HomeMy WebLinkAboutzd_TRC_Comment_responses_1_55_lots_____________________________________________________________________________________________________________________________________
3805 Cherry Avenue - Wilmington, NC 28403 - 910 791 4441 - www.csd-engineering.com – License # C-2710
March 20, 2026
Zach Dickerson, Current Planner
New Hanover County
Planning and Land Use
230 Government Center Dr. Suite 110
Wilmington, NC 28403
Re: Alton Orchard
Formal TRC Comment Responses
New Hanover County
CSD Project No. 25-0734
Dear Zach:
We have addressed the comments from the Formal March 18, 2026 TRC review. Comments and responses are below.
Enclosed please find the following items for the referenced project:
- .pdf of the TRC Drawings
Please let us know if you have any questions or require any additional information.
Sincerely,
Rodney Wright
Rodney Wright
CC: River Road Construction, LLC
Alton Orchard Formal TRC Comment Responses | 2
______________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________
3805 Cherry Avenue - Wilmington, NC 28403 - 910 791 4441 - www.csd-engineering.com – License # C-2710
Planning:
Comment: Zoning district – R-15
Response: Acknowledged.
Comment: Housing type: Single family residential – detached with 55 dwelling units
Response: Acknowledged.
Comment: Density for Performance Residential: R-15 allows a maximum density of 2.5 dwelling units per acre
under performance residential. 22.02 acres x 2.5 = 55
Response: Acknowledged.
Comment: Site plan stated that no traffic calming devices are propose
Response: Acknowledged.
Comment: Perimeter setback of 20 Ft is shown and correct.
Response: Acknowledged.
Comment: Where is the mailbox kiosk planned to be located.
Response: It will be located inside the Amenity building.
Comment: Single Family homes are required to have two parking spaces. Please confirm this will be provided.
Response: Acknowledged, homes will be setback far enough so a two car driveway can be installed.
Comment: The right of way width is correct at 45’, however travel way must be 24’ minimum. Please confirm the
width of the road.
Response: Travel way is 24 ft of asphalt then 2 ft modified valley curbing.
Comment: Please note that no building permit for any structure shall be issued which requires NCDOT approval for
a Driveway Permit until NCDOT has issued the permit approval. Evidence of approval shall accompany
the application for building permit
Response: DOT driveway is under review.
Comment: The site has a previously issued Tree Permit, TR-25-000090
Response: Acknowledged.
Comment: The Tree removal permit required 187 inches of mitigation. This will need to be addressed through a
mitigation plan prior to TRC approval
Response: Acknowledged, will work on a mitigation plan.
Comment: Land Disturbance can be issued by county Engineering before a Tree Removal permit is approved by
Planning However, any trees removed before the Tree Permit is issued may result in enforcement
action under Section 5.3.2 of UDO to include prohibiting any development of the stie for 3-5 years. This
comment mainly applies to trees noted for saving in the tree save area on the site – removal of any of
these trees will affect your mitigation.
Response: Acknowledged.
Alton Orchard Formal TRC Comment Responses | 3
______________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________
3805 Cherry Avenue - Wilmington, NC 28403 - 910 791 4441 - www.csd-engineering.com – License # C-2710
Comment: Landscaping and buffering are only required for the amenity areas. The amenity center will need a
separate TRC application.
Response: Acknowledged, amenity center will be submitted under separate review.
Comment: Considering the proposed name of the development Alton Orchards, may we suggest planting a few
apple trees.
Response: Will look into some planting within the development.
Comment: Please note under 5.5.2.A that a lighting plan is not required for single-family residential projects and
the county does not require streetlights, however a lighting plan is required for any amenity area.
Response: Acknowledged, will submit with amenity center review.
Comment: No sign appears to be proposed, please confirm.
Response: An entrance sign will be utilized. Design and placement has not been finalized and will be submitted
under separate review.
Comment: For any signs on the site, a separate sign permit must be submitted and reviewed by the county for
compliance with Section 5.6 of the UDO for standards at or after the submittal of the separate zoning
compliance and construction permits for the primary building or use.
Response: Acknowledged.
Comment: Per the NCH conservation resources map, there is pocosin on this site however there are no class IV
soils. Therefore, the Conservation Resource Standards do not apply.
Response: Acknowledged
Comment: Performance residential subdivisions require 20% open space.
Response: Acknowledged, greater than 20% is provided.
Comment: Per the site data table on sheet 7, 5.52 acres of open space are being provided, at 25% of the sites total
acreage. This requirement is met.
Response: Acknowledged
Comment: Sidewalks are present on one side of the road throughout the subdivision.
Response: Acknowledged
Comment: Block length is acceptable.
Response: Acknowledged
Comment: Street connectivity: 2 links, 1 node = 2, which meets the street connectivity ratio.
Response: Acknowledged
Comment: No buildings are in a floodplain.
Response: Acknowledged
Alton Orchard Formal TRC Comment Responses | 4
______________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________
3805 Cherry Avenue - Wilmington, NC 28403 - 910 791 4441 - www.csd-engineering.com – License # C-2710
NHC Engineering
Comment: A County stormwater and land disturbing permit issued by the County is required for this project. Please
digitally submit the permit applications documentation with requisite review fees to the COAST online
permit portal (https://newhanovercountync-
energovpub.tylerhost.net/apps/selfservice#/home).Applicable forms can be found at
https://www.nhcgov.com/251/Stormwater-Permitting and https://www.nhcgov.com/249/Sediment-
Erosion-Control
Response: Acknowledged, Stormwater permit is being submitted through COAST portal.
Comment: Please contact the State for their Stormwater permit requirements. It is anticipated a high density
permit will be required.
Response: High Density NCDEQ Stormwater permit is being applied for.
NHC Environmental Health
Comment: Site plan reflects connection to public water. Proposed infrastructure does not violate setbacks to
adjoining properties’ well or septic systems.
Response: Acknowledged.
Comment: Subdivision swimming pool and clubhouse will need plans submitted to NHC Environmental Health with
building permit. Approval must be granted by Environmental Health prior to building permit issuance.
Response: Acknowledged.
NHC Addressing
Comment: Please contact me for address assignments following TRC approval.
Response: Acknowledged.