HomeMy WebLinkAboutPreliminary Plan Application - Combined - 03-2026
Page 1 of 1
Preliminary Subdivision Plan Application Cover Page – Updated 03-2026
PRELIMINARY PLAN — MAJOR RESIDENTIAL DEVELOPMENT APPLICATION
This application form must be completed as part of a subdivision preliminary plan application submitted through
the county’s online COAST portal. The main procedural steps in the submittal and review of applications are
outlined in the flowchart below. More specific submittal and review requirements, as well as the standards to be
applied in reviewing the application, are set out in Section 10.3.7(D)(1) of the Unified Development Ordinance.
(Optional)
Pre-
Application
Meeting
(Optional)
Community
Information
Meeting
1
Application
Submittal &
Acceptance
2
TRC
Review
Public Hearing
Scheduling &
Notification
Advisory
Body Review
& Action
Decision –
Making Body
Review &
Action
3
Post-Decision
Limitations
and Actions
Applicant and Property Owner Information Cover Page
Applicant/Agent Name Property Owner Name (if different from
Applicant/Agent)
Applicant / Agent Company (if applicable) Property Owner Company (if applicable)
Address Address
City, State, Zip City, State, Zip
Phone Phone
Email Email
The listed Applicant / Agent will be the point of contact for Planning & Land Use staff during the application review
process.
Page 1 of 5
Preliminary Subdivision Plan Application – Updated 03-2026
Applicant and Property Owner Information
Applicant/Agent Name Property Owner Name (if different from
Applicant/Agent)
Applicant / Agent Company (if applicable) Property Owner Company (if applicable)
Subject Property Information
Address/Location Parcel Identification Number(s)
Total Parcel(s) Acreage Existing Zoning and Use(s)
Development Name
Subdivision Type (Mark the type of subdivision being proposed)
Conventional Performance - Must use the attached Density Calculator
Housing Type (Ex: single-family attached, row-style, multi-family):
Number of Phases:
Traffic Impact Analysis (TIA)
Developments that generate 100 or more trips in the AM or PM peak hour must have a TIA
approved by NCDOT and the WMPO before the preliminary plan receives TRC approval.
Please provide the estimated number of trips generated for the proposed use(s) based off the most
recent version of the Institute of Transportation Engineers (ITE) Trip Generation Manual.
ITE Land Use (Code):
Trip Generation Variable (gross floor area, dwelling units, etc.):
AM Peak Hour Trips: PM Peak Hour Trips:
Page 2 of 5
Preliminary Subdivision Plan Application – Updated 03-2026
Application Requirements
Staff uses the following checklists to determine if the application is complete. Please verify all the listed
items are included and confirm by initialing under “Applicant Initial”. If an item is not applicable, mark
as “N/A”. Applications determined to be incomplet e must be corrected to be processed for further
review.
You are encouraged to arrange an informal pre-application meeting with Planning staff at least two
weeks before applying. Pre-application meetings help improve the chances of submitting a complete
application.
Application Checklist And Acknowledgement
Applicant
Initial
This application form, completed and signed _____
Application fee: $300 _____
Preliminary Plan including the elements on the attached checklist _____
One (1) digital PDF copy of ALL documents AND plans _____
Page 3 of 5
Preliminary Subdivision Plan Application – Updated 03-2026
Acknowledgement and Signatures
By signing below, I understand and accept the following:
• All the conditions, limitations, and obligations of the preliminary subdivision process for which I am
applying.
• That the existing Official Zoning Map is presumed to be correct.
• That a separate Tree Removal Permit (TRP) must be submitted and approved by New Hanover
County before TRC approval may be granted.
• That a Traffic Impact Analysis (TIA) must be approved by the WMPO and NCDOT for any project that
generates 100 or more trips in a peak hour before TRC approval may be granted.
• That other local, state, or federal permits or other new information or conditions related to the
property may result in changes that impact the final design of the project to include potential
reductions in density.
• That Planning staff will review each application, and if all required information is provided, they will
issue an Application Completeness Determination. This determination triggers the six -month
permit choice rule for the project, as outlined in North Carolina General Statutes 143-755 and 160D-
108.
• That this application is complete, and that all information presented in this application is accurate
to the best of my knowledge, information, and belief.
________________________________________ _________________ ___________
Signature of Property Owner and/or Developer Print Name Date
_______________________________________ _________________ ___________
Signature of Property Owner and/or Developer Print Name Date
Page 4 of 5
Preliminary Subdivision Plan Application – Updated 03-2026
Performance Residential Density Calculator
Baseline Data Used for Density Calculations
Total Acreage: (including all tracts used for the
project area and used to calculate density)
**Natural Resources: Total acreage of natural
lakes, ponds, rivers, and marshes
Natural Lakes:
Ponds:
Rivers:
Marshes:
Total Acreage of Natural Resources:
Class IV Soils: Total acreage of Class IV soils –
Must use the NHC soils map or field verification
by a soil scientist
Are there any acres of Class IV soil proposed for
permanent conservation? Yes / No:
Conservation: If yes, provide the total acreage
of Class IV soil proposed for permanent
conservation:
**The applicant is responsible for providing documentation verifying the type, acreage, and
boundary of each natural resource.
Density Calculation
Total Acreage
Minus Natural Resources -
Minus any Class IV soils not permanently
conserved -
Net tract acreage =
Maximum density of underlying zoning district
Net tract acreage multiplied by the maximum
density of underlying zoning district
= ________ Maximum Dwelling Unit Count
Proposed Unit Count
Page 5 of 5
Preliminary Subdivision Plan Application – Updated 03-2026
Preliminary Plan Checklist
The following table lists elements that must be included in the Preliminary Plan. Please make sure to include
all applicable items to ensure all the appropriate regulations may be reviewed.
General Information and Existing Conditions
1 Development name
2 Property owner’s name and address & Developer’s name and address (if different from owner)
4 Name of designer, engineer or surveyor
5 Scale no smaller than one inch to two hundred feet (1”=200’)
6 North arrow
7 Vicinity of location map
8 Date or dates plan was made
9 Tax Map, block and parcel numbers
10 Boundary line of tract to be developed drawn accurately to scale with linear and angular dimensions
11 Total gross and net acreage of tract to be developed
12 Existing zoning designation. Include all listed conditions for property subject to a Conditional
Rezoning, Special Use Permit, or Variance.
13
Existing site features and improvements including:
• Street rights-of-way, utilities including fire hydrants, structures and parking areas
• Property lines and names of adjoining property owners
14 Total acreage of existing impervious surface and percent impervious of the total site acreage.
Development Information
15
All proposed site features and development improvements including:
• Location and size of proposed lots with dimensions and lot numbers
• Number of dwelling units to be constructed
• Location of multiple dwelling unit structures (duplexes, attached single-family, condos,
apartments, etc.)
• Location, width, and designation of street rights-of-way, easements, and pedestrian facilities
• Cross section of streets and pedestrian facilities, and drainage design
• Location and size of all proposed stormwater and drainage facilities
• Location and size of all proposed utilities including fire hydrants and streetlights
• Boundaries and acreage of all open space, recreation space, conservation space, and
common area, and all other areas to be maintained by a homeowner association
16 Proposed density, minimum lot size, and average lot size
17 Setback lines and parking areas
Environmental Information
18 Topographical information (contour interval of 2 feet) and source
19 Natural features such as existing lakes, ponds, rivers, streams, and marshes.
20 Approximate location of regulated wetlands (401 & 404)
21 Location and acreage of areas identified as conservation resources in Section 5.7 of the UDO.
22 Location and acreage of areas identified as conservation used to calculate density for Performance
Residential development.
23 Boundary of Special Flood Hazard Areas
24 Location of required or proposed buffer yards
25 Areas and acreage of land identified as Class IV Soils by the 1980 NHC Soils Report, or by a licensed
Soil Scientist.