HomeMy WebLinkAbout20260408_Alexander Station Coffee Shop_TRC Comment Responses April 8, 2026 Zach Dickerson Senior Planner Planning and Land Use New Hanover County, North Carolina RE: 7440 Alexander Road – Alexander Station Townhomes – TRC Review PID#: R03600-004-002-000, R03600-004-001-000 and R03600-004-022-000 Egov#: SITECN-25-000120 Riverview Engineering Project No: 1023.02 Mr. Dickerson, In response to your letter regarding the TRC Review for the Alexander Road – Coffee Shop project, we offer the following responses: Planning - Zach Dickerson (910-798-7450) 1. General Comments a. The zoning is (CZD) B-2, tied to rezoning case Z25-11. b. There were eight conditions placed on this rezoning. Please list the following conditions on the site plan documents. This can be in a table or in a notes page: i. Existing trees that do not impact the proposed development, including changes to the site plan that constitute minor deviations, shall be preserved. ii. Emergency vehicle access shall be provided between the residential portion of the project and the convenience store. The location of the emergency vehicle access may be modified during the TRC process administratively. iii. A 10-foot-wide public bicycle and pedestrian easement shall be reserved from Alexander Road through the (CZD) R-5 portion of the site to the (CZD) B-2 portion of the site. Maintenance of the access easement shall be the responsibility of the residential portion of the project, the commercial portions of the project, or a combination thereof. Provisions for future maintenance shall be included in a maintenance agreement approved by New Hanover County and recorded with the Register of Deeds prior to signature and recordation of the final plat of the residential portion. iv. A bicycle and pedestrian path shall be provided between the residential units and the dedicated open space for the residential development. The path shall be reserved as a private access easement for the residents and owners of the residential units if the parcels are subdivided. 2 v. There shall be a maximum of twelve (12) dwelling units on the site’s residential portion, for a maximum density of eight (8) dwelling units per acre. The concept plan shows the dwelling unit type as row-style dwellings. The following attached dwelling types are authorized for development in the R-5 zoning district and may be utilized so long as the overall approved density is not exceeded: Row-Style, Quadraplexes, Triplexes, Duplexes, and Dual-Unit Attached. vi. All outdoor speakers, other than those used for the drive-throughs on the site, shall be oriented away from the R-5 portion of the site and the R-15 parcel to the north. vii. Drive-throughs appearing on the site plan may be administratively removed or adjusted on the same side of the buildings as shown on the concept plan. Changes to drive-through locations to other sides of the buildings would constitute a major deviation and require approval through the conditional rezoning process. viii. A stormwater maintenance agreement between property owners or a maintenance easement for the stormwater pond will be recorded with the New Hanover County Register of Deeds prior to TRC approval. c. Site is also located in the Special Highway Overlay District (SHOD) i. Site plan is in compliance with the SHOD. Response: Noted. d. As stated in the application the intended use is Coffee Shop. The Unified Development Ordinance (UDO) defines the use as. i. Restaurant: Establishments where food and beverages are prepared and sold on a retail basis for consumption on or off premises as its principal business. Response: Noted. ii. The site plan notes this having a drive-thru as well. Response: Noted. iii. As a note, coffee shop is not listed as a separate use in our UDO. The fall under the definition of restaurants. Response: Noted. e. The Planning and Land Use Department’s review of the site is for compliance with the UDO and use specific requirements of the specified land use. Any other activity that might occur on the property beyond the definition above should be noted on the application and site plan for additional review and comment. f. It does appear that there may be a Duke Utility Easement across the Market Street frontage. Please confirm. Response: Yes, Duke is in the process of relocating the line. 3 2. UDO Section 5.1, Parking and Loading a. Restaurants require 6 parking spaces per 1,000 sq ft of seating area. Response: Noted. b. The building is 984 sq ft, with 18 parking spaces provided. Response: Noted. c. Parking provided is sufficient. Response: Noted. 3. UDO Section 5.2, Traffic, Access and Connectivity a. Please note that no building permit for any structure shall be issued which requires NCDOT approval for a Driveway Permit until NCDOT has issued the permit approval. Evidence of approval shall accompany the application for building permit. Response: Noted. b. There is a TIA required for the master development, with required improvements. Those will need to be completed prior to driveway permit issuance. Response: Noted. c. See WMPO and NCDOT comments below for further explanation on this. Response: Noted. 4. UDO Section 5.3, Tree Retention a. For the trees needed for removal on site, please submit for a Tree Removal Permit. Response: Tree removal permit has been submitted. b. It may be easiest to submit a Tree Removal Permit for the master site. Response: Noted. c. I noted it up above, but please be reminded of the required rezoning condition: Existing trees that do not impact the proposed development, including changes to the site plan that constitute minor deviations, shall be preserved. Response: Noted. d. Note: Land disturbance permits can be issued by county Engineering before a Tree Removal Permit is approved by Planning. However, any trees removed before the Tree Removal Permit is issued may result in enforcement action under Section 5.3.2 of the Unified Development Ordinance to include prohibiting any development of the site for 3 to 5 years. Response: LD Permit has been issued by NHC. 4 5. UDO Section 5.4, Landscaping and Buffering a. Street Yard Landscaping: i. It appears that street yards are provided on the site, but the calculations are not shown like they are for foundation plantings. Response: Streetyard calculations added to Landscape Data table. b. Foundation plantings: i. Calculations look good, just need to show locations of the plantings. Response: Noted. c. Transitional Buffer: i. The transitional buffer area is detailed on the plan, but please demonstrate through planting materials how the required opacity will be achieved. Response: d. 15 trees per acre disturbed are required to be planted or retained on this site. Based on street yard and transitional buffer requirements, this requirement will likely be met but please detail this number and how it is being achieved in a table on the landscape plan. Response: Buffer calculations added to Landscape Data Table. e. All planting materials must comply with the approved planting materials listed in the New Hanover County Tree & Landscaping Manual. The species and size must be listed in the final landscape plan indicating compliance with the manual. Or evidence the proposed plant species are acceptable from the county Agricultural Extension office Response: Noted. 6. UDO Section 5.5, Lighting a. Please note that a lighting plan is not required for TRC approval but will be required prior to issuance of construction plan approvals. Response: Noted. b. Is any lighting proposed for the site? Response: Yes, Lighting Plan to be provided when received from Duke. 7. UDO Section 5.6, Signs a. It does look like a sign is shown for this portion of the development and is outside the site triangle, just make sure that when you apply for a sign permit it is compliant with the SHOD sign requirements. These can be found in UDO Section 3.5.3. Response: Noted. 5 b. For any signs on the site, a separate sign permit must be submitted and reviewed by the county for compliance with Section 5.6 of the UDO for standards at or after the submittal of the separate zoning compliance and construction permits for the primary building or use. Any approvals granted by the TRC for the site design is not an approval for the ultimate size or placement of the sign. Response: Noted. 8. UDO Section 5.7, Conservation Resources a. “The conservation resources map does not indicate any conservation resources impacting the property, this section does not apply.” Response: Noted. 9. UDO Article 9, Flood Damage Prevention a. No part of this site is in the floodplain. Response: Noted. NHC Fire Services – David Stone (910-798-7458) 1. The complete TRC/Site plans comments from New Hanover County Fire staff shall be submitted along with the building plans for review to New Hanover County Fire Marshal’s Office. This shall include the complete set of civil plans and site plans. Failure to submit the comments or complete set of civil plans and site plans will result in a resubmittal for review for verification of compliance. Response: Comments addressed in Townhouse response letter. 2. Street and road signs are required, temporary signs during construction are acceptable as long as they are legible and weather resistant. (Chapter 5). Response: Comments addressed in Townhouse response letter. 3. All fire hydrants shall have a 5 ¼ inch barrel, a 5 ¼ inch valve opening, two 2 ½ inch NST side discharges and a 5 inch pumper nozzle with a 5 inch STORZ connection. Further information on the technical specifications is available from the fire code official or Cape Fear Public Utility Authority. Response: Comments addressed in Townhouse response letter. 4. All fire hydrants shall be installed so they are visible from the fire apparatus access road with unobstructed access and a clear space no less than 36 inches in all directions. They shall be protected from vehicle impact by curbing, guard posts or other means approved by the fire code official. They shall be oriented with the large discharge facing the nearest street. All discharges shall meet the NFPA requirements for distance above grade. Response: Comments addressed in Townhouse response letter. NHC Engineering – Galen Jamison (910-798-7072) 6 1. A County stormwater and land disturbing permit issued by the County is required for this project. Please digitally submit the permit applications documentation with requisite review fees to the COAST online permit portal Response: NHC stormwater permit has been obtained. 2. It is unclear how the offsite drainage area to SCM#2 eastern portion will be directed to the SCM. The proposed fill appears to result ponding on adjacent parcels. Response: Resolved. 3. There appears to be a vertical conflict between the sanitary sewer and the 72” bypass storm sewer pipe. Response: Resolved. 4. The offsite stormwater drainage along the western boundary of the site may require a public drainage easement sized in accordance with NHC Stormwater Manual. If any construction in the offsite drainage conveyance measures easements that will be maintained by the county will need to be observed during construction by Stormwater Services and a turnover meeting scheduled once the system is ready to be conveyed to the county. Please add a plan note to ensure county construction observation and a turnover meeting occurs. Note, should the applicant elect to maintain the 72” storm pipe themselves, the POA covenants shall indicate the operation and maintenance roles and responsibilities of the existing ditch. Response: Resolved. 5. Please contact the State for their stormwater permit requirements. It is anticipated a new high density permit will be required. Response: Resolved. NHC Environmental Health – Dustin Fenske (910-798-6732) 1. Site plan reflects connection to public sewer. Septic tank located at 7718 Alexander Pl. must be located and properly abandoned by Pumping, Crushing and Filling. Proposed infrastructure appear to meet setbacks to surrounding properties well and septic systems. Response: Noted. 2. Site plan reflects connection to public water. Existing well located at 7718 Alexander Pl. must be located and properly abandoned by a Certified Well Driller. Proposed infrastructure appear to meet setbacks to surrounding properties wells and septic systems. Response: Noted. 3. Coffee Shop may need Food Service plan review depending on processes. Review may be done by NHC Environmental Health or the NC Environmental Health Plan Review Unit. If review is needed then approvals will be required prior to building permit issuance. Response: Noted. 7 NHC Addressing – McCabe Watson (910-798-7068) 1. Please contact me for address assignments following TRC approval. Response: Noted. Cape Fear Public Utility Authority – Bernice Johnson (910-332-6620) 1. CFPUA TRC Comments provided are preliminary comments only. Response: Permitting with CFPUA in process. 2. Utility Plan Review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering- 3/Engineering-Plan-Review-103. Response: Permitting with CFPUA in process. 3. CFPUA water and sewer (forcemain-to-forcemain connection) available. Response: Permitting with CFPUA in process. 4. Please note, separation domestic, irrigation, and fire line taps of the watermain will be required. Cannot tee of one line. Response: Permitting with CFPUA in process. 5. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains). Response: Permitting with CFPUA in process. 6. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. Response: Permitting with CFPUA in process. 7. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. Response: Permitting with CFPUA in process. NCDOT – Nick Drees (910-343-3915) General Comments: 1. NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx. You can coordinate with the District Office with any questions 910-398-9100 Response: NCDOT Driveway permitting in process. NCDOT Driveway Permit: 8 1. An NCDOT Driveway Permit is required. Submit plans in accordance with pages 14 and 15 of the Policy on Street and Driveway Access to North Carolina Highways to include access locations within 500’ of the proposed access on both sides of the State Road. Submit to the local NCDOT District Engineer’s Office. a. Refer to the NCDOT checklist (included) for required documents and site plan information. Response: NCDOT Driveway permitting in process. NCDOT Encroachment Agreement: 1. An NCDOT Encroachment Agreement is required for any utility connections or installations within the NCDOT right-of-way (form 16.6). a. Refer to the NCDOT UAM Manual and the NCDOT encroachment checklist for required documents and site plan information. Response: NCDOT Driveway permitting in process. 2. An NCDOT Encroachment Agreement is required for any sidewalk or multi-use paths installed within the NCDOT right-of-way (form 16.6). Response: NCDOT Driveway permitting in process. Required Roadway Improvements: 1. US 17 (Market Street) at Site Access 1 (proposed unsignalized right-in/right-out intersection): a. Construct Site Access 1 (eastbound approach) as a right-in/right-out intersection with one ingress lane and one egress lane. Response: NCDOT Driveway permitting in process. b. Provide stop control for the eastbound approach. Response: NCDOT Driveway permitting in process. c. Provide an internal protected stem of 100 feet, as measured from the right-of-way line. Response: NCDOT Driveway permitting in process. d. Construct a southbound right turn lane on Market Street with 125 feet of full width storage and appropriate deceleration and taper lengths. Response: NCDOT Driveway permitting in process. 2. SR 1345 (Alexander Road) at Site Access 2 (proposed unsignalized full movement intersection): a. Construct Site Access 2 (southbound approach) with one ingress lane and one egress lane. Response: NCDOT Driveway permitting in process. b. Provide stop control for the southbound approach. Response: NCDOT Driveway permitting in process. c. Provide an internal protected stem of 50 feet, as measured from the right-of-way line. 9 Response: NCDOT Driveway permitting in process. Site Plan Comments: No internal site plans associated with Alexander Road Retail Development should be approved until NCDOT has reviewed and approved the master site plan (grading, drainage, roadway improvements, etc.).: 1. Handled through the driveway permit review process. Response: NCDOT Driveway permitting in process. Drainage/Stormwater Conveyance: 1. If the drainage does not naturally flow to the NCDOT right of way the historic drainage pattern should be maintained. Response: NCDOT Driveway permitting in process. NCDOT Standard Drawings: 1. Include/update the NCDOT Standard Drawings (2024) that are applicable to the development. Response: NCDOT Driveway permitting in process. Sight Triangles and Sight Distance: 1. Show and label the 10’ X 70’ NCDOT sight triangles. a. No obstructions shall be placed within the NCDOT sight triangles. Response: NCDOT Driveway permitting in process. 2. Show and label the stopping sight distance. 1. No obstructions shall be placed within the stopping sight distance. Response: NCDOT Driveway permitting in process. Identification Signing and Landscaping: 1. Identification signing or landscape vegetation within the median and the sight distance triangle must not obstruct the driver’s line of sight. No landscaping or signing will be allowed to exceed 42 inches in height, measured from the Edge of Pavement (EOP) within the median or sight triangle. Response: NCDOT Driveway permitting in process. 2. All pylon signs in the median or sight distance triangle must provide a vertical clear sight zone between 3 feet-6 inches and 10 feet-0 inches measured from the EOP. Signing located within a clear recovery area shall be of a “breakaway design.” Response: NCDOT Driveway permitting in process. 3. Only low growing shrubbery, consistent with the NCDOT’s landscaping policies, as contained in the publication “Guidelines for Planting Within Highway Right of Way,” will be allowed within a landscaped median and the sight distance triangle at the entranceway to a development, whether the street or driveway connection to the State Highway System is designated as a public facility or 10 not. Landscaping within the right-of-way and sight distance triangles may require additional approval by the District Engineer. Response: NCDOT Driveway permitting in process. Pavement Markings (general comments): 1. Show proper callouts for all pavement markings within NCDOT R/W. a. Refer to the “Pavement Marking Legend Document” (included). Response: NCDOT Driveway permitting in process. 2. Add the following Notes: a. All pavement markings shall be thermoplastic and installed to the most current NCDOT standards. Response: NCDOT Driveway permitting in process. b. All pavement markers shall be snowplowable/raised, permanent markers and installed to the most current NCDOT standards. Response: NCDOT Driveway permitting in process. NCDOT Projects (STIP): 1. This development is located within an active project (STIP U-4902D). Response: Noted. 2. A hold harmless letter from the contractor (Sealand) will be required prior to the issuance of this permit that would allow work to take place within the active STIP Project. Response: Noted. Wilmington Urban Area Metropolitan Planning Organization (WMPO) – Luke Hutson (910-343-3915) (New Hanover County contracted traffic engineering services comments: NCDOT Projects 1. U-4902D US 17 BUS (Market Street) – access management improvements from SR 1403 (Middle Sound Loop Road) to SR 2290 (Mendenhall Drive). This project is in direct proximity to the proposed site location and is currently under construction. The project is estimated to be approximately 85% complete as of November 2025 with an estimated date of completion as December 30, 2025. Response: Noted. WMPO 2025 MTP Projects: 1. U-4902D – Is also in the 2050 WMPO MTP. Response: Noted. New Hanover County Projects: 1. N/A 11 TIA: A TIA for Alexander Road Retail was approved by the WMPO on June 4, 2025. All improvements outlined in the approved TIA are required. Please reach out to Caitlin Cerza (Caitlin.Cerza@wilmingtonnc.gov), the WMPO’s Transportation Planning Engineer, if any questions arise related to the TIA. The TIA approval with conditions letter will be attached to these comments. TIA Approval Letter with Conditions – Caitlin M. Cerza, WMPO (910-473-5130): Based upon the review of the analysis provided, the following improvements are required of this development. US 17 BUS (Market Street) at SR 1345 (Alexander Road) (existing unsignalized intersection; future signalized leftover). 1. No improvements are required. Response: NCDOT Driveway permitting in process. US 17 (Market Street) at Site Access 1 (proposed unsignalized right-in/right-out intersection) 1. Construct Site Access 1 (eastbound approach) as a right-in/right-out intersection with one ingress lane and one egress lane. Response: NCDOT Driveway permitting in process. 2. Provide stop control for the eastbound approach. Response: NCDOT Driveway permitting in process. 3. Provide an internal protected stem of 100 feet, as measured from the right-of-way line. Response: NCDOT Driveway permitting in process. 4. Construct a southbound right turn lane on Market Street with 125 feet of full width storage and appropriate deceleration and taper lengths. Response: NCDOT Driveway permitting in process. SR 1345 (Alexander Road) at Site Access 2 (proposed unsignalized full movement intersection) 1. Construct Site Access 2 (southbound approach) with one ingress lane and one egress lane. Response: NCDOT Driveway permitting in process. 2. Provide stop control for the southbound approach. Response: NCDOT Driveway permitting in process. 3. Provide an internal protected stem of 50 feet, as measured from the right-of-way line. Response: NCDOT Driveway permitting in process. 4. Construct a westbound right deceleration lane on Alexander Road with 50 feet of full width storage and appropriate taper length Response: NCDOT Driveway permitting in process. 12 SR 1345 (Alexander Road) at Site Access 3 (proposed unsignalized full movement intersection) 1. Construct Site Access 3 (westbound approach) with one ingress lane and one egress lane. Response: NCDOT Driveway permitting in process. 2. Provide stop control for the westbound approach. Response: NCDOT Driveway permitting in process. 3. Provide an internal protected stem of 50 feet, as measured from the right-of-way line. Response: NCDOT Driveway permitting in process. SR 1345 (Alexander Road) at Site Access 4 (proposed unsignalized full movement intersection) 1. Construct Site Access 4 (westbound approach) with one ingress lane and one egress lane. Response: NCDOT Driveway permitting in process. 2. Provide stop control for the westbound approach. Response: NCDOT Driveway permitting in process. 3. Provide an internal protected stem of 50 feet, as measured from the right-of-way line. Response: NCDOT Driveway permitting in process. * If changes are made to the proposed site driveways and/or land uses, the current trip distribution may need to be modified and would require a revised Traffic Impact Analysis to be submitted to the WMPO for review by NCDOT and New Hanover County, in which instance this approval would become null and void. *The applicant is required to obtain all applicable New Hanover County and NCDOT permits for access to the road network. A copy of this TIA approval shall be included with any NCDOT driveway permit application. All applicable NCDOT and New Hanover County technical standards and policies shall apply. Army Corps of Engineers – Brad Shaver (910-251-4611) 1. No issues, a JD has been completed on the site and there are no jurisdictional features on the site. Response: Noted. Sincerely, Nick Lauretta, P.E., LEED AP cc: Project File 1023.02