
3. CFPUA water and sewer available.
4. Meter Sizing form will be required to determine if CFPUA Plan Review is required.
5. New building permits may require connection to CFPUA sewer.
6. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains).
7. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE
Application Form and a Preliminary Plan, this determination does not guarantee capacity.
8. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the
plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the
Authority
Truck Parking Expansion – 6601 Windmill Way – TRC Review
Page | 5
NCDOT, Nick Drees 910-343-3915
Driveway access and state road improvements
1. No permit is required for the proposed truck bay parking.
WMPO, Luke Hutson 910-343-3915
New Hanover County contracted traffic engineering services comments:
1. Comments attached.
Army Corps of Engineers, Brad Shaver 910-251-4611
Information or Requirements if wetlands are impacted
1. No comment.
Project information also provided to the following state agencies and non-regulatory local
agencies for their awareness:
New Hanover County Emergency Management
New Hanover County Schools
NC Department of Environmental Quality (DEQ)
NC DEQ Division of Coastal Management
NC DEQ Division of Energy, Mineral, and Land Resources
NHC Sustainability Manager, Madelyn Wampler 910-798-7175
NHC Soil & Water Conservation
MEMORANDUM
To: New Hanover County Technical Review Committee
Date: February 26, 2026
Subject: 6601 Windmill Avenue – Truck Bay
NCDOT Projects:
• N/A
WMPO 2050 MTP Projects:
• N/A
New Hanover County Projects:
• N/A
TIA: Based on the 11th edition ITE Trip Generation Manual, a TIA is not required.
Land Use (ITE Code) Intensity Unit 24 Hour
Volumes
AM Peak
Hour Trips
PM Peak
Hour Trips
Utility (170) 74,937 SF 289 53 56