HomeMy WebLinkAbout20260504_ILM Hanger_TRC 2OH
P
OHP
UG
C
E
EE
E
E
S
S
S
S
S
S
S
S
S
UG
P
S
FM
FM
FM
FM
2" SSF
M
6" SSF
M
2.0%(TYP.)
2.0%(TYP.)
2.0%(TYP.)
2.0%(TYP.)
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
COVER
C-001
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
WILMINGTON INTERNATIONAL AIRPORT (ILM)
HANGER COMPLEX
2028 / 2032 GARDNER ROAD
WILMINGTON, NC 28401
FINAL DRAWINGS - NOT
RELEASED FOR CONSTRUCTION
MAY 4, 2026
VICINITY MAP1SCALE: 1" = 250'
SHEET INDEX
1.ALL MATERIALS AND CONSTRUCTION METHODS PER THE LATEST EDITION OF NEW HANOVER COUNTY
SPECIFICATIONS AND DETAILS.
2.ALL SITE WORK, AT A MINIMUM, SHALL BE PERFORMED IN ACCORDANCE WITH THE 2024 NCDOT
ROADWAY STANDARD DRAWINGS AND STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES
UNLESS OTHERWISE NOTED OR DIRECTED. ROADS SHALL BE CONSTRUCTED TO NCDOT STANDARDS
AND SPECIFICATIONS (LATEST EDITION).
3.UNDERGROUND UTILITIES MAY EXIST ON, ALONG OR WITHIN CONFLICT OF THIS PROJECT. THE
CONTRACTOR IS RESPONSIBLE FOR CONTACTING NC 811 OR THE APPROPRIATE UTILITY COMPANIES
PRIOR TO ANY EXCAVATION.
4.THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE DEMOLITION OF ANY EXISTING ON SITE
ITEMS AS SHOWN ON THE DEMO PLAN, ABOVE AND BELOW GROUND. THE CONTRACTOR IS ALSO
RESPONSIBLE FOR REMOVAL OF ALL WASTE RESULTING FROM DEMOLITION.
5.THE CONTRACTOR SHALL OBSERVE ALL REQUIRED SAFETY PRECAUTIONS IN THE PERFORMANCE OF
ALL WORK IN ACCORDANCE WITH CURRENT OSHA REGULATIONS.
6.THE CONTRACTOR SHALL GRADE, SEED, AND SOD OR OTHERWISE PROVIDE TEMPORARY AND
PERMANENT STABILIZATION OF ALL DISTURBED AREAS.
7.WORK WITHIN PUBLIC RIGHT-OF-WAYS SHALL BE IN ACCORDANCE WITH ALL STATE AND LOCAL
REQUIREMENTS, NOTIFICATIONS, STANDARDS AND POLICIES.
8.ANY SUBSTITUTIONS, CHANGES, OR MODIFICATIONS SHALL BE APPROVED BY THE PROJECT ENGINEER,
PLANNING DEPARTMENT STAFF, AND OWNER PRIOR TO INSTALLATION/CONSTRUCTION.
9.THE GRADE LINES DENOTE THE FINISHED ELEVATIONS OF THE PROPOSED SURFACE. GRADE LINES
MAY BE ADJUSTED AT THEIR BEGINNING, ENDING AND AT STRUCTURES AS DIRECTED BY THE
ENGINEER IN ORDER TO PROVIDE A PROPER TIE-IN. CONTRACTOR SHALL FIELD VERIFY ALL
PROPOSED INVERTS, FFE'S, AND FINISHED SURFACES TO ENSURE THAT MINIMUM SLOPE AND COVER
REQUIREMENTS ARE PROVIDED PRIOR TO INSTALLATION.
10.THE EARTHWORK ON THIS PLAN DOES NOT NECESSARILY BALANCE. OFFSITE BORROW OR WASTE MAY
BE REQUIRED.
11.ALL PIPE INVERTS TO BE VERIFIED IN THE FIELD PRIOR TO CONSTRUCTING GRAVITY SYSTEMS AND
SHALL BE ADJUSTED BY THE ENGINEER IF NECESSARY. ALL STORM DRIANAGE PIPE SHALL BE HP PIPE
DUAL WALL (POLYPROPYLENE PIPE).
12.NEW SIGNS REQUIRE ZONING COMPLIANCE AND BUILDING PERMITS PER UDO. A PERMIT IS REQUIRED
FOR THE SITE IDENTIFICATION SIGN. SIGN SHALL MEET NEW HANOVER COUNTY STANDARDS.
GENERAL NOTES
PROJECT NAME: ILM HANGER COMPLEX
OWNER: NEW HANOVER COUNTY AIRPORT AUTHORITY
1640 AIRPORT BLVD.
WILMINGTON, NC 28403
APPLICANT:MONTEITH CONSTRUCTION
CONTACT: NICK WELLER
PRECONSTRUCTION MANAGER
PHONE: (704) 560-8533
EMAIL: NWELLER@MONTEITHCO.COM
PROJECT ADDRESS: 2028 & 2032 GARDNER ROAD
WILMINGTON, NC 28401
ENGINEER: RIVERVIEW ENGINEERING, PLLC (P-1944)
4904 PARK AVENUE
WILMINGTON, NC 28403
CONTACT: NICHOLAS J. LAURETTA, PE, LEED AP (035107)
PHONE: (910) 398-2882
EMAIL: NLAURETTA@RIVERVIEWENG.COM
SURVEYOR:McKIM & CREED (F-1222)
243 N. FRONT STREET
WILMINGTON, NC 28401
CONTACT: CODY HURST (L-5557)
PHONE: 910-343-1048
EMAIL: CHURST@MCKIMCREED.COOM
PROJECT INFORMATION
VICINITY MAP
LOCATION MAP2SCALE: 1" = 2000'
LOCATION MAP
PROJECT
LOCATION
PROJECT
LOCATION
SHEET NUMBER SHEET TITLE
C-001 COVER
C-002 GENERAL NOTES & DETAILS
CX101 EXISTING CONDITIONS & DEMOLITION PLAN
CE101 SEDIMENT & EROSION CONTROL PLAN
CS101 SITE PLAN
CG101 STORM DRAINAGE & GRADING PLAN
CG102 DRAINAGE AREA MAP
CU301 UTILITY PLAN & PROFILE
CE501 SEDIMENT & EROSION CONTROL DETAILS
CE502 SEDIMENT & EROSION CONTROL DETAILS
CS501 SITE DETAILS
CS502 SITE DETAILS
CG501 STORM DRAINAGE DETAILS
CG502 STORM DRAINAGE DETAILS
CU501 UTILITY DETAILS
CU502 UTILITY DETAILS
CU503 UTILITY DETAILS
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
-
0
0
1
,
5
/
4
/
2
0
2
6
1
:
1
5
:
2
2
P
M
05/04/26
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
GENERAL NOTES
& DETAILS
C-002
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
CONSTRUCTION NOTES
1.CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH NEW HANOVER COUNTY STANDARDS
AND SPECIFICATIONS.
2.ALL SITE WORK, AT A MINIMUM, SHALL BE PERFORMED IN ACCORDANCE WITH THE 2024 NCDOT
ROADWAY STANDARD DRAWINGS AND STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES
UNLESS OTHERWISE NOTED OR DIRECTED. ROADS SHALL BE CONSTRUCTED TO NCDOT STANDARDS
AND SPECIFICATIONS (LATEST EDITION).
3.ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL CONFORM TO THE DRAWINGS, PROJECT
SPECIFICATIONS, AND LOCAL BUILDING CODES.
4.THE CONTRACTOR SHALL VERIFY HORIZONTAL AND VERTICAL SURVEY CONTROL PRIOR TO STAKING
OUT CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER
PRIOR TO PROCEEDING WITH WORK.
5.UNDERGROUND UTILITIES MAY EXIST ON, ALONG OR WITHIN CONFLICT OF THIS PROJECT. THE
CONTRACTOR IS RESPONSIBLE FOR CONTACTING NC 811 OR THE APPROPRIATE UTILITY COMPANIES
PRIOR TO ANY CONSTRUCTION ACTIVITIES.
6.THESE DRAWINGS SHOW INFORMATION OBTAINED FROM THE AVAILABLE RECORDS REGARDING PIPES,
CONDUITS, TELEPHONE LINES, AND OTHER STRUCTURES AND CONDITIONS WHICH EXIST ALONG THE
LINES OF WORK AND BELOW THE SURFACE OF THE GROUND. THE OWNER AND ENGINEER DISCLAIM
ANY RESPONSIBILITIES FOR THE ACCURACY OR COMPLETENESS OF SAID INFORMATION, AND SUCH
INFORMATION IS BEING SHOWN ONLY FOR THE CONVENIENCE OF THE CONTRACTOR WHO MUST
VERIFY THE INFORMATION TO HIS OWN SATISFACTION DURING THE BIDDING AND CONSTRUCTION
PHASES. IF THE CONTRACTOR RELIES ON SAID INFORMATION, HE DOES SO AT HIS OWN RISK. THE
GIVING OF THE INFORMATION ON THE CONTRACT DRAWINGS WILL NOT RELIEVE THE CONTRACTOR OF
HIS OBLIGATIONS TO SUPPORT AND PROTECT ALL PIPES, CONDUITS, TELEPHONE LINES, AND OTHER
STRUCTURES, WHETHER ABOVE OR BELOW GRADE.
7.SHOULD ANY DAMAGE OCCUR TO EXISTING UTILITIES, IT SHALL BE REPAIRED SOLELY AT THE
CONTRACTOR'S EXPENSE.
8.THE CONTRACTOR SHALL VERIFY EXISTING INVERTS PRIOR TO CONSTRUCTION OF UNDERGROUND
UTILITIES. TEST PITTING OF EXISTING LINES PRIOR TO CONSTRUCTION, IF NECESSARY, SHALL BE
COORDINATED WITH THE OWNER.
9.THE ENGINEER AND THE CONTRACTOR SHALL INSPECT ALL EXISTING PIPES USED IN THE FINAL
DRAINAGE SYSTEM AND AGREE ON THE CONDITION OF THE PIPES PRIOR TO CONSTRUCTION. IF
DAMAGE OCCURS TO THESE PIPES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE REPAIR OR REPLACEMENT OF THE PIPE(S).
10.THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE DEMOLITION OF ANY EXISTING ON SITE
ITEMS AS SHOWN ON THE DEMO PLAN, ABOVE AND BELOW GROUND. THE CONTRACTOR IS ALSO
RESPONSIBLE FOR REMOVAL OF ALL WASTE RESULTING FROM DEMOLITION.
11.THE CONTRACTOR SHALL OBSERVE ALL REQUIRED SAFETY PRECAUTIONS IN THE PERFORMANCE OF
ALL WORK IN ACCORDANCE WITH CURRENT OSHA REGULATIONS.
12.WORK WITHIN PUBLIC RIGHT-OF-WAYS SHALL BE IN ACCORDANCE WITH ALL STATE AND LOCAL
REQUIREMENTS, NOTIFICATIONS, STANDARDS AND POLICIES. CONTRACTOR IS RESPONSIBLE FOR
PLACING BARRICADES, USING FLAGMEN, ETC. AS NECESSARY TO ENSURE SAFETY TO THE PUBLIC.
13.ALL DISTURBED AREAS SHALL BE SMOOTHLY GRADED TO PROMOTE POSITIVE DRAINAGE AND
STABILIZED WITH TOPSOIL, SEED, AND MULCH. IF SETTLEMENT OCCURS, TOPSOIL, SEEDING, AND
MULCH SHALL BE REPEATED UNTIL SETTLEMENT SUBSIDES. (SEE EROSION AND SEDIMENT CONTROL
DETAILS AND SPECIFICATIONS.)
14.ALL WATER VALVES, BOXES, AND FIRE HYDRANT ASSEMBLES SHALL BE SET AND ADJUSTED TO
FINISHED GRADE.
15.FIRE HYDRANTS SHALL BE PLACED A MINIMUM DISTANCE OF 6 FEET FROM BACK OF CURB AND SHALL
HAVE A CLEAR SPACE OF 3 FEET FROM ANY PERMANENT STRUCTURE PER CFPUA STANDARDS.
16.ANY SUBSTITUTIONS, CHANGES, OR MODIFICATIONS SHALL BE APPROVED BY THE PROJECT ENGINEER,
PLANNING DEPARTMENT STAFF, AND OWNER PRIOR TO INSTALLATION/CONSTRUCTION.
17.THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR ANY DEVIATION FROM THESE PLANS.
18.ANY PROPERTY LINE MONUMENTATION DISTURBED DURING CONSTRUCTION SHALL BE REPLACED
SOLELY AT THE CONTRACTOR'S EXPENSE.
19.THE GRADE LINES DENOTE THE FINISHED ELEVATIONS OF THE PROPOSED SURFACE. GRADE LINES
MAY BE ADJUSTED AT THEIR BEGINNING, ENDING AND AT STRUCTURES AS DIRECTED BY THE
ENGINEER IN ORDER TO PROVIDE A PROPER TIE-IN. CONTRACTOR SHALL FIELD VERIFY ALL PROPOSED
INVERTS, FFE'S, AND FINISHED SURFACES TO ENSURE THAT MINIMUM SLOPE AND COVER
REQUIREMENTS ARE PROVIDED PRIOR TO INSTALLATION.
20.THE EARTHWORK ON THIS PLAN DOES NOT NECESSARILY BALANCE. OFFSITE BORROW OR WASTE MAY
BE REQUIRED.
21.ALL SELECT AND BORROW MATERIAL SHALL MEET CRITERIA SET FORTH BY SECTIONS 1016 AND 1018
OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION'S STANDARDS AND SPECIFICATIONS
FOR ROADS AND STRUCTURES. SEE SECTION FOR PLACEMENT AND COMPACTION INFORMATION.
22.EXISTING PAVING, CONCRETE, AND OTHER UNSUITABLE MATERIALS INCLUDING UNDERCUT
EXCAVATION SHALL NOT BE USED AS FILL MATERIAL AND SHALL BE DISPOSED OF OUTSIDE THE
PROJECT LIMITS AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR IS RESPONSIBLE FOR ALL
PERMITTING AND FEES FOR DISPOSAL.
23.ALL TREES, STUMPS, ROOT MAT, ETC. SHALL BE ENTIRELY REMOVED REGARDLESS OF DEPTH. BURIAL
OF ORGANIC MATERIAL WITHIN THE PROJECT LIMITS IS NOT PERMITTED. OPEN BURNING OF DOWNED
TREES AND STUMPS IS NOT PERMITTED. CHIPPED MATERIALS MUST BE REMOVED PRIOR TO THE
PLACEMENT OF EMBANKMENT OR TOPSOIL.
24.THE CONTRACTOR IS SOLELY RESPONSIBLE TO OBTAIN OFF-SITE SPOIL AREAS FOR DISPOSAL OF
EXCESS AND/OR UNSUITABLE MATERIALS AS NECESSARY. OFF-SITE SPOIL AREAS MUST BE SUBMITTED
TO THE ENGINEER AND APPLICABLE REGULATORY AGENCIES PRIOR TO UTILIZATION BY THE
CONTRACTOR. NO AREAS DESIGNATED AS WETLANDS WILL BE PERMITTED FOR USE AS A DISPOSAL
SITE. THE CONTRACTOR SHALL SUBMIT DOCUMENTATION TO THE ENGINEER THAT NO WETLANDS WILL
BE IMPACTED. THE ENGINEER WILL NOT CONSIDER ANY DELAYS OR MONETARY CLAIMS OF ANY
NATURE RESULTING FROM THE CONTRACTOR'S FAILURE OR DIFFICULTY IN FINDING NECESSARY
DISPOSAL SITES TO MEET THE TIME FRAMES AND CAPACITIES REQUIRED. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL PLANS, PERMITS, EROSION AND SEDIMENT CONTROL MEASURES, ETC.
REQUIRED BY THE APPROPRIATE REGULATORY AGENCIES FOR UTILIZING OFF-SITE SPOIL AREAS. THE
CONTRACTOR SHALL CERTIFY TO THE ENGINEER THAT ALL REQUIRED PERMITS HAVE BEEN OBTAINED
PRIOR TO UTILIZING THE OFF-SITE SPOIL AREAS. ALL COSTS FOR PROCURING AND UTILIZING THE
OFF-SITE SPOIL AREAS ARE TO BE INCIDENTAL TO THE BASE BID.
25.NEW SIGNS REQUIRE ZONING COMPLIANCE AND BUILDING PERMITS PER UDO. A PERMIT IS REQUIRED
FOR THE SITE IDENTIFICATION SIGN. SIGN SHALL MEET NEW HANOVER COUNTY STANDARDS.
26.THE OWNER IS RESPONSIBLE FOR THE ACQUISITION OF ALL EASEMENTS, BOTH TEMPORARY AND
PERMANENT.
27.THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND CONTACTING THE ENGINEER FOR THE
REQUIRED INSPECTIONS ON THE PROJECT.
EROSION CONTROL NOTES
1.ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE COUNTY
EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE.
2.GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF
STATE LAW AND IS SUBJECT TO A FINE. ANY BUILDER THAT ANTICIPATED THE DISTURBANCE OF MORE
THAN ONE ACRE WILL BE REQUIRED TO GET AN EROSION CONTROL PERMIT FROM NEW HANOVER
COUNTY.
3.GROUND COVER MUST BE PROVIDED ON EXPOSED SLOPES WITHIN 21 CALENDAR DAYS FOLLOWING
COMPLETION OF ANY PHASE OF GRADING; AND, A PERMANENT GROUND COVER FOR ALL DISTURBED
AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING
COMPLETION OF CONSTRUCTION OR DEVELOPMENT.
4.ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A
REPRESENTATIVE OF NEW HANOVER COUNTY.
5.SLOPES SHALL BE GRADED NO STEEPER THAN 3:1.
6.ADDITIONAL DEVICES MAY BE REQUIRED AS AGREED UPON BY THE FIELD INSPECTOR, ENGINEER, AND
OWNER.
7.IF ACTIVE CONSTRUCTION CEASES IN ANY AREA FOR MORE THAN 15 WORKING DAYS OR 90 CALENDAR
DAYS (WHICHEVER IS SHORTER), ALL DISTURBED AREAS MUST BE SEEDED, MULCHED, AND TACKED.
8.WITHIN 24 HOURS FOLLOWING ANY RAIN EVENT, THE CONTRACTOR SHALL INSPECT AND REPAIR, AS
NECESSARY, ALL DAMAGED EROSION CONTROL MEASURES.
9.ALL ACTIVITY AND INSTALLATION OF EROSION CONTROL MATTING WILL BE COMPLETE PRIOR TO ANY
RAIN EVENT.
FIRE PROTECTION NOTES
1.FIRE SPRINKLERS WILL BE PROVIDED FOR BUILDING.
2.HYDRANT MUST BE WITHIN 150' OF THE FDC.
3.THE FDC MUST BE WITHIN 40' OF FIRE APPARATUS PLACEMENT.
4.LANDSCAPING OR PARKING CANNOT BLOCK OR IMPEDE THE FDC OR FIRE HYDRANTS. A 3-FOOT CLEAR
SPACE SHALL BE MAINTAINED AROUND THE CIRCUMFERENCE OF THE HYDRANT AND FDC.
5.HYDRANTS MUST BE LOCATED WITHIN 6 FEET OF THE CURB.
6.COMBUSTIBLE MATERIALS MAY NOT BE STORED OR ERECTED ONSITE WITHOUT CITY FIRE INSPECTOR
APPROVAL.
7.NEW HYDRANTS MUST BE AVAILABLE FOR USE PRIOR TO CONSTRUCTION OF THE BUILDING(S).
8.A MINIMUM OF 5' SHALL SEPARATE UNDERGROUND FIRE LINES OR PRIVATE WATER MAINS FROM
UNDERGROUND UTILITIES
9.CONTRACTOR SHALL MAINTAIN AN ALL WEATHER ACCESS FOR EMERGENCY VEHICLES AT ALL TIMES
DURING CONSTRUCTION.
10.FIRE HYDRANTS ARE TO BE INSTALLED PER CFPUA SPECIFICATIONS.
EROSION CONTROL MAINTENANCE PLAN:
1.ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED AND REPAIRED, AS
NECESSARY, EVERY SEVEN (7) DAYS AND WITHIN 24 HOURS OF EVERY ONE-HALF (0.5) INCH OR
GREATER RAINFALL.
2.ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF
CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED
AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING
CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY
CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS
STABILIZED.
3.SEDIMENT SHALL BE REMOVED FROM BEHIND THE SILT FENCE WHEN IT BECOMES ABOUT 0.5 FEET
DEEP. THE SEDIMENT FENCE WILL BE REPAIRED OR REPLACED AS NECESSARY TO MAINTAIN A
BARRIER.
4.ALL AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO
SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER.
5.STONE CONSTRUCTION ENTRANCE TO BE CLEANED WHEN SEDIMENT ACCUMULATIONS ARE VISIBLE
OR SEDIMENT IS TRACKED ON TO THE PAVEMENT. STONE WILL BE PERIODICALLY TOP DRESSED WITH 2
INCHES OF #4 STONE TO MAINTAIN 6 INCH DEPTH. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL
FROM PAVEMENT, AS REQUIRED.
6.INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (0.5" OR GREATER) RAINFALL EVENT.
CLEAR THE DANDY SACKS OF SEDIMENT AND THE MESH WIRE OF ANY DEBRIS Or OTHER OBJECTS TO
PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE
WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. INLET PROTECTION SHOULD
BE CLEANED OUT WHEN IT IS HALF FULL.
7.INSPECT SILT FENCE ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS
IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR
BECOME INEFFECTIVE, REPLACE IT IMMEDIATELY. SEDIMENT SHALL BE REMOVED FROM BEHIND THE
SILT FENCE WHEN IT BECOMES ABOUT 0.5 FEET DEEP. THE SEDIMENT FENCE WILL BE REPAIRED OR
REPLACED AS NECESSARY TO MAINTAIN A BARRIER.
8.INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (1/2 INCH OR GREATER)
RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE, OF IF
STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER
DAMAGE. REPAIR OR REPLACE RIPRAP AS REQUIRED TO MAINTAIN EFFECTIVENESS. CONTROL WEED
AND BRUSH GROWTH AS NEEDED.
9.SILT FENCE OUTLETS ARE TO BE INSPECTED ONCE A WEEK AND AFTER EACH RAIN EVENT. MAKE ANY
REQUIRED REPAIRS IMMEDIATELY. SHOULD THE STONE BECOME CLOGGED WITH SEDIMENT, IT SHALL
BE CLEANED AND/OR REPACED PRIOR TO THE NEXT STORM EVENT. IF WASHOUT BETWEEN THE STONE
AND SILT FENCE OCCURS, THE AREAS SHALL BE REPAIRED IMMEDIATELY.
10.INSPECT ALL SILT SOCKS/WATTLES WEEKLY AND AFTER EACH RAINFALL OF 1.0 INCH OR GREATER.
REMOVE ACCUMULATED SEDIMENT AND ANY DEBRIS. SILT SOCK/WATTLE(S) MUST BE REPLACED IF
CLOGGED OR TORN. IF PONDING BECOMES EXCESSIVE, THE SILT SOCK/WATTLE MAY NEED TO BE
REPLACED WITH A LARGER DIAMETER OR A DIFFERENT MEASURE. REINSTALL IF DAMAGED OR
DISLODGED. SILT SOCKS/WATTLES SHALL BE INSPECTED UNTIL LAND DISTURBANCE IS COMPETE AND
THE AREA ABOVE THE MEASURE IS PERMANENTLY STABILIZED.
UTILITY NOTES
1.SCHEDULE A PRECONSTRUCTION MEETING WITH CAPE FEAR PUBLIC UTILITY AUTHORITY 48 HOURS
PRIOR TO CONSTRUCTION OF WATER AND SEWER LINES.
2.WATER AND SANITARY SEWER UTILITY MAINS ARE PRIVATE BEYOND THE PUBLIC STREET
RIGHT-OF-WAY.
3.THIS PROJECT SHALL COMPLY WITH THE CFPUA CROSS CONNECTION CONTROL REQUIREMENTS.
WATER METER(S) CANNOT BE RELEASED UNTIL ALL REQUIREMENTS ARE MET AND NCDENR HAS
ISSUED THE "FINAL APPROVAL".
4.ALL COMMERCIAL WATER SERVICES AND ANY IRRIGATION SYSTEMS SUPPLIED BY CFPUA WATER
SHALL HAVE A BACKFLOW PREVENTION DEVICE ACCEPTABLE TO CFPUA AND APPROVED BY
USCFCCCHR OR ASSE.
5.BACKFLOW PREVENTION AND METERS WILL BE PROVIDED FOR BOTH FIRE LINES (RPDA) AND
DOMESTIC SERVICE (RPZ). FIRE LINE BACKFLOW PREVENTER AND DOMESTIC SERVICE BACKFLOW
PREVENTER WILL BE LOCATED AS SHOWN ON THE UTILITY PLANS. INSTALLER OF BACKFLOW
PREVENTERS MUST CONTACT CFPUA PRIOR TO INSTALLING UNITS TO GIVE CFPUA THE OPTION TO
VERIFY INSTALLATION PROCEDURES.
5.1.REDUCED PRESSURE PRINCIPLE ASSEMBLY FOR DOMESTIC WATER SERVICE
5.2.REDUCE PRESSURE DETECTOR ASSEMBLY WILL BE UTILIZED FOR THE BACKFLOW PREVENTER
ON THE FIRE SERVICE.
6.IF THE CONTRACTOR DESIRES CFPUA WATER FOR CONSTRUCTION HE SHALL APPLY IN ADVANCE FOR
THIS SERVICE AND MUST PROVIDE A REDUCED PRESSURE ZONE (RPZ) BACKFLOW PREVENTION
DEVICE ON THE DEVELOPER'S SIDE OF THE WATER METER BOX.
7.WATER: 1.5" AND 2" PVC SERVICES SHALL BE CONSTRUCTED USING ASTM D2241, IPS, GASKETED PIPE,
SDR 21. 4"-12" PVC MAINS AND SERVICES SHALL BE CONSTRUCTED USING AWWA C-900 PVC, CL235
(DR-18). REQUIREMENTS OF AWWA C900 ELASOMERIC PUSH-ON JOINTS.
8.SANITARY SEWER: FOR PIPE SIZES 4" AND 6" PIPE SHALL BE SCH 40 CONFORMING TO THE
REQUIREMENTS OF ASTM D1785 WITH SOLVENT WELD JOINTS CONFORMING TO ASTM D2672. FOR PIPE
SIZES 8" THROUGH 12", PIPE SHALL BE CLASS 150, DR18 CONFORMING TO THE REQUIREMENTS OF
AWWA C900 WITH ELASTOMERIC PUSH-ON JOINTS CONFORMING TO ASTM D3212 OR ASTM D3139.
9.WATER AND SEWER SERVICES CANNOT BE ACTIVATED ON NEW MAINS UNTIL ENGINEER'S
CERTIFICATION AND AS-BUILTS ARE RECEIVED AND "FINAL APPROVAL" ISSUED BY PUBLIC WATER
SUPPLY SECTION OF NCDENR AND "FINAL ENGINEERING CERTIFICATION" ISSUED BY DIVISION OF
WATER QUALITY OF NCDENR.
10.WATERLINE TRACER WIRE: SEE CFPUA DETAIL WD-17.
11.SITE UTILITY CONTRACTOR TO PROVIDE WATER AND SANITARY SEWER SERVICE TO WITHIN 5 FEET OF
THE BUILDING. CONTRACTOR SHALL COORDINATE SITE PLAN CONNECTIONS WITH THE
ARCHITECTURAL BUILDING PLANS.
12.MAXIMUM BENDING RADIUS FOR 8" C-900 PVC WATER MAIN BENDS IS 380' (ONE-HALF MANUFACTURER'S
RECOMMENDED ALLOWABLE LONGITUDINAL BENDING).
13.UNDERGROUND UTILITIES: ALL NEW UTILITIES SHALL BE INSTALLED UNDERGROUND, EXCEPT WHERE
SUCH PLACEMENT IS PROHIBITED OR DEEMED IMPRACTICAL BY THE UTILITY PROVIDER.
UNDERGROUND TERMINAL FACILITIES FOR STREET LIGHTING ALONG THE PUBLIC STREETS ABUTTING
THE SUBJECT SITE SHALL BE INSTALLED BY THE DEVELOPER.
14.MINIMUM OF 36" COVERAGE ABOVE ALL WATERMAINS.
15.MINIMUM OF 36" VERTICAL SEPARATION BETWEEN WATERLINES AND STORMDRAIN CURB INLETS
16.A VARIANCE IS NOT ANTICIPATED FROM ANY NORTH CAROLINA DIVISION OF WATER QUALITY (DWQ)
REQUIREMENT.
17.PLANS ARE IN COMPLIANCE WITH CAPE FEAR PUBLIC UTILITY AUTHORITY TECHNICAL STANDARDS AND
SPECIFICATIONS.
RELATION OF WATER MAINS TO SANITARY SEWERS:
1.LATERAL SEPARATION OF SANITARY SEWERS AND WATER MAINS: WATER MAINS SHALL BE LAID AT
LEAST 10 FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS UNLESS LOCAL CONDITIONS OR
BARRIERS PREVENT A 10 FOOT LATERAL SEPARATION, IN WHICH CASE:
1.1.THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION OF THE BOTTOM OF THE
WATER MAIN AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER, OR
1.2.THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN LOCATED
AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND ABOVE THE TOP OF THE SEWER.
2.CROSSING A WATER MAIN OVER A SEWER MAIN: WHENEVER IT IS NECESSARY FOR A WATER MAIN TO
CROSS OVER A SEWER THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM
OF THE WATER MAIN IS AT LEAST 24 INCHES ABOVE THE TOP OF THE SEWER MAIN. UNLESS LOCAL
CONDITIONS OR BARRIERS PREVENT AN 18 INCH VERTICAL SEPARATION - IN WHICH CASE BOTH THE
WATER MAIN AND THE SEWER MAIN SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH
JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH
SIDE OF THE POINT OF CROSSING.
3.CROSSING A WATER MAIN UNDER A SEWER MAIN: WHENEVER IT IS NECESSARY FOR A WATER MAIN TO
CROSS UNDER A SEWER MAIN BOTH THE WATER MAIN AND THE SEWER MAIN SHALL BE CONSTRUCTED
OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE
OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING.
4.CROSSING A SEWER MAIN/WATER MAIN OVER OR UNDER A STORM DRAIN: WHENEVER IT IS
NECESSARY FOR A SEWER MAIN/WATER MAIN TO CROSS A STORM DRAIN PIPE, THE SEWER
MAIN/WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE OUTSIDE OF THE SEWER
MAIN/WATER MAIN NEAREST TO THE OUTSIDE OF THE STORM DRAIN PIPE SHALL MAINTAIN A 24 INCH
CLEAR SEPARATION DISTANCE HORIZONTAL, OR THE SEWER MAIN/WATER MAIN SHALL EITHER BE
CONSTRUCTED OF DUCTILE IRON PIPE OR ENCASED IN EITHER CONCRETE OR DUCTILE IRON PIPE FOR
AT LEAST 5 FEET ON EITHER SIDE OF THE CROSSING.
CAPE FEAR PUBLIC UTILITY AUTHORITY CONSTRUCTION PROCEDURE:
1.THE DESIGN ENGINEERING SHALL SUBMIT 3 SETS OF FINAL DESIGN PLANS AND APPROVED
SPECIFICATIONS PRIOR TO SCHEDULING THE PRE-CONSTRUCTION MEETING.
2.SUBMITTALS FOR MATERIALS SHOULD BE MADE IN ACCORDANCE WITH CFPUA SPECIFICATION
SECTION 01340. MATERIAL SHOP DRAWING SUBMITTALS ARE REQUIRED FOR ALL PHYSICAL ASSETS TO
ENSURE THEY COMPLY WITH CFPUA TECHNICAL SPECIFICATIONS AND DETAILS. THESE SUBMITTALS
ARE PROJECT-SPECIFIC, AND MUST INCLUDE OR HIGHLIGHT ONLY THE SPECIFIC MATERIALS TO BE
USED IN THE PROJECT. THE SUBMITTAL APPROVAL PROCESS IS GENERALLY AS FOLLOWS:
MATERIAL VENDOR FURNISHES SUBMITTALS TO THE CONTRACTOR BASED ON THE PROJECT
REQUIREMENTS. CONTRACTOR REVIEWS THE SUBMITTALS FOR COMPLIANCE WITH THE APPROVED
CONSTRUCTION DRAWINGS, CFPUA TECHNICAL SPECIFICATIONS AND DETAILS, AND FORWARDS TO
THE DEVELOPER’S ENGINEER-OF-RECORD WHEN COMPLETE.
THE DEVELOPER'S ENGINEER-OF-RECORD VERIFIES COMPLIANCE, STAMPS AND SIGNS THE
SUBMITTAL, AND FORWARDS THE PACKAGE TO THE CFPUA CONSTRUCTION MANAGER. IF IT IS
DETERMINED THAT THE MATERIAL SHOP DRAWING SUBMITTAL IS NOT IN COMPLIANCE, THE ENGINEER
SHALL RETURN IT TO THE CONTRACTOR FOR CORRECTION AND RESUBMISSION AS NOTED ABOVE.
CFPUA’S CONSTRUCTION MANAGER REVIEWS THE SUBMITTAL FROM THE DEVELOPER’S
ENGINEER-OF-RECORD, VERIFIES COMPLIANCE, AND NOTIFIES THE ENGINEER THAT THE MATERIALS
ARE APPROVED FOR CONSTRUCTION. IF IT IS DETERMINED THAT THE MATERIAL SHOP DRAWING
SUBMITTAL IS NOT IN COMPLIANCE, THE SUBMITTAL WILL BE RETURNED TO THE ENGINEER FOR
CORRECTION AND RESUBMISSION AS NOTED ABOVE.
3.ANY REQUEST FOR DEVIATIONS FROM THE STAMPED DRAWINGS AND MATERIAL SUBMITTALS MUST BE
SUBMITTED TO THE CFPUA CONSTRUCTION MANAGER. THE DEVIATION WILL BE REVIEWED BY CFPUA
STAFF. THE ENGINEER, CONTRACTOR AND CFPUA INSPECTOR WILL BE NOTIFIED IF IT IS APPROVED,
NEEDS TO BE REVISED AND RESUBMITTED OR REJECTED. ANY CHANGES TO THE STAMPED
CONSTRUCTION DOCUMENTS MADE IN THE FIELD BY THE CONTRACTOR MUST BE APPROVED BY THE
ENGINEER OF RECORD AND CFPUA CONSTRUCTION MANAGER. THE CFPUA INSPECTOR CANNOT
APPROVE MAJOR CHANGES FROM THE STAMPED CONSTRUCTION DOCUMENTS.
4.THE CFPUA INSPECTOR SHALL BE NOTIFIED WHEN ANY MATERIAL IS DELIVERED TO THE JOB SITE.
THE CFPUA INSPECTOR WILL VERIFY THAT ALL MATERIALS MEET CFPUA SPECIFICATIONS, DETAILS,
AND/OR APPROVED SUBMITTAL. THE CFPUA INSPECTOR WILL NOTIFY THE CONTRACTOR AND THE
CFPUA CONSTRUCTION MANAGER OF ANY UNAPPROVED MATERIAL, AND THAT THE UNAPPROVED
MATERIAL MUST BE REMOVED FROM THE PROJECT SITE.
5.CONTRACTOR SHALL GIVE TWO (2) BUSINESS DAYS NOTIFICATION FOR SCHEDULING TO THE ASSIGNED
CFPUA INSPECTOR FOR EACH OF THE FOLLOWING:
-OPERATING A CFPUA VALVE (INCLUDES TAPPING VALVES)
-WHEN BEGINNING CONSTRUCTION AND IF THE CONTRACTOR PULLS OFF THE SITE
-LAYING OUT OF ANY CONNECTION IN EXISTING MANHOLE
-CUTTING IN ANY NEW MANHOLES ON EXISTING LINES
-CORING ANY MANHOLES
-CONNECTING TO AN EXISTING SEWER FORCE MAINS
-CONNECTING ONTO EXISTING WATER LINES
-ANY BORES AND THREADING CARRIER PIPES
-ALL CAMERA WORK, TESTING, CHLORINATION AND WATER SAMPLING
-ALL TESTING
CAPE FEAR PUBLIC UTILITY AUTHORITY TESTING PROCEDURE:
1.ALL STRUCTURES, PRESSURE PIPING AND GRAVITY SEWER PIPING SHALL BE TESTED BY THE
CONTRACTOR AS SPECIFIED IN THE CFPUA SPECIFICATIONS IN ACCORDANCE WITH APPLICABLE
REGULATIONS AND AS DIRECTED BY THE CFPUA INSPECTOR. ALL TESTING MUST BE CONDUCTED IN
THE PRESENCE OF THE CFPUA INSPECTOR. THE CONTRACTOR IS TO GIVE TWO (2) BUSINESS DAYS
NOTIFICATION FOR SCHEDULING, TO THE ASSIGNED CFPUA INSPECTOR FOR ALL TESTING.
2.ALL PRESSURE PIPE LINES MUST BE SUBJECTED TO HYDROSTATIC TESTING IN ACCORDANCE WITH
THE APPROPRIATE CFPUA SPECIFICATION. THESE PIPE LINES SHALL BE TESTED TO 150 PSI FOR A
PERIOD OF TWO (2) HOURS. IF THE PRESSURE DROPS MORE THAN THREE (3) PSI, THE TEST FAILS.
REFER TO THE APPROPRIATE CFPUA SPECIFICATION FOR MORE INFORMATION ON THE PROCEDURE.
3.ALL WATER MAINS AND SERVICES MUST BE FLUSHED, CHLORINATED AND SAMPLED IN ACCORDANCE
WITH THE CFPUA SPECIFICATION 02660 AND AS DIRECTED BY THE CFPUA INSPECTOR.
4.SEWER LINE SEGMENT TESTING: EACH SEWER LINE SEGMENT (THE SEWER MAIN BETWEEN
MANHOLES) SHALL BE TESTED:
THIRTY (30) DAYS AFTER INSTALLATION AND PRIOR TO FINAL ACCEPTANCE OF THE PROJECT, ALL
SEWER LINE SEGMENTS AND ALL SERVICES SHALL BE CAMERA INSPECTED AND VIDEO
RECORDED. THE CFPUA INSPECTOR WILL REVIEW THE VIDEO RECORDING FOR ACCEPTANCE.
AS AN ALTERNATIVE TO WAITING THIRTY (30) DAYS TO PERMIT STABILIZATION OF THE SOIL-PIPE
SYSTEM, THE CFPUA MAY ACCEPT CERTIFICATION FROM A SOIL TESTING FIR VERIFYING THAT THE
BACKFILL OF THE TRENCH HAS BEEN COMPACTED TO AT LEAST 95% MAXIMUM DENSITY.
AFTER TWO (2) PAPER COPIES OF THE AS-BUILTS HAVE BEEN SUBMITTED TO THE CFPUA INSPECTOR.
AFTER GRAVEL HAS BEEN INSTALLED ON ALL ROADWAYS.
5.VIDEO INSPECTION TESTING: THE CONTRACTOR SHALL PROVIDE A DVD(S) OF EACH SEWER LINE
SEGMENT AND SERVICE LINE TO ENSURE THAT THE LINES MEET MINIMUM STANDARDS. THE DVD(S)
WILL BE REVIEWED IN THE ORDER THEY ARE RECEIVED. THE TYPICAL REVIEW TIME IS GENERALLY TEN
(10) TO FIFTEEN (15) BUSINESS DAYS BUT WILL DEPEND ON THE COMPLEXITY OF THE PROJECT, SIZE,
QUALITY OF THE DVD(S), ETC.
THE MAIN LINE CAMERA INSPECTION MUST HAVE PROJECT NAME, FOOTAGES, MANHOLE NUMBERS,
AND DATES OF INSPECTION.
THE SERVICE LINE CAMERA INSPECTION MUST INCLUDE PROJECT NAME, FOOTAGES, ADDRESS
AND/OR LOT NUMBER, AND DATE OF INSPECTION.THE CAMERA INSPECTION MUST SHOW THE FULL
DIAMETER OF THE PIPE.
THE CAMERA INSPECTION MUST BE PERFORMED UPON COMPLETION OF CLEANING AND POTABLE
WATER INTRODUCED INTO THE SYSTEM TO BE TESTED. ALL DEFECTS IN THE PIPELINE AND
APPURTENANCES SHALL BE REMEDIED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE
CFPUA AND WILL BE RE-INSPECTED AS OUTLINED ABOVE.
6.TWO (2) SETS OF AS-BUILT RECORD DRAWINGS SHALL BE PROVIDED IN ACCORDANCE WITH CFPUA
SPECIFICATION SECTION 01720 FOR REVIEW.
CIVIL LEGEND (NEW)
LIMITS OF DISTURBANCELOD
STORM DRAINAGE PIPE
WATER MAINW
SANITARY SEWER MAIN
WATER SERVICE
WATER VALVE
SANITARY SEWER SERVICE
SS
W
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
30
29
ROOF DRAINRD
DEMOLITION
SURVEY LEGEND (EXISTING)
PROPERTY LINE
UTILITY POLE
ADJOINERS PROPERTY LINE
(NOT SURVEYED)
WATER VALVE
FIRE HYDRANT
OHW
EDGE OF PAVEMENT
OVERHEAD WIRE
RIGHT-OF-WAY
X
R/W
PB
DB
PG
TIE LINE
EDGE OF WATER
P/L
R/W
DROP INLET
APRON/TAXI LIGHT
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
-
0
0
2
,
5
/
4
/
2
0
2
6
1
:
1
5
:
2
3
P
M
05/04/26
12
'
G
R
A
V
E
L
R
O
A
D
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
PAVED AIRPORT TAXI WAY
MAINTENANCE
BUILDING
CONCRETE
APRON
ASPHALT MOUND
SD
SD
SD SD SD SD
SD SD SD SD
SD
SD SD SD
SD
SD SD SD SD
SD
SD SD SD SD SD SD SD SD SD SD SD SD SD
FU
E
L
T
A
N
K
S
GENERATOR
PA
V
E
D
P
A
R
K
I
N
G
16' PAVED
R
O
A
D
SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
48" CMP
INV.=22.0'
18" RCP
SPOT ELEV.=43.0'
BENCHMARK
TOP OF CONC.
ELEV.=28.2'
DA
M
PR
O
P
A
N
E
PR
O
P
A
N
E
48" CMP
INV.=21.9'
24" RCP
INV.=21.5'
48" RCP
INV.=21.4'
UG ELECTRICAL BOX
SIGN
METAL STUBS
POSSIBLE
UNDERGROUND
TANK
54" CMP
INV.=21.5'
M&C CONTROL POINT
BENCHMARK
TOP OF NAIL
ELEV.=29.1'
N=193,886.83'
E=2,328,635.84'
NAD83/2011
M&C CONTROL POINT
BENCHMARK
TOP OF NAIL
ELEV.=27.7'
N=194,138.31'
E=2,328,623.17'
NAD83/2011
U.S.SURVEY FEET
GARDNER
D
R
I
V
E
22' PAVED
R
O
A
D
TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)
TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)
TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SDSD
SD SD
OHTL
OHTL
OH
P
OHP
OHP
OHP
OHP
OHP
OHP
U
G
C
UGCUGC
UGC
UGC
UGC
UGC
UG
C
UG
C
UG
C
UG
C
UG
C
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
OH
P
O
H
P
O
H
P
OH
P
W
W
W
W
W
W
W
W
WW
W W
W
W
W
W
W W W
WWWWWWWWW
E EE
UTLUTLUTL
S
S
S
UG
C
UG
C
UG
C
UG
C
UG
C
W W
W
W
W
W
W
W
W
W
W
W UG
P
UG
P
UG
P
UG
P
UG
P
U
G
P
UGPUGPUGPUGP UGPUGP
UG
P
S
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM 2" SSFM
6" SSFM
8" W
40'0 40'80'
SCALE: 1" = 40'
GRAPHIC SCALE
EXISTING CONDITIONS & DEMOLITION PLAN1SCALE: 1" = 40'
TSA
DITCH TO BE
RELOCATED
DITCH TO BE
RELOCATED
EXISTING ASPHALT
TO BE REMOVED
REMOVE EXISTING
CONCRETE APRON
10.0'
24
1
.
9
'
EX. 24" RCP TO
BE REMOVED
95.9'
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
EXISTING
CONDITIONS &
DEMOLITION
PLAN
CX101
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
DITCH TO BE FILLED
FENCE TO BE
REMOVED
ASPHALT ROADWAY
TO BE REMOVED
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
X
1
0
1
,
5
/
4
/
2
0
2
6
1
:
1
6
:
3
7
P
M
05/04/26
21
21
22
22
22
2222
22
22
2223
23
23
23
23 23
23
23
23
23
24
24
24
24
24
24
24
24
24
24
25
25
25
25
25
25
25
25
2525
25
26
26
26
26
26
26
26
26
26
26
26
27
27
27
27
27
27
27
27
27
2
7
2
7
27
2
7
27
27
28
2
8
28
28
12
'
G
R
A
V
E
L
R
O
A
D
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
PAVED AIRPORT TAXI WAY
MAINTENANCE
BUILDING
CONCRETE
APRON
ASPHALT MOUND
SD
SD
SD SD SD SD
SD SD SD SD
SD
SD SD SD
SD
SD SD SD SD
SD
SD SD SD SD SD SD SD SD SD SD SD SD SD
FU
E
L
T
A
N
K
S
GENERATOR
PA
V
E
D
P
A
R
K
I
N
G
16' PAVED
R
O
A
D
SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
48" CMP
INV.=22.0'
18" RCP
SPOT ELEV.=43.0'
BENCHMARK
TOP OF CONC.
ELEV.=28.2'
DA
M
PR
O
P
A
N
E
PR
O
P
A
N
E
48" CMP
INV.=21.9'
24" RCP
INV.=21.5'
48" RCP
INV.=21.4'
UG ELECTRICAL BOX
SIGN
METAL STUBS
POSSIBLE
UNDERGROUND
TANK
54" CMP
INV.=21.5'
M&C CONTROL POINT
BENCHMARK
TOP OF NAIL
ELEV.=29.1'
N=193,886.83'
E=2,328,635.84'
NAD83/2011
M&C CONTROL POINT
BENCHMARK
TOP OF NAIL
ELEV.=27.7'
N=194,138.31'
E=2,328,623.17'
NAD83/2011
U.S.SURVEY FEET
GARDNER
D
R
I
V
E
22' PAVED
R
O
A
D
TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)
TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)
TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
XXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SDSD
SD SD
OHTL
OHTL
OH
P
OHP
OHP
OHP
OHP
OHP
OHP
U
G
C
UGCUGC
UGC
UGC
UGC
UGC
UG
C
UG
C
UG
C
UG
C
UG
C
OH
P
W
W
W
W
W
W
W
W
WW
W W
WWW
E EE
UTLUTLUTL
UG
C
UG
C
UG
C
UG
C
UG
C
W W
W
W
W
W
W
W
W
W
W
W UG
P
UG
P
UG
P
UG
P
UG
P
U
G
P
UGPUGPUGPUGP
UG
P
S
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM 2" SSFM
6" SSFM
8" W
SF
SF
SF
SF
SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF
SF
SF SF
SF
TPA
TPA
TPA
TPA
TPA
TP
A
TPA
TPA
TPATPATPA
TPA
TPA
TP
A
T
P
A
T
P
A
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD LOD
LO
D
LODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLODLODLOD
LO
D
LO
D
LO
D
L
O
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LOD
L
O
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LOD
LOD
LO
D
LOD
LO
D
L
O
D
LO
D
LO
D
LOD
LOD LOD LOD LOD
L
O
D
LOD
LOD
27
272829
30
30
29
40'0 40'80'
SCALE: 1" = 40'
GRAPHIC SCALE
SEDIMENT & EROSION CONTROL PLAN1SCALE: 1" = 40'
TSA
DITCH TO BE
RELOCATED
DITCH TO BE
RELOCATED
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPERTY LINE
LOD LOD
SF
LIMITS OF DISTURBANCE
SILT FENCE
INLET PROTECTION
LOD
IP
CONSTRUCTION ENTRANCE
SF
CE
1.OBTAIN ALL NECESSARY STATE AND LOCAL PERMIT APPROVALS.
2.COMPLETE e-NOI AT https://edocs.deq.nc.gov/Forms/NCG01-NOI AND UPLOAD NOI CERTIFICATE FORM
WITH ORIGINAL SIGNATURES.
3.PRIOR TO INSTALLING SEDIMENT CONTROL MEASURES OR GRADING, AN OPTIONAL
PRE-CONSTRUCTION MEETING CAN BE SCHEDULED WITH THE NEW HANOVER COUNTY EROSION
CONTROL INSPECTOR.
4.PRIOR TO ANY CLEARING AND GRUBBING, INSTALL SILT FENCE, SILT FENCE OUTLETS AND GRAVEL
CONSTRUCTION ENTRANCE.
5.INSTALL TEMPORARY PUMP-AROUND FOR DRAINAGE DITCH TIE-IN ACTIVITIES.
5.1.INSTALL STILLING BASIN
5.2.INSTALL UPSTREAM PUMP AND TEMPORARY FLEXIBLE HOSE.
5.3.PLACE UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR DITCH DIVERSION.
5.4.PLACE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING APPARATUS. DEWATER ENTRAPPED
AREA. AREA TO BE DEWATERED SHALL BE EQUAL TO ONE DAY’S WORK.
5.5.INSTALL RELOCATED DRAINAGE DITCH IN ACCORDANCE WITH THE PLANS.
5.6.EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF IMPERVIOUS DIKES.
REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE. (DOWNSTREAM
IMPERVIOUS DIKES FIRST).
5.7.REMOVE STILLING BASIN AND BACKFILL. STABILIZE DISTURBED AREA WITH SEED AND MULCH.
6.COMMENCE GRUBBING AND GRADING WITHIN LIMITS OF CONSTRUCTION.
7.INSTALL RELOCATED DRAINAGE DITCHES. MAINTAIN EXISTING DITCHES UNTIL FINAL TIE-IN IS
REQUIRED.
8.MAKE FINAL TIE-IN FROM EXISTING DRAINAGE DITCH TO RELOCATED DRAINAGE DITCH.
9.INSTALL SEWER, WATER, AND STORMWATER CONVEYANCE MEASURES.
10.PREPARE BUILDING PAD AND CONSTRUCT BUILDING(S).
11.INSTALL CONCRETE APRON AND ASPHALT PARKING AREAS.
12.COMPLETE DRIVEWAY AND PARKING LOT CONSTRUCTION.
13.THE CONTRACTOR SHALL CONTINUOUSLY MAINTAIN EROSION CONTROL MEASURES TO MEET NEW
HANOVER COUNTY REQUIREMENTS.
14.SEED AND STABILIZE ALL AREAS PER EROSION CONTROL NOTES ON SHEET CE501 - SEDIMENT &
EROSION CONTROL DETAILS.
15.UPON COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL REQUEST FINAL INSPECTION FROM
THE NEW HANOVER COUNTY EROSION CONTROL INSPECTOR TO ALLOW REMOVAL OF ALL TEMPORARY
EROSION CONTROL DEVICES.
16.COMPLETE e-NOT AT https://edocs.deq.nc.gov/Forms/NCG01-Termination AND UPLOAD COMPLETED NOTICE
OF TERMINATION CERTIFICATE WITH ORIGINAL SIGNATURES.
CONSTRUCTION SEQUENCE
STAKED WATTLE CD
TPA TPA TEMPORARY PUMP AROUND TPA
TPA
TPA
SF
1.2
SF
1.3
SF
1.1
LOD
LOD
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
SEDIMENT &
EROSION
CONTROL PLAN
CE101
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
CE
SF
1.2
TPA
CD
CD
CD
DRAINAGE AREA DA
OUTLET PROTECTION OP
SF1.1
0.99 AC
SILT FENCE SUMMARY
NO.DA LENGTH AC/100 LF
(SF)(AC)(FT)
1.1 43,298 0.99 470 0.21
1.2 78,589 1.80 540 0.33
1.3 20,182 0.46 390 0.12
DA
DA
DA DA
CD
(3) STACKED 12"
WATTLES (TYP.)
SF1.2
1.80 AC
SF1.3
0.46 AC
CONSTRUCTION
STAGING AREA
CONCRETE
WASHOUT
RAIN GAUGE & PERMIT
DOCUMENT BOX
CD
CD
CD
(3) STACKED 12"
WATTLES (TYP.)
CLASS A RIP RAP
OUTLET PROTECTION
LENGTH: 6.0 FT
WIDTH: 4.5 FT
D50: 3 IN
THICKNESS: 9 IN
CLASS A RIP RAP
OUTLET PROTECTION
LENGTH: 6.0 FT
WIDTH: 4.5 FT
D50: 3 IN
THICKNESS: 9 IN
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
E
1
0
1
,
5
/
4
/
2
0
2
6
1
:
1
5
:
2
8
P
M
05/04/26
12
'
G
R
A
V
E
L
R
O
A
D
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
PAVED AIRPORT TAXI WAY
MAINTENANCE
BUILDING
CONCRETE
APRON
ASPHALT MOUND
FU
E
L
T
A
N
K
S
GENERATOR
PA
V
E
D
P
A
R
K
I
N
G
16' PAVED
R
O
A
D
48" CMP
INV.=22.0'
18" RCP
SPOT ELEV.=43.0'
BENCHMARK
TOP OF CONC.
ELEV.=28.2'
DA
M
PR
O
P
A
N
E
PR
O
P
A
N
E
48" CMP
INV.=21.9'
48" RCP
INV.=21.4'
UG ELECTRICAL BOX
SIGN
METAL STUBS
POSSIBLE
UNDERGROUND
TANK
54" CMP
INV.=21.5'
M&C CONTROL POINT
BENCHMARK
TOP OF NAIL
ELEV.=29.1'
N=193,886.83'
E=2,328,635.84'
NAD83/2011
M&C CONTROL POINT
BENCHMARK
TOP OF NAIL
ELEV.=27.7'
N=194,138.31'
E=2,328,623.17'
NAD83/2011
U.S.SURVEY FEET
GARDNER
D
R
I
V
E
22' PAVED
R
O
A
D
TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)
TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)
TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM 2" SSFM
6" SSFM
10
+
0
0
11
+
0
0
12
+
0
0
13
+
0
0
14
+
0
0
15
+
0
0
16
+
0
0
16
+
0
8
.
1
6
R
W
R
W
40'0 40'80'
SCALE: 1" = 40'
GRAPHIC SCALE
SITE PLAN1SCALE: 1" = 40'
140.3'
24.0'
18.0'
25
.
0
'
12
.
0
'
12
.
0
'
8.
0
'
13
0
.
3
'
13
0
.
3
'
140.3'
25.7'
CONCRETE
24
1
.
7
'
TSATSA
61
.
0
'
24.0'
ASPHALT
2.0' GRAVEL
SHOULDER
2.0' GRAVEL
SHOULDER
PROPOSED
HANGER
PROPOSED
HANGER
10
10 24" CONCRETE
CURB & GUTTER
(SPILL)
LANDSCAPE
ISLAND (TYP.)
PROJECT INFORMATION
PROJECT NAME ILM HANGER COMPLEX
PROJECT ADDRESS 1640 AIRPORT BLVD
WILMINGTON, NC 28403
OWNER NEW HANOVER COUNTY AIRPORT
AUTHORITY
PARCEL ID R04200-001-025-000
TOTAL PROPERTY ACREAGE ±1,340 AC
APPLICANT/DEVELOPER
MONTEITH CONSTRUCTION COMPANY
208 PRINCESS STREET
WILMINGTON, NC 28401
ENGINEER RIVERVIEW ENGINEERING, PLLC
NICHOLAS LAURETTA, PE, LEED AP
CURRENT ZONING AC
CURRENT USE VACANT LAND
PROPOSED USE AIRCRAFT HANGER
FLOOD HAZARD ZONE X
RIVER BASIN CAPE FEAR
RECEIVING STREAM SMITH CREEK (18-74-63)
CLASSIFICATION C: SW
PARKING
REQUIRED PARKING RATIO OFFICE - 2.5 SPACES / 1000 SF
REQUIRED PARKING 2.5 * 4,520 SF / 1000 SF = 12 SPACES
PARKING PROVIDED 18 + 2 ADA (20 TOTAL)
SETBACKS
FRONT
SIDE STREET
SIDE INTERIOR
REAR
IMPERVIOUS COVERAGE
EXISTING 14,880 SF
PROPOSED 82,115 SF
PROPOSED OFFSITE 0 SF
DISTURBED AREA 3.7 AC
170.8'
EXISTING WASH
RACK TO REMAIN
EXISTING
CONCRETE
TO REMAIN
EXISTING FENCE
TO REMAIN
FIRE APPARATUS
TURN AROUND
TOFATOFA
TRUSS SYSTEM
TRUSS SYSTEM
43
.
6
'
PROPOSED
SECURITY FENCE
TIE TO EXISTING
FENCE
61
.
8
'
9.
0
'
TY
P
.
18.0'
R25'
75.0'
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
SITE PLAN
CS101
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
NO TREES EXISTING ON THE SUBJECT PARCEL.
LANDSCAPE DATA
DISTURBED AREA ± 3.5 AC.
STREETYARD REQUIREMENTS N/A
REQUIRED N/A
PROPOSED N/A
SHADING REQUIREMENTS 8%
REQUIRED 13,306 SF * 0.08 = 1,064 SF
PROVIDED 962 SF
TRANSITIONAL BUFFER N/A
FOUNDATION PLANTINGS 12% OF BUILDING FACE
(2) * 108 LF * 15.5 FT * 0.12 = 402 SF PROVIDED: 426 SF
MITIGATION
DOCUMENTED TREES NO TREE REMOVAL
SIGNIFICANT TREES NO TREE REMOVAL
LANDSCAPE NOTES
1.THE AREAS WITHIN THE TRIANGULAR SIGHT DISTANCE SHALL BE
MAINTAINED FREE OF ALL OBSTRUCTIONS BETWEEN 30" AND 10'.
2.A RAIN/FREEZE SENSOR SHALL BE USED IF THERE IS AN IRRIGATION
SENSOR.
3.ALL PLANT BEDS ARE TO RECEIVE 3-4" OF PINESTRAW OR MULCH.
4.LANDSCAPING SHALL BE COMPLETE BEFORE ISSUANCE OF A CO.
5.NO REGULATED TREES EXIST ONSITE.
6.NO 404 WETLANDS EXIST ONSITE.
BOTANICAL / COMMON NAME CALIPER HEIGHT QTY REMARKS
KEY NO.CANOPY TREE
BOTANICAL / COMMON NAME HEIGHT SPREAD SPACING QTY REMARKS
SHRUBS
1 ILEX VOMITORIA NANA / DWARF YAUPON 24"24"4' O.C.16 PARKING LOT SHADING
2 ILEX VOMITORIA / YAUPON HOLLY 24"24"4' O.C.16 PARKING LOT SHADING
3 DISTYLIUM BLUE CASCADE 64 FOUNDATION
BOTANICAL / COMMON NAME QUANTITY REMARKS
GROUND COVER
CYNODON DACTYLON / BERMUDA GRASS
R
2
5
'
8.
0
'
BEGIN CONCRETE
CURB & GUTTER
END CONCRETE
CURB & GUTTER
24" CONCRETE
CURB & GUTTER
(SPILL)
4' CONCRETE
SIDEWALK
4' CONCRETE
SIDEWALK
9.
0
'
TY
P
.
183 SF
233 SF
486 SF
66 SF
FOUNDATION
PLANTING (TYP.)
20
.
0
'
56.0'
FUTURE HANGER
(NOT IN CONTRACT)
1
2
3
3
3
1
2
1
2
1 2
3
3
3
R
5
'
R5'
R
5
'
R5
'
R
5
'
FIRE HYDRANT
FIRE HYDRANT
TRIP GENERATION
INTENSITY ADT AM PEAK PM PEAK
PROPOSED
GENERAL AVIATION (021)35.6K GSF 43 20 22
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
S
1
0
1
,
5
/
4
/
2
0
2
6
1
:
2
9
:
3
9
P
M
05/04/26
21
21
22
22
22
2
222
22
22
22 23
23
23
23
23 23
23
23
23
23
24
24
24
24
24
24
24
24
24
24
25
25
25
25
25
25
25
25
2525
25
26
26
26
26
26
26
26
26
26
26
26
27
27
27
27
27
27
27
27
27
2
7
2
7
27
2
7
27
27
28
2
8
28
28
ÆÆÆÆÆÆÆÆÆÆÆ
Æ
Æ
Æ
Æ
Æ
Æ
Æ
Æ
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXX
MAINTENANCE
BUILDING
CONCRETE
APRON
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
FU
E
L
T
A
N
K
S
GENERATOR
PA
V
E
D
P
A
R
K
I
N
G
16' PAVE
D
R
O
A
D
48" CMP
INV.=22.0'
BENCHMARK
TOP OF CONC.
ELEV.=28.2'
PR
O
P
A
N
E
PR
O
P
A
N
E
48" CMP
INV.=21.9'
SIGN
METAL STUBS
POSSIBLE
UNDERGROUND
TANK
54" CMP
INV.=21.5'
TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)
TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
W
SD SD
UGP
UGP
OHTL
OHTL
OHTL
UG
C
UG
C
UG
C
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
OH
P
O
H
P
O
H
P
WWWWWWWWWWW
E EE
S
UG
C
UG
C
UG
C
UG
C
UG
C
UG
C
W W
W
W
W
W
W
W
W
UG
P
UG
P
UGP
UG
P
U
G
P
U
G
P
UGPUGPUGPUGPUGPUGP UGPUGPUGP
UG
P
S
FM
FM
FM
FM
FM
FM
FM
FM
2" SSFM
S
SS
SS
SS
SS
W
S
W
W
SS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD LOD LOD LOD
LO
D
LO
D
LODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLODLODLODLODLOD
LO
D
LO
D
LO
D
LO
D
L
O
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LODLO
D
LO
D
LOD
L
O
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LOD
LO
D
LO
D
LOD LOD LOD LOD LO
D
L
O
D
LOD
LOD
LOD
27
272829
30
30
29
25
25
25
27
26
25
24
23
22
22
23
24
26
27
28
26
24
23
22
27
22
23
24
28
28
28
26
27
28
2324
26
21 22 23 24 25 26 27 28
28
28
28
29
27 28
28
27
27
SD STR. 2
RIM: 26.27
INV IN: 21.22
SD STR. 7
RIM: 27.80
INV IN: 23.17
INV OUT: 23.17
SD STR. 8
RIM: 24.39
INV IN: 22.60
SD STR. 5
RIM: 28.00
INV IN: 22.00
SD STR. 4
RIM: 28.00
INV IN: 26.20
INV OUT: 22.40
SD STR. 1
RIM: 26.55
INV OUT: 21.50
SD STR. 10
INV OUT: 25.50
SD STR. 11
INV IN: 24.75
28
22
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
W
W
W
SD STR. 3
RIM: 28.35
INV IN: 26.20
INV OUT: 24.70
SD STR. 6
RIM: 27.80
INV OUT: 24.80
28.20
28.67
28.67
28.67
28.67
28.61
28.64
28.66
28.61
28.61
28.65
28.64
28.66
28.20
28.20
28.25
27.60
27.60
27.60
27.60
27.60
27.60
27.60
27.60
27.60
27.60
27.60
27.60
27.60
27.61
27.64
27.67
27.72
27.79
27.87
27.96
28.06
28.16
28.25
28.35
28.45
28.55
28.65
27.36
27.36
27.36
27.36
27.36
27.36
27.36
28.61
28.61
28.61
28.23
27.36
27.36
27.36
27.36
27.36
27.37
27.40
27.43
27.48
28.65
28.61
28.61
28.61
28.62
28.66
27.90
28.34
28.29
28.79
27.84
27.84
27.88
27.87
27.86
27.84
28.17
28.64
28.78
28.67
28.67
28.29
28.29
28.29
15
0
L
F
O
F
2
4
"
T
R
E
N
C
H
D
R
A
I
N
@
1
.
0
0
%
115LF OF 18" RCP @ 0.50%82LF OF 15" HDPE @ 2.00%
19
L
F
O
F
2
4
"
HD
P
E
@
2
.
1
4
%
51LF OF
1
5
"
R
C
P
@
1
.
4
7
%
1
3
8
L
F
O
F
5
4
"
C
L
I
V
R
C
P
@
0
.
2
0
%
13
9
L
F
O
F
2
4
"
T
R
E
N
C
H
D
R
A
I
N
@
0
.
0
0
%
52LF
O
F
2
4
"
H
D
P
E
@
3
.
2
4
%
Æ
Æ
Æ
Æ
Æ
Æ
Æ
Æ
ÆÆÆÆÆÆÆÆÆ
28.43
2.0%
(TYP.)2.0%
(TYP.)
2.0%
(TYP.)2.0%
(TYP.)
25
25
26
26
27
X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X
16' PAVE
D
R
O
A
D
M&C CONTROL POINT
BENCHMARK
TOP OF NAIL
ELEV.=29.1'
N=193,886.83'
E=2,328,635.84'
NAD83/2011
U.S. SURVEY FEET
GARDNE
R
D
R
I
V
E
22' PAVE
D
R
O
A
D
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
2" SSFM
6" SSFM
8" W
M
W
WLOD
LO
D
LOD
LOD
LOD
LO
D
LOD
LO
D
LOD
L
O
D
LO
D
LOD
29
29
FM
FM
FM
FM
FM
W
W
29.17
28.79
28.93
51LF OF
1
5
"
R
C
P
@
1
.
4
7
%
30'
SCALE: 1" = 30'
0 30'60'
GRAPHIC SCALE
STORM DRAINAGE & GRADING PLAN1SCALE: 1" = 30'
TSATSA
PROPOSED
HANGER
FFE 28.67
PROPOSED
HANGER
FFE 28.67
24" FLARED END
SECTION
MATERIALS AND EASEMENT NOTES:
1.ALL STORM DRAINAGE PIPING CONVEYING DISCHARGE FROM THE
PUBLIC RIGHT-OF-WAY SHALL BE CONTAINED WITHIN A PUBLIC
DRAINAGE EASEMENT WHOSE WIDTH IS DETERMINED BY THE DEPTH
OF BURY
EXCAVATION, GRADING, AND
BACKFILLING NOTES
1.ANY UNDERCUTTING IN GOOD SOIL SHALL BE REPLACED AND THE
REPLACEMENT MATERIAL SHALL BE COMPACTED TO NINETY-FIVE (95)
PERCENT OF MAXIMUM DENSITY OBTAINED AT OPTIMUM MOISTURE
CONTENT, AS DETERMINED BY THE ASTM D 698 STANDARD PROCTOR
TEST METHOD. IN THE EVENT THAT MATERIAL ENCOUNTERED AT PIPE
GRADE, SUBGRADE OF PARKING OR ROADWAYS AND SUBGRADE OF
BUILDING FOUNDATIONS IS FOUND TO BE SOFT, SPONGY, OR IN ANY
OTHER WAY UNSUITABLE, THE CONTRACTOR SHALL NOTIFY THE
GEOTECHNICAL ENGINEER IMMEDIATELY. SUCH UNSUITABLE MATERIAL
SHALL BE REMOVED TO A DEPTH AS SPECIFIED BY THE GEOTECHNICAL
ENGINEER AND REPLACED WITH A MINIMUM OF SIX (6) INCHES OF
STONE, OR AS DIRECTED BY THE GEOTECHNICAL ENGINEER.
2.BEFORE BACKFILLING IS COMMENCED OVER PIPES AND OTHER
INSTALLATIONS, EARTH FILL SHALL BE SOLIDLY TAMPED AROUND AND
ABOVE THE PIPE TO A DEPTH OF ONE (1) FOOT ABOVE THE TOP OF THE
PIPE. CARE SHALL BE TAKEN TO PREVENT ANY DISTURBANCE TO THE
PIPE OR DAMAGE TO NEWLY MADE JOINTS. THE FILLING OF THE
TRENCH SHALL BE CARRIED OUT SIMULTANEOUSLY ON BOTH SIDES OF
THE PIPES IN SUCH A MANNER THAT INJURIOUS SIDE PRESSURES DO
NOT OCCUR.
3.THE MATERIAL FOR BACKFILLING SHALL BE FREE FROM ALL PERISHABLE
AND OBJECTIONABLE MATERIALS. BEFORE PLACING ANY BACKFILL, ALL
RUBBISH, FORM, BLOCKS, WIRES OR OTHER UNSUITABLE MATERIAL
SHALL BE REMOVED FROM EXCAVATION. THE BACK-FILLING OVER
PIPES SHALL BE PLACED IN LAYERS NOT OVER SIX (6) INCHES THICK
AND COMPACTED TO A MINIMUM DENSITY OF NINETY-FIVE (95) PERCENT
OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED
PROCTOR COMPACTION TEST TO A DEPTH OF 12 INCHES BELOW
FINISHED GRADE. THE LAST 12 INCHES OF BACKFILL SHALL BE PLACED
IN LAYERS NOT OVER SIX (6) INCHES THICK AND COMPACTED TO A
MINIMUM DENSITY OF NINETY-EIGHT (98) PERCENT OF THE MAXIMUM
DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR
COMPACTION TEST.
STORM DRAINAGE AND GRADING NOTES
1.IN ACCORDANCE WITH NC GENERAL STATUTES, NPDES REGULATIONS,
AND NCDENR REQUIREMENTS, STORMWATER DISCHARGE OUTFALLS
SHALL BE INSPECTED BY THE CONTRACTOR. INSPECTIONS SHALL BE
PERFORMED BY THE CONTRACTOR AFTER EACH STORM EVENT OF 1/2
INCH OR GREATER, WITH ONE WEEKLY INSPECTION MINIMUM. NCDENR
STANDARD INSPECTION REPORTS SHALL BE PREPARED AND SIGNED
WITH COPIES PROVIDED TO THE OWNER, ARCHITECT, AND ENGINEER,
BY THE CONTRACTOR.
2.INLET PROTECTION SHALL BE INSTALLED AROUND OUTFALL. DEVICES
SHALL BE CONSTRUCTED TO FINAL PROPOSED CONDITION UPON
STABILIZATION OF CONTRIBUTING GROUND SURFACES AND REMOVAL
OF SEDIMENT FROM STORM PIPES.
3.ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD
VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION.
CONTRACTOR SHALL NOTIFY CONSTRUCTION MANAGER IF ANY
DISCREPANCIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION
FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA
COMPENSATION SHALL BE PAID TO CONTRACTOR FOR ANY WORK DONE
DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE
PLANS IF SUCH NOTIFICATION HAS NOT BEEN GIVEN.
4.UNLESS OTHERWISE NOTED, GRADES AND SPOT ELEVATIONS NOTED
ON PLANS INDICATE FINISHED GRADE OR PAVEMENT SURFACE. ALL
DIMENSIONS ARE MEASURED TO THE BACK OF CURB UNLESS
OTHERWISE INDICATED.
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
STORM DRAINAGE
& GRADING PLAN
CG101
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
STORM DRAINAGE & GRADING PLAN2SCALE: 1" = 30'
MATCHLINE - THIS SHEET
MATCHLINE - THIS SHEET
IP
OP
IP
OP
CLASS A RIP RAP
OUTLET PROTECTION
LENGTH: 8.0 FT
WIDTH: 3.05 FT
D50: 3 IN
THICKNESS: 9 IN
CLASS B RIP RAP
OUTLET PROTECTION
LENGTH: 27.0 FT
WIDTH: 13.5 FT
D50: 6 IN
THICKNESS: 22 IN
CLASS A RIP RAP
OUTLET PROTECTION
LENGTH: 6.0 FT
WIDTH: 4.5 FT
D50: 3 IN
THICKNESS: 9 IN
CLASS B RIP RAP
OUTLET PROTECTION
LENGTH: 27.0 FT
WIDTH: 13.5 FT
D50: 6 IN
THICKNESS: 22 IN
DITCH 1
DITCH 2
OP
OP
LEGEND
INLET PROTECTION IP
OUTLET PROTECTION OP
CLASS A RIP RAP
OUTLET PROTECTION
LENGTH: 5.0 FT
WIDTH: 3.8 FT
D50: 3 IN
THICKNESS: 9 IN
INV: 23.00
DITCH LINING, CURLEX I
OR APPROVED EQUAL
DITCH LINING, CURLEX I
OR APPROVED EQUAL
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
G
1
0
1
,
5
/
4
/
2
0
2
6
1
:
1
5
:
4
4
P
M
05/04/26
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
PAVED AIRPORT TAXI WAY
MAINTENANCEBUILDING
CONCRETE
APRON
ASPHALT MOUND
SD
SD SD SD SD SD SD
FU
E
L
T
A
N
K
S
GENERATOR
PA
V
E
D
P
A
R
K
I
N
G
16' PAVED
R
O
A
D
SDSDSDSDSDSDSDSDSD
48" CMPINV.=22.0'
18" RCP
SPOT ELEV.=43.0'
BENCHMARK
TOP OF CONC.
ELEV.=28.2'
DA
M
PR
O
P
A
N
E
PR
O
P
A
N
E
48" CMP
INV.=21.9'
48" RCP
INV.=21.4'
UG ELECTRICAL BOX
SIGN
METAL STUBS
POSSIBLE
UNDERGROUND
TANK
54" CMP
INV.=21.5'
M&C CONTROL POINT
BENCHMARK
TOP OF NAILELEV.=29.1'
N=193,886.83'
E=2,328,635.84'
NAD83/2011U.S. SURVEY FEET
M&C CONTROL POINTBENCHMARK
TOP OF NAILELEV.=27.7'
N=194,138.31'E=2,328,623.17'
NAD83/2011U.S.SURVEY FEET
GARDNER
D
R
I
V
E
22' PAVED R
O
A
D
TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)
TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)TOFA-(EX)
TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)
TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)TSA-(EX)
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
RSA
RSA
RSA
RSA
RSA
RSA
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
BRL
XXXXXXXXXXXXXXXXXXX
X
X
X
X
SD
F
M
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
2" SSFM
6" SSFM
25
25
25
27
26
25
24
23
22
22
23
24
26
27
28
26
24
23
22
27
22
23
24
28
28
28
26
27
28
2324
26
21 22 23 24 25 26 27 28
28
28
28
29
27 28
28
27
27
28
22
80'
SCALE: 1" = 80'
0 80'160'
GRAPHIC SCALE
DRAINAGE AREA MAP1SCALE: 1" = 80'
TSATSA
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
DRAINAGE AREA
MAP
CG102
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
EX1
16.55 AC
PROP1
1.51 AC
PROP2
2.76 AC
PROP3
0.66 AC
PROP4
2.82 AC
PROP5
0.75 AC
PROP6
0.20 AC
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
G
1
0
2
,
5
/
4
/
2
0
2
6
1
:
1
5
:
3
5
P
M
05/04/26
21
21
22
22
2222
22
22
22
23
23
23
23
23
23
23 2
3
2
3
24
24
24
24
24
24
24
2
4
2
4
25
25
25
25
25
25
2
5
2
5
25
26
26
26
2
6
26
26
2
6
2
6
26
2727
27
2
7
27
27
2
7
2
7
27
27
27
27
28
28
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
TO
F
A
-
(
E
X
)
TO
F
A
-
(
E
X
)
TO
F
A
-
(
E
X
)
TO
F
A
-
(
E
X
)
TS
A
-
(
E
X
)
TS
A
-
(
E
X
)
TS
A
-
(
E
X
)
BR
L
B
R
L
BR
L
BR
L
B
R
L
BR
L
BR
L
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SD
SD
UG
C
UG
C
UGC
OHP OHP
W
WWW FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
2"
S
S
F
M
6"
S
S
F
M
10+00 11+00 12+00 13+00 14+00 15+00 16+0016+08.16
SSSSSSSSS
W
S
W W
M
SS
W
W
WWWWWWWWW
W
WWWWWWWWWWWW
27
27
28
29
27
26 25 24 23 22
222324
26
27
28
26
242322
27
222324
28
28
28
262728
23
24
26
21
22
23
24
25
26
27
28
28
28
28
29
27
28
28 27
27
SD STR. 2
RIM: 26.27
INV IN: 21.22
SD STR. 7
RIM: 27.80
INV IN: 23.17
INV OUT: 23.17
SD STR. 8
RIM: 24.39
INV IN: 22.60
SD STR. 5
RIM: 28.00
INV IN: 22.00
SD STR. 4
RIM: 28.00
INV IN: 26.20
INV OUT: 22.40
SD STR. 1
RIM: 26.55
INV OUT: 21.50
SD STR. 10
INV OUT: 25.50
SD STR. 11
INV IN: 24.75
28
22
FM FM FM FM FM FM FM FM FM FM FM FM FM
W W W
SD STR. 3
RIM: 28.35
INV IN: 26.20
INV OUT: 24.70
SD STR. 6
RIM: 27.80
INV OUT: 24.80
WW
R W
R W
PROP. CO5
STA: 14+37.32
RIM: 28.50
INV IN: 25.50
INV OUT: 25.50
PROP. CO1
STA: 14+87.28
RIM: 28.50
INV OUT: 25.67
PROP. CO2
STA: 14+87.28
RIM: 28.50
INV IN: 25.50
INV OUT: 25.50
SD STR. 9
INV. 21.75
PROP. CO4
STA: 14+37.32
RIM: 28.50
INV OUT: 25.67
PROP. PUMP STATION
STA: 12+07.68
RIM: 28.62
SUMP: 16.94
INV IN: 22.30
PROP. S2
STA: 14+37.34
RIM: 28.27
INV IN: 24.33
INV IN: 24.89
INV OUT: 23.68
150LF OF 24" TRENCH DRAIN @ 1.00%
11
5
L
F
O
F
1
8
"
R
C
P
@
0
.
5
0
%
82
L
F
O
F
1
5
"
H
D
P
E
@
2
.
0
0
%
30LF OF 6" PVC @ 2.00%
19LF OF 24
"
HDPE @ 2.1
4
%
230LF OF 8" C900 PVC @ 0.60%
(PRIVATE)58
L
F
O
F
6
"
P
V
C
@
2
.
0
0
%
51
L
F
O
F
1
5
"
R
C
P
@
1
.
4
7
%
138L
F
O
F
5
4
"
C
L
I
V
R
C
P
@
0
.
2
0
%
139LF OF 24" TRENCH DRAIN @ 0.00%
52
L
F
O
F
2
4
"
H
D
P
E
@
3
.
2
4
%
EL
E
V
A
T
I
O
N
EL
E
V
A
T
I
O
N
STATION
15
20
25
30
35
15
20
25
30
35
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00
-2.00%
-0.50%
0.00%
PVI STA: 13+00.00
PVI ELEV: 27.60
K: 301.95
LVC: 150.00
LP STA: 13+75.00
LP ELEV: 27.60
BV
C
S
:
1
2
+
2
5
.
0
0
BV
C
E
:
2
7
.
9
7
EV
C
S
:
1
3
+
7
5
.
0
0
EV
C
E
:
2
7
.
6
0
18"
RCP
STA: 14+60.82
54"
CL IV RCP
STA: 12+05.09
PR
O
P
.
S
2
ST
A
:
1
4
+
3
7
.
3
4
RI
M
:
2
8
.
2
7
IN
V
I
N
:
2
4
.
3
3
(
P
-
(
2
5
)
)
IN
V
I
N
:
2
4
.
8
9
(
S
V
C
2
)
IN
V
O
U
T
:
2
3
.
6
8
(
S
S
1
)
230LF OF 8" C900 PVC @ 0.60%
PR
O
P
.
P
U
M
P
S
T
A
T
I
O
N
ST
A
:
1
2
+
0
7
.
6
8
RI
M
:
2
8
.
6
2
IN
V
I
N
:
2
2
.
3
0
(
S
S
1
)
58LF OF 6
"
P
V
C
@
2
.
0
0
%
30'
SCALE: 1" = 30'
0 30'60'
GRAPHIC SCALEUTILITY PLAN1SCALE: 1" = 30'
UTILITY PLAN & PROFILE2SCALE: HOR. 1" = 30' VER. 1" = 3'
FFE: 28.67FFE: 28.67
EXISTING GRADE
PROPOSED
GRADE
FUTURE
HANGER
8" C900 PCV DR18
FIRE MAIN
8" C900 PCV DR18
WATER MAIN
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
STORM DRAINAGE PIPE
WATER MAINW
SANITARY SEWER MAIN
WATER VALVE
SS
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
30
29
TS
A
TS
A
100 GPM
OIL/WATER
SEPARATOR
8"X8" CUT IN TEE
(2) 8" GV
SHUT DOWN
REQUIRED
(2) 8"X2" TAPPING
SADDLE
(2) 2" GV 8" RPDA IN
ENCLOSURE
(2) 1" HDPE
SERVICES
1" HDPE WATER SERVICE
8" C900 PVC FIRE SERVICE
(SEE MECHANICAL PLANS
FOR CONTINUATION)
8" X8" MJ TEE
(1) 8" GV
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
UTILITY PLAN &
PROFILE
CU301
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
A SS REVISIONS 12/02/25
2" HDPE SDR9
FORCEMAIN
(PRIVATE)
6"X2" TAPPING
SLEEVE & VALVE
FDC FDC
8"X6" MJ TEE
(1) 6" GV
FIRE HYDRANT
8" X8" MJ TEE
(1) 8" GV
FIRE HYDRANT
FIRE HYDRANT
B UTILITY REVISIONS 12/16/25
FIRE HYDRANT
WATER AND SEWER DEMAND
USE FLOW RATE DEMAND
TRANSPORTATION TERMINAL 5 GAL. / PASSENGER (100)500 GPD
OFFICE 25 GAL. /EMPLOYEE (4)100 GPDVALVE VAULT PER
CFPUA DETAIL S-14
18" MIN.
18" MIN.
8"X6" MJ TEE
FHA
8"X8" MJ TEE
8" GV 8"X8" MJ TEE
8" GV
(2) 5/8" WATER METER
(2) 5/8" RPZ (WATTS 909
OR APPROVED EQUAL)
8" C900 PVC FIRE SERVICE
(SEE MECHANICAL PLANS
FOR CONTINUATION)
8" GV
3.
0
'
T
Y
P
.
4.
0
'
T
Y
P
.
2" HDPE SDR9
FORCEMAIN
(PRIVATE)
6"X2" TAPPING
SLEEVE & VALVE
18" MIN.
18" MIN.18" MIN.
WATERLINE OFFSET UNDER
STORM. CENTERLINE PROFILE
VIEW IS SKEWED (TYP.)
FORCEMAIN OFFSET UNDER
STORM. CENTERLINE VIEW IS
SKEWED (TYP.)
40 LF OF 2" HDPE
INSTALLED BY HDD
1" HDPE WATER
SERVICE
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
U
3
0
1
,
5
/
4
/
2
0
2
6
1
:
1
5
:
4
9
P
M
05/04/26
NCG01 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19
GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITHTHE NCG01 CONSTRUCTION GENERAL PERMIT
Implementing the details and specifications on this plan sheet will result in the construction
activity being considered compliant with the Ground Stabilization and Materials Handling
sections of the NCG01 Construction General Permit (Sections E and F, respectively). Thepermittee shall comply with the Erosion and Sediment Control plan approved by the
delegated authority having jurisdiction. All details and specifications shown on this sheet
may not apply depending on site conditions and the delegated authority having jurisdiction.
GROUND STABILIZATION SPECIFICATION
Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the
techniques in the table below:
POLYACRYLAMIDES (PAMS) AND FLOCCULANTS
1.Select flocculants that are appropriate for the soils being exposed during
construction, selecting from the NC DWR List of Approved PAMS/Flocculants.
2.Apply flocculants at or before the inlets to Erosion and Sediment Control Measures.
3.Apply flocculants at the concentrations specified in the NC DWR List of Approved
PAMS/Flocculants and in accordance with the manufacturer's instructions.
4.Provide ponding area for containment of treated Stormwater before dischargingoffsite.
5.Store flocculants in leak-proof containers that are kept under storm-resistant cover
or surrounded by secondary containment structures.
HAZARDOUS AND TOXIC WASTE
1.Create designated hazardous waste collection areas on-site.
2.Place hazardous waste containers under cover or in secondary containment.
3.Do not store hazardous chemicals, drums or bagged materials directly on the ground.
EQUIPMENT AND VEHICLE MAINTENANCE
1.Maintain vehicles and equipment to prevent discharge of fluids.
2.Provide drip pans under any stored equipment.
3.Identify leaks and repair as soon as feasible, or remove leaking equipment from theproject.
4.Collect all spent fluids, store in separate containers and properly dispose as
hazardous waste (recycle when possible).
5.Remove leaking vehicles and construction equipment from service until the problem
has been corrected.
6.Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products
to a recycling or disposal center that handles these materials.
LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE
1.Never bury or burn waste. Place litter and debris in approved waste containers.
2.Provide a sufficient number and size of waste containers (e.g dumpster, trash
receptacle) on site to contain construction and domestic wastes.
3.Locate waste containers at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
4.Locate waste containers on areas that do not receive substantial amounts of runoff
from upland areas and does not drain directly to a storm drain, stream or wetland.
5.Cover waste containers at the end of each workday and before storm events orprovide secondary containment. Repair or replace damaged waste containers.
6.Anchor all lightweight items in waste containers during times of high winds.
7.Empty waste containers as needed to prevent overflow. Clean up immediately if
containers overflow.
8.Dispose waste off-site at an approved disposal facility.
9.On business days, clean up and dispose of waste in designated waste containers.
PAINT AND OTHER LIQUID WASTE
1.Do not dump paint and other liquid waste into storm drains, streams or wetlands.
2.Locate paint washouts at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
3.Contain liquid wastes in a controlled area.
4.Containment must be labeled, sized and placed appropriately for the needs of site.
5.Prevent the discharge of soaps, solvents, detergents and other liquid wastes fromconstruction sites.
PORTABLE TOILETS
1.Install portable toilets on level ground, at least 50 feet away from storm drains,
streams or wetlands unless there is no alternative reasonably available. If 50 foot
offset is not attainable, provide relocation of portable toilet behind silt fence or place
on a gravel pad and surround with sand bags.
2.Provide staking or anchoring of portable toilets during periods of high winds or in high
foot traffic areas.
3.Monitor portable toilets for leaking and properly dispose of any leaked material.Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace
with properly operating unit.HERBICIDES, PESTICIDES AND RODENTICIDES
1.Store and apply herbicides, pesticides and rodenticides in accordance with labelrestrictions.
2.Store herbicides, pesticides and rodenticides in their original containers with the
label, which lists directions for use, ingredients and first aid steps in case ofaccidental poisoning.
3.Do not store herbicides, pesticides and rodenticides in areas where flooding is
possible or where they may spill or leak into wells, stormwater drains, ground water
or surface water. If a spill occurs, clean area immediately.
4.Do not stockpile these materials onsite.
CONCRETE WASHOUTS
1.Do not discharge concrete or cement slurry from the site.
2.Dispose of, or recycle settled, hardened concrete residue in accordance with local
and state solid waste regulations and at an approved facility.
3.Manage washout from mortar mixers in accordance with the above item and in
addition place the mixer and associated materials on impervious barrier and within
lot perimeter silt fence.
4.Install temporary concrete washouts per local requirements, where applicable. If an
alternate method or product is to be used, contact your approval authority forreview and approval. If local standard details are not available, use one of the two
types of temporary concrete washouts provided on this detail.
5.Do not use concrete washouts for dewatering or storing defective curb or sidewalk
sections. Stormwater accumulated within the washout may not be pumped into or
discharged to the storm drain system or receiving surface waters. Liquid waste must
be pumped out and removed from project.
6.Locate washouts at least 50 feet from storm drain inlets and surface waters unless it
can be shown that no other alternatives are reasonably available. At a minimum,
install protection of storm drain inlet(s) closest to the washout which could receive
spills or overflow.
7.Locate washouts in an easily accessible area, on level ground and install a stone
entrance pad in front of the washout. Additional controls may be required by theapproving authority.
8.Install at least one sign directing concrete trucks to the washout within the project
limits. Post signage on the washout itself to identify this location.
9.Remove leavings from the washout when at approximately 75% capacity to limit
overflow events. Replace the tarp, sand bags or other temporary structural
components when no longer functional. When utilizing alternative or proprietary
products, follow manufacturer's instructions.
10.At the completion of the concrete work, remove remaining leavings and dispose of
in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance
caused by removal of washout.
EARTHEN STOCKPILE MANAGEMENT
1.Show stockpile locations on plans. Locate earthen-material stockpile areas at least
50 feet away from storm drain inlets, sediment basins, perimeter sediment controls
and surface waters unless it can be shown no other alternatives are reasonablyavailable.
2.Protect stockpile with silt fence installed along toe of slope with a minimum offset of
five feet from the toe of stockpile.
3.Provide stable stone access point when feasible.
4.Stabilize stockpile within the timeframes provided on this sheet and in accordance
with the approved plan and any additional requirements. Soil stabilization is defined
as vegetative, physical or chemical coverage techniques that will restrain accelerated
erosion on disturbed soils for temporary or permanent control needs.
A
A
BELOW GRADE WASHOUT STRUCTURE
1:1SIDE SLOPE(TYP.)
10 MILPLASTICLINING
3'-
0
"
MIN
.
& X
'
MAX
.
SECTION A-A
NOT TO SCALE
ABOVE GRADE WASHOUT STRUCTURENOT TO SCALE
PLAN
SECTION B-B
HIGHCOHESIVE &LOW FILTRATIONSOIL BERM
8"
6"
2'
HIGHCOHESIVE &LOW FILTRATIONSOIL BERM1:1 SIDE SLOPE(TYP.)
10 MILPLASTIC LINING
B
B
3'-
0
"
MIN
.
& X
'
MA
X
.
A
SANDBAGS (TYP.)OR STAPLES
SANDBAGS (TYP.)OR STAPLES
SANDBAGS (TYP.)OR STAPLES
SANDBAGS (TYP.)OR STAPLES
NOTES:1. ACTUAL LOCATION DETERMINED IN FIELD
2. THE CONCRETE WASHOUT STRUCTURES SHALL BEMAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES75% OF THE STRUCTURES CAPACITY.
3.CONCRETE WASHOUT STRUCTURE NEEDS TO BECLEARY MARKED WITH SIGNAGE NOTING DEVICE.
NOTES:1. ACTUAL LOCATION DETERMINED IN FIELD
2. THE CONCRETE WASHOUT STRUCTURESSHALL BE MAINTAINED WHEN THE LIQUIDAND/OR SOLID REACHES 75% OF THESTRUCTURES CAPACITY TO PROVIDEADEQUATE HOLDING CAPACITY WITH AMINIMUM 12 INCHES OF FREEBOARD.
3.CONCRETE WASHOUT STRUCTURE NEEDSTO BE CLEARY MARKED WITH SIGNAGENOTING DEVICE.
ONSITE CONCRETE WASHOUT
STRUCTURE WITH LINER
CONCRETEWASHOUT CONCRETEWASHOUT
PLAN
CLEARLY MARKED SIGNAGENOTING DEVICE (18"X24" MIN.)CLEARLY MARKED SIGNAGENOTING DEVICE (18"X24" MIN.)
SILT FENCE
10'MIN
10'MIN
SECTION E: GROUND STABILIZATION
Required Ground Stabilization Timeframes
Note: After the permanent cessation of construction activities, any areas with temporary
ground stabilization shall be converted to permanent ground stabilization as soon aspracticable but in no case longer than 90 calendar days after the last land disturbing
activity. Temporary ground stabilization shall be maintained in a manner to render the
surface stable against accelerated erosion until permanent ground stabilization is achieved.
Site Area Description Timeframe variations
-7 days for perimeter dikes, swales,
ditches, perimeter slopes and HQW Zones
-10 days for Falls Lake Watershed unless
there is zero slope
Stabilize within this
many calendar
days after ceasingland disturbance
7
7
7
14
None
None
(a)Perimeter dikes,
swales, ditches, and
perimeter slopes
(b)High Quality Water
(HQW) Zones
(c)Slopes steeper than
3:1
If slopes are 10' or less in length and are
not steeper than 2:1, 14 days are
allowed
(d)Slopes 3:1 to 4:1
(e)Areas with slopes
flatter than 4:1 14
-7 days for slopes greater than 50' in
length and with slopes steeper than 4:1
-7 days for perimeter dikes, swales,
ditches, perimeter slopes and HQWZones
-10 days for Falls Lake Watershed
NCG01 SELF-INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19
PART III
SELF-INSPECTION, RECORDKEEPING AND REPORTING
SECTION A: SELF-INSPECTION
Self-inspections are required during normal business hours in accordance with the table
below. When adverse weather or site conditions would cause the safety of the inspection
personnel to be in jeopardy, the inspection may be delayed until the next business day on
which it is safe to perform the inspection. In addition, when a storm event of equal to orgreater than 1.0 inch occurs outside of normal business hours, the self-inspection shall be
performed upon the commencement of the next business day. Any time when inspections
were delayed shall be noted in the Inspection Record.
NOTE: The rain inspection resets the required 7 calendar day inspection requirement.
PART III
SELF-INSPECTION, RECORDKEEPING AND REPORTING
SECTION B: RECORDKEEPING
1.E&SC Plan Documentation
The approved E&SC plan as well as any approved deviation shall be kept on the site. The
approved E&SC plan must be kept up-to-date throughout the coverage under this permit.
The following items pertaining to the E&SC plan shall be kept on site and available for
inspection at all times during normal business hours.
2. Additional Documentation to be Kept on Site
In addition to the E&SC plan documents above, the following items shall be kept on the
site and available for inspectors at all times during normal business hours, unless the
Division provides a site-specific exemption based on unique site conditions that make
this requirement not practical:
(a)This General Permit as well as the Certificate of Coverage, after it is received.
(b)Records of inspections made during the previous twelve months. The permittee shall
record the required observations on the Inspection Record Form provided by the
Division or a similar inspection form that includes all the required elements. Use of
electronically-available records in lieu of the required paper copies will be allowed if
shown to provide equal access and utility as the hard-copy records.
PART III
SELF-INSPECTION, RECORDKEEPING AND REPORTING
SECTION C: REPORTING
1.Occurrences that Must be Reported
Permittees shall report the following occurrences:
(a)Visible sediment deposition in a stream or wetland.
(b)Oil spills if:
·They are 25 gallons or more,
·They are less than 25 gallons but cannot be cleaned up within 24 hours,
·They cause sheen on surface waters (regardless of volume), or
·They are within 100 feet of surface waters (regardless of volume).
(c) Releases of hazardous substances in excess of reportable quantities under Section 311
of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA
(Ref: 40 CFR 302.4) or G.S. 143-215.85.
(d)Anticipated bypasses and unanticipated bypasses.
(e)Noncompliance with the conditions of this permit that may endanger health or the
environment.
2.Reporting Timeframes and Other Requirements
After a permittee becomes aware of an occurrence that must be reported, he shall contact
the appropriate Division regional office within the timeframes and in accordance with the
other requirements listed below. Occurrences outside normal business hours may also be
reported to the Department's Environmental Emergency Center personnel at (800)
858-0368.
3. Documentation to be Retained for Three Years
All data used to complete the e-NOI and all inspection records shall be maintained for a period
of three years after project completion and made available upon request. [40 CFR 122.41]
PART II, SECTION G, ITEM (4)
DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT
Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down
for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather).Non-surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met:
(a)The E&SC plan authority has been provided with documentation of the non-surface withdrawal and the specific time periods or conditions in which it will occur. The non-surface withdrawal
shall not commence until the E&SC plan authority has approved these items,
(b)The non-surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit,
(c)Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include
properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems,
(d)Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above,
(e)Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and
(f)Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States.
TEMPORARY SEEDING RECOMMENDATIONS
FOR LATE WINTER AND EARLY SPRING
TEMPORARY SEEDING RECOMMENDATIONS FOR SUMMER TEMPORARY SEEDING RECOMMENDATIONS FOR FALL
Seeding Mixture
Species
Rye (grain)
Annual lespedeza (Kobe in
Piedmont and Coastal Plain,
Korean in Mountains)
Rate (lb/acre)
120
50
Omit annual lespedeza when duration of temporary cover is not to
extend beyond June.
Seeding Dates
Mountains—Above 2500 feet: Feb. 15 - May 15
Below 2500 feet: Feb. 1- May 1
Piedmont—Jan. 1 - May 1
Coastal Plain—Dec. 1 - Apr. 15
Mulch
Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting,
or a mulch anchoring tool. A disk with blades set nearly straight can be
used as a mulch anchoring tool.
Maintenance
Refertilize if growth is not fully adequate. Reseed, refertilize and mulch
immediately following erosion or other damage.
Seeding Mixture
Species
German millet
Rate (lb/acre)
40
Seeding Dates
Mountains — May 15 - Aug. 15
Piedmont — May 1 - Aug. 15
Coastal Plain — Apr. 15 - Aug. 15
Mulch
Maintenance
Seeding Mixture
Species
Rye (grain)
Seeding Dates
Mountains — Aug. 15 - Dec. 15
Coastal Plain and Piedmont — Aug. 15 - Dec. 31
Mulch
Maintenance
Repair and refertilize damaged areas immediately. Topdress with 50
lb/acre of nitrogen in March. If it is necessary to extend temporary
cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and
Coastal Plain) or Korean (Mountains) lespedeza in late February or
early March.
Rate (lb/acre)
120
Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt,
netting, or a mulch anchoring tool. A disk with blades set nearly
straight can be used as a mulch anchoring tool.
Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt,
netting, or a mulch anchoring tool. A disk with blades set nearly
straight can be used as a mulch anchoring tool.
SEED BED PREPARATION:
LIMING- Apply lime according to soil test recommendations. If the pH (acidity) of the soil is not known, an application of ground agricultural limestone at the rate of 1-11
2
tons/acre on coarse-textured soils and 2-3 tons/acre on fine-textured soils is usually sufficient. Apply limestone uniformly and incorporate into the top 4-6 inches of soil.
Soils with a pH of 6 or higher need not be limed.
FERTILIZER- Base application rates on soil tests. When these are not possible, apply a 10-10-10 grade fertilizer at 700 - 1,000 lb/acre. Both fertilizer and lime should be
incorporated into the top 4-6 inches of soil. If a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application.
SURFACE ROUGHENING- If recent tillage operations have resulted in a loose surface additional roughening may not be required, except to break up large clods. If rainfall
causes the surface to become sealed or crusted, loosen it just prior to seeding by raking, harrowing, or other suitable methods for fine grading. The finished grade shall
be a smooth even soil surface with a loosen uniformly fine texture. All ridges and depressions shall be removed and filled to provide the approved surface drainage.
Planting is to be done immediately after finished grades are obtained and seedbed preparation is completed.
Refertilize if growth is not fully adequate. Reseed, refertilize and mulch
immediately following erosion or other damage.
In the Piedmont and Mountains, a small-stemmed Sudangrass may be
substituted at a rate of 50 lb/acre.
DATE:PAGE:
NORTH CAROLINA
Department of Environmental Quality
Effective Date: 9/1/2023
In accordance with the 2013
Design Manual UpdatesTEMPORARY SEEDING
NOTES:
1.Permanent seeding, sodding or other means of stabilization are required when all construction work is completed according to the NPDES timeframes table.
2.A North Carolina Department of Agriculture soils test (or equal) is highly recommended to be obtained for all areas to be seeded, sprigged, sodded or planted.
3.Use a seeding mix that will produce fast0growing nurse crops and includes non-invasive species that will eventually provide a permanent groundcover. Soil blankets may be used in lieu of nurse crops.
Mat, tack or crimp mulch, as needed to stabilize seeded areas until root establishment. Mulch must cover at leaser 80% of the soil surface.
4.Ground cover shall be maintained until permanent vegetation is established and stable against accelerated erosion.
SEED BED PREPARATION:
LIMING- Apply lime according to soil test recommendations. If the pH (acidity) of the soil is not known, an application of ground agricultural limestone at the rate of 1 to 1 12 tons/acre on coarse0textured soils
and 2-3 tons/acre on fine-textured soils is usually sufficient. Apply limestone uniformly and incorporate into the top 4-6 inches of soil. Soils with a pH of 6 or higher need not be limed.
FERTILIZER- Base application rates on soil tests. When these are not possible, apply a 10-10-10 grade fertilizer at 700-1,000 lb/acre. Both fertilizer and lime should be incorporated into the top 4-6 inches of
soil. If a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application.
SURFACE ROUGHENING- If recent tillage operations have resulted in a loose surface additional roughening may not be required, except to break up large clods. If rainfall causes the surface to become
sealed or crusted, loosen it just prior to seeding by raking, harrowing, or other suitable methods for fine grading. the finished grade shall be a smooth even soil surface with a loosen uniformly fine texture.
all ridges and depressions shall be removed and filled to provide the approved surface drainage . Planting is to be done immediately after finished grades are obtained and seedbed preparation is
completed.
SEEDING MIXTURE
Species Rate
Centipede 5 lbs/acre
Indian Woodoats 1.5-2.5 lbs/acre*
Virginia Wild Rye 4-6 lbs/acre
*Depending upon mix with other species. See table 6.11.d
from Chapter 6 of the NC Erosion and Sediment Control
Planning and Design Manual.
Seeding Dates
Coastal or Eastern Piedmont for Centipede- Sept. 1 - May 1
Coastal and Piedmont for Indian Woodoats and Virginia
Wild Rye- Feb 15 - April 1
Mountains for Indian Woodoats and Virginia Wild Rye-
March 1 - May 15
Maintenance:
Significant maintenance may be required to obtain desired
cover.
SEEDING MIXTURE
Species Rate
Indian Woodoats 1.5-2.5 lbs/acre*
Virginia Wild Rye 4-6 lbs/acre*
*Depending upon mix with other species.
See table 6.11.d from Chapter 6 of the NC
Erosion and Sediment Control Planning
and Design Manual.
Seeding Dates
Mountains - July 15- Aug 15
Piedmont - Aug 15 - Oct 15
Maintenance:
Indian Woodoats and Virginia Wild Rye
are both sun and shade tolerant.
SEEDING MIXTURE
Species Rate
Hard Fescue 15 lbs/acre
Switchgrass 2.5-3.5 lbs/acre*
Indian Grass 5-7 lbs/acre*
Big Bluestem 5-7 lbs/acre*
Indian Woodoats 1.5-2.5 lbs/acre*
Virginia Wild Rye 4-6 lbs/acre*
*Depending upon mix with other species. See table 6.11.d from
Chapter 6 of the NC Erosion and Sediment Control Planning and
Design Manual.
Seeding Dates
Mountains - Hard Fescue- Aug 1 - June 1
Mountains- Switchgrass, Indian Grass, Big Bluestem- Dec 1 - April 15
Piedmont and Coastal- Switchgrass, Indian Grass, Big Bluestem-
Dec 1 - April 1
Coastal- Indian Woodoats and Virginia Wild Rye- Sept 1 - Nov 1
Maintenance:
Hard Fescue is not recommended for slopes > 5%. Prefers shade.
NON-INVASIVE PERMANENT SEEDING RECOMMENDATIONS
FOR LATE WINTER AND EARLY SPRING NON-INVASIVE PERMANENT SEEDING
RECOMMENDATIONS FOR SUMMER
NON-INVASIVE PERMANENT SEEDING
RECOMMENDATIONS FOR FALL
DATE:PAGE:
NORTH CAROLINA
Department of Environmental Quality
Effective Date: 9/1/2023
In accordance with the 2013
Design Manual UpdatesPERMANENT SEEDING
CONSIDERATIONS FOR CONSTRUCTION SCHEDULING
CONSTRUCTION ACTIVITY SCHEDULE CONSIDERATION
CONSTRUCTION ACCESS: Construction entrance, construction
routes, equipment parking areas.
First land-disturbing activity- Stabilize bare areas immediately with gravel and temporary
vegetation as construction takes place.
SEDIMENT TRAPS AND BARRIERS: Basin traps, sediment fences,
and outlet protection.
Install principal basins after construction site is accessed. Install additional traps and barriers
as needed during grading.
RUNOFF CONTROL: Diversions, perimeter dikes, water bars, and
outlet protection.
Install key practices after principal sediment traps and before land grading. Install additional
runoff-control measures during grading.
RUNOFF CONVEYANCE SYSTEM: Stabilize streambanks, storm
drains, channels, inlet and outlet protection, and slope drains.
Where necessary, stabilize streambanks as early as possible. Install principal runoff
conveyance system with runoff-control measures. Install remainder of system after grading.
LANDING CLEARING AND GRADING: Site preparation- cutting, filling
and grading, sediment traps, barriers, diversions, drains, and surface
roughening.
Begin major clearing and grading AFTER principal sediment and key runoff-control measures
are installed. Clear borrow and disposal areas only as needed. Install additional control
measures as grading progresses. Mark trees and buffer areas for preservation.
SURFACE STABILIZATION: Temporary and permanent seeding,
mulching, sodding and riprap.
Apply temporary or permanent stabilization measures immediately on all disturbed areas
where work is delayed or complete.
BUILDING CONSTRUCTION: Buildings, utilities, and paving.Install necessary additional erosion and sedimentation control practices as work takes place.
LANDSCAPE AND FINAL STABILIZATION: Topsoiling, trees and
shrubs, permanent seeding, mulching, sodding, and riprap.
Last construction phase: Stabilize all open areas, including borrow and spoil areas. Remove
and stabilize all temporary control areas.
NOTE: The above are the main aspects of a typical construction sequence in general terms. A detailed Construction Sequence should be site specific based
on your project and site needs. As a minimum, the construction sequence schedule should show the following:
·The erosion and sedimentation control practices to be installed,
·Principal development activities,
·What measures should be in place before other activities are begun, and
·Compatibility with the general construction schedule of the contract.
Many timely construction techniques can reduce the erosion potential of a site, such as (1) shaping earthen fills daily to prevent overflows and (2)
constructing temporary diversions ahead of anticipated storms. These types of activities cannot be put on the construction sequence schedule, but should be
used whenever possible.
DATE:PAGE:
NORTH CAROLINA
Department of Environmental Quality
Effective Date: 9/1/2023
In accordance with the 2013
Design Manual UpdatesCONSTRUCTION SEQUENCING
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
SEDIMENT &
EROSION
CONTROL DETAILS
CE501
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
E
5
0
1
,
5
/
4
/
2
0
2
6
1
:
1
5
:
2
7
P
M
05/04/26
Construction:
1.Clear the entrance and exit area of all vegetation, roots, and other objectionable
material and properly grade it.
2.Place the gravel to the specific grade and dimensions shown on the plans, and
smooth it.
3.Provide drainage to carry water to a sediment trap or other suitable outlet.
4.Use geotextile fabrics in order to improve stability of the foundation in locations
subject to seepage or high water table.
Maintenance:
1.Inspect all measures at least weekly and after each rainfall of 1.0 inch or greater.
Make any required repairs immediately.
2.Maintain the gravel pad in a condition to prevent mud or sediment from leaving the
construction site. This may require periodic topdressing with 2-inch stone.
3.Sediment on roadways is to be removed immediately by broom and shovel, either by
manual or mechanical means, and not to be washed off where it has the potential to
enter a stream, drainage way or storm drain system.
Pub
l
i
c
R
o
a
d
2-3" COURSE AGGREGATE
6" MIN.
AS
R
E
Q
U
I
R
E
D
12'
M
I
N
.
50'
M
I
N
.
IF 5
0
'
C
A
N
N
O
T
B
E
R
E
A
C
H
E
D
,
A
L
E
N
G
T
H
SUF
F
I
C
I
E
N
T
E
N
O
U
G
H
T
O
R
E
T
A
I
N
S
E
D
I
M
E
N
T
O
N
SITE
A
N
D
O
F
F
R
O
A
D
W
A
Y
S
.
DATE:PAGE:
NORTH CAROLINADepartment of Environmental Quality
Effective Date: 9/1/2023
In accordance with the 2013
Design Manual Updates
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT
GEOTEXTILE FABRIC
TO BE USED IN LOCATIONS
SUBJECT TO SEEPAGE OR
HIGH WATER TABLE.
Notes:
1.Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics.
2.Ensure that the height of the sediment fence does not exceed 24 inches above the ground. (Higher fences may
impound volumes of water sufficient to cause failure of the structure)
3.Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are
necessary, securely fasten the filter cloth only at a support post with 4 feet minimum overlap to the next post.
4.Support standard strength filter fabric by wire mesh fastened securely to the upslope side of the posts. Extend the
wire mesh support to the bottom of the trench. Fasten the wire reinforcement, then fabric on the upslope side of the
fence post. Wire or plastic zip ties should have a minimum 50 pound tensile strength.
5.When a wire mesh support fence is used, space posts a maximum of 8 feet apart. Supports should be driven securely
into the ground a minimum of 24 inches. Wire mesh should be a minimum 14-gauge with 6 inch mesh spacing.
6.Extra strength filter fabric with 6 foot post spacing does not require a wire mesh support fence. Securely fasten the
filter fabric directly to posts. Wire or plastic zip ties should have a minimum of 50 pound tensile strength.
7.Excavate the trench approximately 4 inches wide and 8 inches deep along the proposed line of the posts and upslope
from the barrier.
8.Place 12 inches of fabric along the bottom and side of the trench.
9.Backfill the trench with soil placed over the filter fabric and compact. Thorough compaction of the backfill is critical to
silt fence performance.
10.Do not attach filter fabric to existing trees.
11.Do not place across ditches, streams, or any other areas of concentrated flow.
Maintenance:
1.Inspect all measures at least weekly and after each rainfall of 1.0
inch or greater. Make any required repairs immediately.
2.Should the fabric of a sediment fence collapse, tear, decompose,
or become ineffective, replace it promptly.
3.Remove sediment deposits as necessary to provide adequate
storage volume for the next rain and reduce pressure on the
fence. Take care to avoid undermining the fence during cleanouts.
4.Remove all fencing materials and unstable sediment deposits and
bring the area to grade and stabilize it after the contributing
drainage area has been properly stabilized.
STEEL POST
8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE
6' MAX. EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE
18-24"
8" DOWN & 4" FORWARD
ALONG THE TRENCH24"
WIRE FENCE
FILTER FABRIC
PLASTIC OR
WIRE TIES 24"
8" MIN.
4" MIN.
BACKFILL TRENCH
AND COMPACT
THOROUGHLY
UPSLOPE
WIRE FENCE FILTER FABRIC
STEEL POST
PLASTIC OR
WIRE
CROSS SECTION VIEW
Max. Slope Length and Slope for Which
Sediment Fence is Applicable
Slope Slope Length (ft)Max. Area (ft2)
<2%100 10,000
2 to 5%75 7,500
5 to 10%50 5,000
10 to 20%25 2,500
>20%15 1,500
DATE:PAGE:
NORTH CAROLINADepartment of Environmental Quality
Effective Date: 9/1/2023
In accordance with the 2013
Design Manual UpdatesSEDIMENT FENCE
2:1 SLOPE GRAVEL FILTER
CONCRETE BLOCKSDEWATERING
1' MIN.
2' MAX.
TEMPORARY SEDIMENT POOL WIRE SCREEN DEWATERING
DROP INLET
WITH GRATE
NOTES:
1.Lay one block, on each side of the structure, on its
side in the bottom row to allow pool drainage. The
foundation should be excavated at least 2 inches
below the crest of the storm drain. Place the
bottom row of blocks against the edge of the storm
drain for lateral support and to avoid washouts
when overflow occurs. If needed, give lateral
support to subsequent rows by placing 2 inch x 4
inch wood studs through block openings.
2.Carefully fit hardware cloth or comparable wire
mesh with 1/2-inch openings over all block
openings to hold gravel in place.
3.Use clean gravel 1/2 to 3/4 inch in diameter, placed
2 inches below the top of the block on a 2:1 slope
or flatter and smooth it to an even grade. NCDOT
#57 washed stone is recommended.
SEDIMENT
MAINTENANCE:
1.Inspect all measures at least weekly and after every
rainfall of 1.0 inch or greater; repair immediately.
2.Remove sediment as necessary to provide
adequate storage volume for subsequent rains.
3.When the contributing drainage area has been
adequately stabilized, remove all materials and any
unstable soil, and either salvage or dispose of it
properly. Bring the disturbed area to proper grade,
then smooth and compact before stabilizing.
DATE:PAGE:
NORTH CAROLINADepartment of Environmental Quality
Effective Date: 9/1/2023
In accordance with the 2013
Design Manual UpdatesBLOCK AND GRAVEL INLET PROTECTION (TEMPORARY)
2' MIN.
18" MIN.
6' TYPICAL
COMPACTED
SOIL FLOW
9' TYPICAL
18" MIN.
3:
1
M
A
X
COURSE
AGGREGATE
FLOW
TEMPORARY EARTHEN DIVERSION DIKE
TEMPORARY GRAVEL DIVERSION DIKE FOR VEHICLE CROSSING
NOTES:
1.Remove and properly dispose of all tree,
brush, stumps, and other objectionable
material.
2.Temporary diversions are to only be used for
drainage areas of 5 acres or less.
3.Ridges will have a 2 feet minimum top width,
2:1 or flatter side slopes and a minimum of 0.3
feet freeboard.
4.Channels will have a parabolic, trapezoidal, or
V shape with side slopes of 2:1 or flatter.
5.Any point where vehicles will be crossing
should have 3:1 or flatter side slopes.
6.Ensure the top of the dike is not lower at any
point than the design elevation plus the
specified settlement.
7.Provide sufficient room around diversions to
permit machine re-grading and cleanout.
8.Vegetate the ridge immediately after
construction unless it will remain in place less
than 30 working days.
MAINTENANCE:
1.Inspect all measures at least weekly and after
every rainfall of 1.0 inch or greater.
2.Make all repairs immediately.
3.Immediately remove any sediment from the
flow area and repair the diversion ridge.
4.Check outlets and make timely repairs as
needed.
2:1
M
A
X
DATE:PAGE:
NORTH CAROLINADepartment of Environmental Quality
Effective Date: 9/1/2023
In accordance with the 2013
Design Manual UpdatesTEMPORARY DIVERSIONS
Spacing Between Socks / Wattles (Feet)
Channel Slope (%)8-inch Diameter Sock 12-inch Diameter Sock
1 67 100
2 33 50
3 22 33
4 17 25
5 13 20NOTES:
1.Other materials providing equivalent protection against erosive velocities may be substituted for
compost use in silt socks or wattles.
2.Fill silt sock/wattle netting uniformly to the desired length such that logs do not deform.
3.Use 24 inch long wooden stakes with a 2 inch x 2 inch nominal cross section.
4.Install silt sock/wattle(s) to a height on slope so flow will not wash around silt sock/wattle and
scour slopes, or as directed.
5.Install a minimum of two up-slope stakes and four down-slope stakes at an angle to wedge silt
sock/wattle to ground at bottom ditch. Use staples to secure silt sock/wattle to the ground to
prevent undermining.
6.The use of flocculants such as Polyacrylamide (PAM) is recommended. Apply flocculants on top
of sock/wattle and to matting on either side of sock/wattle according to manufacturer
recommended rates. Reapply after each 1.0 inch rainfall.
MAINTENANCE:
1.Inspect all measures weekly and after each rainfall of 1.0 inch or greater. Remove accumulated
sediment and any debris.
2.Silt sock/Wattle(s) must be replaced if clogged or torn.
3.If ponding becomes excessive, the silt sock/wattle may need to be replaced with a larger diameter
or a different measure.
4.Reinstall if damaged or dislodged.
5.Silt socks/Wattles shall be inspected until land disturbance is compete and the area above the
measure is permanently stabilized.
MATTING
STAKES ANGLE STAKES
TO WEDGE WATTLE
ONTO GROUND
DATE:PAGE:
NORTH CAROLINADepartment of Environmental Quality
Effective Date: 9/1/2023
In accordance with the 2013
Design Manual UpdatesSILT SOCK / WATTLE FOR CHECK DAM
TRAPEZOIDAL DITCH SECTION VIEW
MATTING
MIN. 4 STAKES ON DOWNSLOPEMIN. 2 STAKES ON UPSLOPE
V- DITCH SECTION VIEW
MATTING
MIN. 4 STAKES ON DOWNSLOPEMIN. 2 STAKES ON UPSLOPE
MATTING
WA
T
T
L
E
WA
T
T
L
E
MIN. 4 STAKES ON
DOWNSLOPE
MIN. 2 STAKES
ON UPLSOPE
DITCH SLOPE
FLOW FLOW
SILT SOCK/
WATTLE
PLAN VIEW
ISOMETRIC VIEW
MATTING
DOWNSLOPE
TOP OF BANK
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
SEDIMENT &
EROSION
CONTROL DETAILS
CE502
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
TEMPORARY PUMP AROUND
SCALE: NOT TO SCALE1 SEDIMENT BAG
SCALE: NOT TO SCALE2 SILT SACK
SCALE: NOT TO SCALE3
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
E
5
0
2
,
5
/
4
/
2
0
2
6
1
:
1
5
:
3
6
P
M
05/04/26
GRAVEL SHOULDER SECTION
12" COMPACTED SUBGRADE
(98% OF MAXIMUM DRY DENSITY ASTM D-698)
SCALE: NOT TO SCALE2
R=5
4'
-
0
"
1
3
"
18"
12" GRID
20"
2
5
1
/
2
"
12"
10"
1
8
"
5"
5"
5"
CURB LINE OR END
OF PARKING SPACE1"
CENTERLINE OF
PARKING SPACE
ADA PARKING SYMBOL
SCALE: NOT TO SCALE6
1'-0''
6'-0''
4"
6"
1'-0''
FORMED HOLE FOR #4
REINFORCING BAR 2' MIN. LENGTH
(TYP. EA. PARKING CHOCK) DRIVE
REBAR FLUSH WITH TOP OF CHOCK.
STANDARD PRECAST CONCRETE
PARKING CHOCK
PRECAST WHEEL STOP
SCALE: NOT TO SCALE4
2'-
6
"
FR
O
M
E
D
G
E
O
F
PA
R
K
I
N
G
S
P
A
C
E
6" CRUSHED AGGREGATE
BASE COURSE (P-209)
CONCRETE PAVEMENT SECTION
9.5" P-501 CONCRETE
PAVEMENT
12" COMPACTED SUBGRADE
(98% OF MAXIMUM DRY DENSITY ASTM D-698)
SCALE: NOT TO SCALE1
SIGN INSTALLATION
SCALE: NOT TO SCALE5
WHITE BORDER
10" WHITE LETTERING
RED BACKGROUND
NOTE:
MOUNT SIGN ON BREAK-AWAY SIGN POST. SEE
DETAIL A1, THIS SHEET.
1-3/4" X 1-3/4" 12 GAUGE
POST
3/8"RIVET (TYP)
2-1/4" ANCHOR SLEEVE
EXISTING
GROUND
2-1/4"X 2-1/4" 12 GAUGE SLEEVE
2" X 2" 12 GAUGE POST
NOTES:
1.STRUCTURAL STEEL TUBING USED FOR POST & SLEEVES MUST BE GALVANIZED 12 GAUGE COLD ROLLED STEEL, OF THE
NOMINAL DIMENSIONS SHOWN HERON AND MEET THE REQUIREMENTS OF ASTM A446 GRADE A.
2.GALVANIZING MUST BE PER ASTM A525. POSTS & SLEEVES MUST HAVE 7/16" DIA. HOLES SPACED 1" OC ±1/8" AND MUST
HAVE NO MORE VARIATION IN STRAIGHTNESS THAN 1/6" IN 3'. POSTS MUST BE SQUARE WITHIN ±0.014", HAVE TWIST NO
GREATER THAN 0.062" IN 3' AND HAVE CORNER RADII OF 5/32" ±1/64".
3.THE SIGNS MUST BE MOUNTED ON POSTS IN ACCORDANCE WITH NCDOT STANDARD SPECIFICATIONS DIVISION 900. ALL
FASTENING HARDWARE IS TO BE PROVIDED BY THE CONTRACTOR.
4.MAXIMUM SIGN SIZE 5.2 SQ. FT.RIVET SPECIFICATION:
DIMENSION: 3/8" DIA SHANK, 7/8" DIA HEAD
GRIP RANGE: .200-.366
FINISH: ELECTRO-GALVANIZED, ASTM-B-633, TYPE III SCI
6" AGGREGATE BASE COURSE
(NCDOT SPECIFICATION)
6" AGGREGATE BASE COURSE
(NCDOT SPECIFICATION)
ASPHALT PAVEMENT SECTION
2" SF9.5C SUPERPAVE HOT MIX ASPHALT
SURFACE COURSE (NCDOT SPECIFICATION)
12" COMPACTED SUBGRADE
(98% OF MAXIMUM DRY DENSITY ASTM D-698)
SCALE: NOT TO SCALE3
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
SITE DETAILS
CS501
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
S
5
0
1
,
5
/
4
/
2
0
2
6
1
:
1
5
:
3
2
P
M
05/04/26
NOT TO SCALE
8' CHAIN LINK FENCE DETAIL
NOTES FOR 8' FENCE AND GATES:
1.MISCELLANEOUS ITEMS, SUCH AS BOLTS, NUTS AND WASHERS SHALL BE GALVANIZED STEELE OR ALUMINUM ALLOY AT THE
MANUFACTURER'S OPTION.
2.BRACE BANDS SHALL BE USED TO SECURE TOP RAIL AND BRACE ENDS TO TERMINAL POSTS. WHEN TENSION BARS ARE USED, TENSION
BANDS SHALL BE USED FOR SECURING CHAIN-LINK FABRIC AT EACH TERMINAL POST. SPACING OF TENSION BANDS ON POSTS SHALL BE
AT 15 INCH INTERVALS OR LESS. BRACE AND TENSION BANDS SHALL BE STEEL AND SHALL BE 34 INCH WIDE BY 110 INCH THICK NOMINAL.
3.TENSION BARS FOR 2 INCH MESH SHALL BE NO LESS THAN 316 BY 34 INCH OR EQUIVALENT CROSS-SECTIONAL AREA. A TENSION BAR
SHALL BE PROVIDED WHERE CHAIN-LINK FABRIC MEETS TERMINAL POSTS. TENSION BAR SHALL BE STEEL, OF A CONTINUAL LENGTH
COMPATIBLE WITH THE HEIGHT OF THE FENCE AND SHALL BE THREADED THROUGH THE FABRIC AND ATTACHED TO THE POSTS BY
TENSION BANDS. ROLL FORMED POSTS WITH INTEGRAL LOOPS FOR WEAVING FABRIC TO POSTS ARE ACCEPTABLE IN LIEU OF TENSION
BARS.
4.ALL EXPOSED ENDS OF TUBULAR POSTS SHALL BE FITTED WITH CAPS. THE CAP SHALL FIT SNUGLY OVER THE POSTS AND EXCLUDE,
MOISTURE SUCH AS RAIN. WHEN TOP RAIL IS PROVIDED THE CAPS SHALL HAVE A RING OR HOLE SUITABLE FOR THE THROUGH PASSAGE
OF THE TOP RAIL CAPS SHALL BE PRESSED STEEL, MALLEABLE CASTING, OR ALUMINUM ALLOY IN ACCORDANCE WITH ASTM F626.
5.ENDS OF TOP RAIL AND BRACED SHALL BE PROVIDED WHEN TOP RAIL OR BRACES ARE REQUIRED. TOP RAIL AND BRACE ENDS SHALL BE
PRESS STEEL, MALLEABLE CASTING, OR ALUMINUM ALLOY IN ACCORDANCE WITH ASTM F626.
6.TOP RAIL SLEEVES SHALL ALLOW FOR EXPANSION AND CONTRACTION OF THE TOP RAIL. TOP RAIL SLEEVES SHALL HAVE A MINIMUM
LENGTH OF 6 INCHES AND BE OF THE SAME MATERIAL AS THE TOP RAIL. TOP RAILS PROVIDED WITH 3 INCH SWAGE ENDS ARE
ACCEPTABLE IN LIEU OF TOP RAIL SLEEVES.
7.WIRE TIES OR CLIPS SHALL BE PROVIDED FOR ATTACHING FABRIC TO LINE POSTS, TOP RAIL, OR TENSION WIRE. WIRE TIES AND CLIPS
SHALL BE AT INTERVALS NOT GREATER THAN 15 INCHES WHEN ATTACHING FABRIC OR LINE POSTS, AND THE SPACE INTERVAL SHALL
NOT EXCEED 24 INCHES WHEN ATTACHING FABRIC TO TOP RAILS OR TENSION WIRE.
8.TOP RAIL LENGTHS SHALL BE FITTED WITH 6 INCH CONNECTORS OF THE SAME MATERIAL AS THE RAIL OR SHALL HAVE A 3 INCH LONG
SWAGE ON ONE END FOR CONNECTING INTO A CONTINUOUS RUN. SUITABLE FITTINGS SHALL BE PROVIDED FOR SECURING TOP RAIL TO
EACH GATE, CORNER AND END POSTS.
9.BRACES SHALL BE PROVIDED FOR GATE POSTS AND EACH TERMINAL POST WHEN A TOP RAIL IS NOT USED. WHEN FABRIC HEIGHT IS 6
FEET OR GREATER. BRACES SHALL BE FURNISHED WITH OR WITHOUT TOP RAIL. BRACES EXTENDING TO LINE POST SHALL BE
CONNECTED BACK TO THE BASE OF THE BRACE POST BY A 516 INCH MINIMUM OUTSIDE DIAMETER TRUSS ROD AND TIGHTENER.
10.LINE POSTS AND BRACE POSTS SHALL BE ZINC-GALV. COATED, 2.375 INCH (O.D.) PIPE 0.130 INCH MINIMUM WALL THICKNESS IN
CONFORMANCE WITH FED. SPEC. RR-F-191/3, GALV. CORNER POSTS TO BE 2.875 INCH O.D. PIPE, 0.160 INCH MINIMUM WALL THICKNESS.
11.TIE WIRE: 0.144 INCH DIAMETER FOR ATTACHING FABRIC TO TOP RAIL AND TO INTERMEDIATE POSTS. PREFORMED CLIPS OF 6 GAGE,
ZINC-COATED, STEEL WIRE MAY BE USED FOR ATTACHING FABRIC TO INTERMEDIATE POSTS.
12.LINE POSTS, RAILS AND BRACES SHALL BE GALVANIZED STEEL PIPE CONFORMING TO ASTM F 1083.
13.FENCING WIRE SHALL BE 7 GAUGE MARCELLED STEEL WITH SAME COATING AS FABRIC AND SHALL CONFORM TO ASTM A 824.
14.BRACE POSTS SHALL BE INSTALLED EVERY 500' MAXIMUM. WHERE BEND IN FENCE LINE IS GREATER THAT 15 DEGREES, BRACE POST
SHALL BE INSTALLED.
15.SOIL EXCAVATED FOR HT FENCE POSTS SHALL BE SPREAD FLAT BY RAKE ACROSS THE GROUND. ROCKS SHALL BE RAKED OUT AND
REMOVE.
16.BARBED WIRE ARM SHALL BE INSTALLED AT AN ANGLE OF 45 +/- 5 DEGREES FROM THE PLANE OF THE FENCE AND THE OUTER STRAND
OF BARBED WIRE SHALL BE POSITIONS 12 +/- 2 INCHES HORIZONTALLY FROM THE FENCE LINE. FOR OTHER BARBED WIRE SPECIFICATION
REFER TO FEDERAL SPECIFICATION RR-F-191/4.
FENCE POST
FENCE AND GATE GROUNDING DETAIL
GROUNDING NOTES:
1.FOR FENCES WITH METALLIC POSTS SET IN CONCRETE. THE
GROUNDING SHALL BE ACCOMPLISHED BY6 USING A 58" MINIMUM
DIAMETER GALVANIZED COPPERCLAD GROUND ROD DRIVEN
INTO THE GROUND A MINIMUM OF 8 FEET . THE THE GROUND
ROD SHALL BE SO LOCATED AND DRIVEN THAT IT SHALL BE
AGAINST THE FENCE IN ITS FINAL POSITION. THE LENGTH OF
THE ROD SHALL BE SUCH THAT WHEN IT S DRIVEN INTO THE
GROUND THE SPECIFIED DEPTH, THE TOP OF THE ROD SHALL
BE AT THE SAME HEIGHT AS THE FENCE. THE ROD SHALL BE
TIGHTLY FASTENED WITH NUMBER 2 GALVANIZED IRON WIRE TO
EACH STRAND OF A BARBED WIRE FENCE AND AT THE TOP,
CENTER,A ND BOTTOM POINTS OF A WOVEN WIRE OF A CHAIN
LINK FENCE.
2.ONE GROUNDING ROD IS REQUIRED FOR EACH 500 LINEAR FEET
OF FENCE, OR FRACTION THEREOF, SECTION OF FENCE,
REGARDLESS OF LENGTH, ISOLATED BY GATES, GAP AT SPICES,
OR PLASTIC CONNECTORS, SHALL BE GROUNDED
INDEPENDENTLY.
GROUNDING CLAMP
JUMPER TO
GROUND LOOP
NOT TO SCALE
NOT TO SCALE
0.
5
"
M
I
N
C
R
O
W
N
18
"
N
O
M
.
3,000 PSI CONCRETE
FENCE POST & FOUNDATION
BEYOND
INSTALL 3.5' O.C. (MAX)
1 EA. 1/4" - 20 X 4" FORGED
EYEBOLT GALV.
1 EA. 1/4" X 1 1/4" FENDER
WASHER GALV. 2
EA 1/4" - 20 HEX NUTS GALV.
LIMITS OF GRASSING
18" NOM. TYPICAL
12" TYP.
INSTALL FENCE FABRIC FLUSH
WITH FINISHED CONCRETE
MOW STRIP. HOG RING FENCE
FABRIC TO EYEBOLTS
EXISTING GROUND
3.5" (TYP.)
NEW FENCE
UNRESTRICTED RESTRICTED
NOT TO SCALE
MOW STRIP / INTRUSION BARRIER
NOTE: MOW STRIP IS REQUIRED FOR ALL NEW CHAIN LINK FENCE.
COST SHALL BE INCLUDED IN THE UNIT COST PER LINEAR FOOT
OF FENCE CONSTRUCTED.
NOTE: ALL GATES, GATE EQUIPMENT,
AND APPURTENANCES ARE TO
MATCH EXISTING GATES, GATE
EQUIPMENT, AND APPURTENANCES
IN PLACE ON THE GSP CAMPUS.
4" MAX.
10'-0" MAXIMUM-8' FENCE
6"
8'-
0
"
2" MIN.
BOTTOM
TENSION WIRE
ATTACH FENCE FABRIC TO TENSION
WIRE WITH HOG-RINGS APPROX. 24" O.C.
BARBED WIRE W/12-1/2 GA. LINE WIRES & 14 GA. 4-POINT BARBS
SPACED 3" O.C. AT 5" MAX CENTERS
EXTENSION ARMS TO BE PLACED ON
THE OPPOSITE SIDE OF THE AREA TO
BE PROTECTED
END, CORNER OR PULL POST
@ 500' MAX. SPACING 2 1/2"
I.D.
MIDDLE RAIL
SUPPORT
3/8" Ø GALV. TRUSS ROD WITH
TURNBUCKLE INSTALLED ON INSIDE OF
FENCE
P-610 CONCRETE
ANCHOR
TOP RAIL 1-5/8" O.D. STD. WEIGHT
PIPE TOP RAIL
LINE POST 2" I.D.
9 GAUGE GALV. FABRIC
(2" MESH)
2" CROWN
NOTES:
1.ALL FABRIC SHALL BE #9 GA-2" MESH WITH TWISTED
END SELVAGES ON TOP AND KNUCKLED END
SELVAGES ON BOTTOM
2.ALL FENCING AND GATES SHALL BE BLACK VINYL
COATED.
3.FENCE EYELET RINGS TO BE 516"
4.LINE AND BRACE FENCE POSTS SHALL BE 2.375" OD
MIN. CORNER AND END POSTS SHALL BE 2.875" OD.
MIN GATE POSTS SHALL BE 4" O.D. MIN.
5.2. MIDDLE RAIL SUPPORTS ARE REQUIRED AT
FNECE CORNERS AND TERMINAL POSTS. POSTS TO
BE USED AS PULL SUPPORTS FOR INSTALLING AND
TENSIONING FENCE FABRIC ARE CONSIDERED
TERMINAL POSTS.
45° CORNER EXTENSION
ARM OUTBOARD
45° LINE POST EXTENSION
ARM OUTBOARD
BARBED WIRE W/12-1/2 GA. LINE WIRES
& 14 GA. 4-POINT BARBS SPACED 3" O.C.
DOME CAP AT GATE POSTS
1-5/8" TOP RAIL END CUP OFFSET
1-5/8" TOP RAIL END CUP
3/8" TRUSS ROD (INSTALLED
ON INSIDE OF FENCE)
1-5/8" TOP RAIL END CUP OFFSET
1-5/8" STD. WEIGHT PIPE RAIL
9 GA. TIE WIRE @ 24" O.C. MAX.TOP OR BRACE RAIL BAND
CHAIN LINK FABRIC
3/16" x 3/4" TENSION BAR
TENSION BAR BAND @ 15" O.C. MAX.
5/16" x 1-1/2" CARRIAGE BOLT
2.875" O.D. END OR GATE POST WITH TOP CAP (TYP.)
SIDE ELEVATION
TOP VIEW
3/16" x 3/4" TENSION BAR
TENSION BAR BAND @ 15" O.C. MAX.
5/16" x 1-1/2" CARRIAGE BOLT
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
TRUSS CONNECTOR
2.5" O.D. LINE POST
BRACE RAIL BAND
TURNBUCKLE
3/16" x 3/4" TENSION BAR
2.875" O.D. END OR GATE POST
TENSION BAR BAND @ 15" O.C. MAX.
FENCE POST DETAILS
1-5/8" O.D. CONTINUOUS
TOP RAIL
CORNER OR TERMINAL POST
SHALL BE 16" DIA. MIN.
1'-
0
"
3'-
0
"
M
I
N
.
EM
B
E
D
M
E
N
T
COPPER CLAD GROUND ROD SHALL BE 5/8" IN DIA. AND 8' LONG
WITH A NO. 6 SOLID COPPER CONDUCTOR TIED TO GROUND ROD,
TIED TO TOP RAIL, AND EACH STRAND OF BARBERD WIRE. EACH
ELEMENT OF FENCE TO BE GROUNDED. INSTALLATION OF
GROUND RODS IS INCIDENTAL TO COST FOR FENCE INSTALLATION.
GROUND RODS TO BE INSTALLED AT MAXIMUM 500' INTERVALS
LINE POST
SHALL BE 12" DIA. MIN.
1-5/8" O.D. PIPE (TYP.
TOP AND BOTTOM)
.375" ROUND ROD (TYP.)
METAL GATE POST (TYP.)
CHAIN LINK
CHAIN
LINK
CHAIN
LINK
8'
-
0
"
12"
4' MAX.
12"
BARBED WIRE W/12-1/2 GA. LINE WIRES
& 14 GA. 4-POINT BARBS SPACED 3" O.C.
TE
N
S
I
O
N
B
A
N
D
S
@
1
5
"
O
.
C
.
M
A
X
.
COPPER CLAD
GROUND ROD SHALL
BE 5/8" IN DIA. AND 8'
LONG WITH A NO. 6
SOLID COPPER
CONDUCTOR TIED
TO GROUND ROD
6"
3'
-
0
"
M
I
N
.
EM
B
E
D
M
E
N
T
6"
1'
-
0
"
NOT TO SCALE
4' WIDE PEDESTRIAN GATE
6"
FENCE DETAILS
SCALE: NOT TO SCALE1
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
SITE DETAILS
CS502
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
S
5
0
2
,
5
/
4
/
2
0
2
6
1
:
1
5
:
5
8
P
M
05/04/26
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
STORM DRAINAGE
DETAILS
CG501
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
G
5
0
1
,
5
/
4
/
2
0
2
6
1
:
1
6
:
0
5
P
M
05/04/26
DITCH SECTION
NOT TO SCALE
1
PERMANENT
STABILIZATION (SEEDING)
ROLLED EROSION CONTROL
PRODUCT (CURLEX I OR
APPROVED EQUAL)
EXISTING
SUBGRADE
3' BOTTOM
WIDTH
3:1 SIDE
SLOPE
3:1 SIDE
SLOPE
MIN. 36"
Size of Riprap stones
Weight
(lb)
Mean Spherical
Diameter (ft)
Length
(ft)
Rectangular Shape
Width/Height (ft)
50 0.8 1.4 0.5
100 1.1 1.8 0.6
150 1.3 2.0 0.7
300 1.6 2.6 0.9
500 1.9 3.0 1.0
1000 2.2 3.7 1.3
1500 2.6 4.7 1.5
2000 2.8 5.4 1.8
4000 3.6 6.0 2.0
6000 4.0 6.9 2.3
8000 4.5 7.6 2.5
20,000 6.1 10.0 3.3
Sizes for Riprap and Erosion Control Stone
Specified by NCDOT
Riprap Erosion Control
Class 1 Class 2 Class A Class B
5-200 lb 25-250 lb 2"-6"5"-15"
30% shall weigh
a minimum of 60
lbs each
60% shall weigh
a minimum of 100
lbs each
No more than
10% shall weigh
less than 15 lbs
each
No more than 5%
shall weigh less
than 50 lbs each
10% tolerance
top and bottom
sizes
Equally
distributed, no
gradation
specified
Equally
distributed, no
gradation
specified
Riprap should be a well-graded mixture with 50% by weight
larger than the specified design size.
Diameter of the largest stone size in the mix should be 1.5
times the d50 size with smaller sizes grading down to 1 inch.
Synthetic Filter Fabric:
1.Place the cloth filter directly on the prepared foundation.
2.Overlap the edges by at least 12 inches, and space
anchor pins every 3 feet along the overlap.
3.Bury the upstream end of the cloth a minimum of 12
inches below ground and bury the lower end of the cloth
or over lap with the next section as required.
4.If damage occurs while placing riprap, remove the riprap,
and repair the sheet by adding another layer of filter
material with a minimum overlap of 12 inches around the
damaged area. If damage is extensive, remove and
replace the entire sheet.
5.If placing large stones or machine placing is difficult, a 4
inch layer of fine gravel or sand may be needed to
protect the filter cloth.
6" GRAVEL FILTER
(OR FILTER CLOTH)T min.
1.5 T min.
DATE:PAGE:
NORTH CAROLINADepartment of Environmental Quality
Effective Date: 9/1/2023
In accordance with the 2013
Design Manual UpdatesRIP RAP
Subgrade Preparation:
1.Prepare the subgrade for riprap and filter to the required
lines and grades shown on the plans.
2.Compact any fill required in the subgrade to a density
approximating that of the surrounding undisturbed
material or overfill depressions with riprap.
3.Remove brush, trees, stumps, and other objectionable
material.
Sand and Gravel Filter Blanket:
1.Place the filter blanket immediately after the ground
foundation is prepared.
2.When using gravel, spread filter stone in a uniform
layer to the specified depth.
3.When more than one layer of filter material is used,
spread the layers with minimal mixing.
Maintenance:
In general, once a riprap installation has been properly designed
and installed it requires very little maintenance. Riprap should
be inspected periodically for scour or dislodged stones. Control
of weed and brush growth may be needed in some locations.
Stone Placement:
1.Placement of riprap should follow immediately after placement of the filter.
2.Place so that riprap forms a dense, well-graded mass of stone with a minimum of voids.
3.Place to its full thickness in one operation.
4.Do not place by dumping through chutes or other methods that cause segregation of stone sizes.
5.Take care not to dislodge underlying base or filter when placing stone.
6.The toe of the riprap slope should be keyed to a stable foundation at its base.
7.The toe should be excavated to a depth about 1.5 times the design thickness of the riprap and
extend horizontally from the slope, as shown above.
8.Hand placing may be necessary to achieve the proper distribution of stone sizes to produce a
relatively smooth, uniform surface.
T
NOTES:
1.Lime, fertilize and seed before installation. Planting of shrubs, trees, etc. should occur after installation.
2.Slope surface shall be smooth before placement for proper soil contact.
3.Design velocities exceeding 2 feet/second require temporary blankets, mats or similar liners to protect seed and soil until vegetation becomes
established.
4.Terminal anchor trenches are required at RECP ends and intermittent check slots must be constructed across channels at 25 foot intervals.
5.Terminal anchor trenches should be a minimum of 12 inches in depth and 6 inches in width. Intermittent check slots should be 6 inches deep
and 6 inches wide.
6.For installation on a slope, place RECP 2-3 feet over the top of the slope and into an excavated end trench measuring approximately 12
inches deep by 6 inches wide. Pin the RECP at 1 foot intervals along the bottom of the trench, backfill and compact. Unroll the RECP down
the slope maintaining direct contact between the soil and RECP. Secure using staples or pins in a 3 foot center-to-center pattern.
7.11 gauge, at least 6 inch by 1 inch staples or 12 inch minimum length wooden stakes are recommended for anchoring.
8.Grass-lined channels with design velocities exceeding 6 feet/second should include turf reinforcement mats
9.Check slots to be constructed per manufacturers specifications.
10.Staking or stapling layout per manufacturers specification.
11.If there is a berm at the top of slope, anchor up-slope of the berm.
12.Do not stretch blankets/matting tight, allow the rolls to conform to any irregularities.
13.For slopes less than 3H:1V, rolls may be placed in horizontal strips.
MAINTENANCE:
1.Inspect Rolled Erosion Control Products at least weekly and
after each rainfall of 1.0 inch or greater; repair immediately.
2.Good contact with the ground must be maintained, and
erosion must not occur beneath the RECP.
3.Any areas of the RECP that are damaged or not in close
contact with the ground shall be repaired and stapled.
4.If erosion occurs due to poorly controlled drainage, the
problem shall be fixed and the eroded area protected.
5.Monitor and repair the RECP as necessary until ground cover
is established.
OVERLAP
6" MIN.LONGITUDINAL
ANCHOR TRENCH
OVERCUT CHANNEL 2"
TO ALLOW BULKING
DURING SEEDBED
PREPARATION
DESIGN DEPTH
6" MIN.
6" MIN.
TYPICAL INSTALLATION
WITH EROSION CONTROL
BLANKETS OR TURF
REINFORCEMENT MATS
INTERMITTENT CHECK SLOT LONGITUDINAL ANCHOR TRENCH
SINGLE-LAP SPLICED ENDS OR BEGIN NEW
ROLL IN AN INTERMITTENT CHECK SLOT
FLOWPREPARE SOIL AND APPLY SEED BEFORE
INSTALLING BLANKETS, MATS OR OTHER
TEMPORARY CHANNEL LINER SYSTEMS
6" MIN.
OVERLAP
ANCHOR 6"X6" MIN. TRENCH
AND STAPLE AT 12"
INTERVALS
STAPLE OVERLAPS
MAX. 5" SPACING
3" MIN.
OVERLAP
BRING MATERIAL DOWN TO A LEVEL
AREA, TURN THE END UNDER 4"
AND STAPLE AT 12" INTERVALS.
CHECK SLOTS AT
25' INTERVALS
CHA
N
N
E
L
BOT
T
O
M
STAKES AT 3'-5'
INTERVALS
INITIAL CHANNEL ANCHOR TRENCH
12"
TERMINAL SLOPE AND CHANNEL
ANCHOR TRENCH
DATE:PAGE:
NORTH CAROLINADepartment of Environmental Quality
Effective Date: 9/1/2023
In accordance with the 2013
Design Manual UpdatesROLLED EROSION CONTROL PRODUCTS
FILTER
BLANKET
d
SECTION AA
La
AAAA
d
La
FILTER
BLANKET
PLAN
SECTION A
PLAN
AA
d0
3d0
PIPE OUTLET TO WELL-DEFINED CHANNEL
PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL
NOTES:
1.Compact any fill required in the subgrade to the density
of the surrounding undisturbed material. Low areas in
the subgrade on undisturbed soil may also be filled by
increasing the riprap thickness.
2.The riprap and gravel filter must conform to the specified
grading limits shown on the plans.
3.Filter cloth, when used, must meet design requirements,
and be properly protected from punching or tearing
during installation. Repair any damage by removing the
riprap and placing another piece over the damaged area.
If the damage is extensive, replace the entire filter cloth.
4.All connecting joints should overlap so the top layer is
above the downstream layer a minimum of 1 foot.
5.The minimum thickness of the riprap should be 1.5 times
the maximum stone diameter but not less than 6".
6.Riprap may be field stone or rough quarry stone. It
should be hard, angular highly weather-resistant and well
graded.
7.Construct the apron on zero grade with no overfill at the
end. Make the top of the riprap at the downstream end
level with the receiving area or slightly below it.
8.Ensure that the apron is properly aligned with the
receiving stream and preferably straight throughout its
length. If a curve is needed, place in the upper section of
the apron.
MAINTENANCE:
1.Inspect outlet structures at least weekly and after
each rainfall of 1.0 inch or greater.
2.Check outlets for erosion around or below riprap
and for if stones have been dislodged. Make
repairs immediately to prevent further damage.
La = Length of Riprap Apron
d = Thickness of Riprap Apron
La = Length of Riprap Apron
d = Thickness of Riprap Apron
DATE:PAGE:
NORTH CAROLINADepartment of Environmental Quality
Effective Date: 9/1/2023
In accordance with the 2013
Design Manual UpdatesOUTLET STABILIZATION STRUCTURE
NOTE:
INJECTION MOLDED FITTING ARE AVAILABLE
IN TEES, WYES, REDUCERS, 45° BENDS AND
BELL/BELL COUPLERS.
WATERTIGHT (WT) JOINTS SHOWN. SOIL-TIGHT (ST)
FITTINGS ARE ALSO AVAILABLE.
NYLOPLAST CLEANOUT END CAP
ADJUST GRADE PER ENGINEERS
PLAN
INJECTION MOLDED
WT TEE
INSERT INJECTION MOLDED,
GASKETED SPIGOT BY
BELL REDUCER
INJECTION
MOLDED WT TEE
HDPE PIPE (TYP)
GASKETED
CONNECTION
INJECTION
MOLDED WT
90° BEND
DOWNSPOUT ADAPTER
INSERTED IN RISER
PIPE
BUILDING
WALL
FINISHED GRADE
TEE TO
HDPE
ROOF DRAIN COLLECTION
NOT TO SCALE2
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
STORM DRAINAGE
DETAILS
CG502
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
TRENCH DRAIN
NOT TO SCALE
3
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
G
5
0
2
,
5
/
4
/
2
0
2
6
1
:
1
5
:
5
1
P
M
05/04/26
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
UTILITY DETAILS
CU501
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
U
5
0
1
,
5
/
4
/
2
0
2
6
1
:
1
5
:
4
1
P
M
05/04/26
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
UTILITY DETAILS
CU502
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
U
5
0
2
,
5
/
4
/
2
0
2
6
1
:
1
5
:
5
7
P
M
05/04/26
ENGINEER
PROJECT OWNER
STAMP
CHECKED BY
PRINCIPAL IN CHARGE
REVISIONS
ISSUE FOR
ISSUE DATE
PROJECT ADDRESS
PROJECT NUMBER
SHEET TITLE
SHEET NUMBER
www.rivervieweng.com
4904 PARK AVENUE
WILMINGTON, NC 28403
(910) 398-2882
nlauretta@rivervieweng.com
DRAWN BY
IL
M
H
A
N
G
E
R
CO
M
P
L
E
X
UTILITY DETAILS
CU503
FINAL DRAWINGS - NOT RELEASED FOR CONSTRUCTION
1051.01
WILMINGTON
INTERNATIONAL AIRPORT
(ILM)
REVIEW - NOT FOR CONSTRUCTION
MAY 4, 2026
N. LAURETTA, PE, LEED AP
NJL
MO
N
T
E
I
T
H
C
O
N
S
T
R
U
C
T
I
O
N
20
8
P
R
I
N
C
E
S
S
S
T
R
E
E
T
WI
L
M
I
N
G
T
O
N
,
N
C
2
8
4
0
1
JAT / NJL
PUMP STATION DESIGN
PS #1
TOP ELEVATION 26.80
INFLUENT PIPE INVERT 22.30
HIGH WATER ALARM 20.30
START LEAD PUMP 18.77
START LAG PUMP 18.27
PUMP OFF 17.77
BOTTOM OF WETWELL 16.94
WETWELL DIAMETER 4'-0"
PUMP MAKE BARNES
PUMP MODEL ZOGP
VOLTAGE 208 - 240 V
PHASE 1 / 60 HZ
HORSEPOWER 2 HP
RPM 3450
DISCHARGE FLOW RATE AND HEAD 23 GPM @ 107 TDH
C:
\
U
s
e
r
s
\
N
i
c
k
L
a
u
r
e
t
t
a
\
R
i
v
e
r
v
i
e
w
e
n
g
D
r
o
p
b
o
x
\
R
i
v
e
r
v
i
e
w
E
n
g
i
n
e
e
r
i
n
g
\
1
0
5
1
.
0
1
P
r
o
x
H
a
n
g
a
r
C
o
m
p
l
e
x
\
0
4
.
C
A
D
\
1
0
5
1
.
0
1
_
P
r
o
x
H
a
n
g
e
r
_
S
p
.
d
w
g
,
C
U
5
0
3
,
5
/
4
/
2
0
2
6
1
:
1
5
:
4
9
P
M
05/04/26