2-2013-FEB 2013 TRC REPORTTechnical Review Committee Report: February 2013 The County’s Technical Review Committee met once in February. One performance residential project was reviewed. Deer Crossing: Phase 2 Deer Crossing is located near the 6500 block of Myrtle Grove Road, west side and is classified as Watershed Resource Protection on the County’s 2006 Land Use Plan. The developer for the project submitted a site plan proposing 20 additional residential lots with a private street and public water and sewer. In a vote of 5-0, the TRC approved the second phase of the project for 20 lots as displayed on the site plan (attached). Conditions were attached to the approval of the plan and included: ‐ A revised NCDOT Driveway Permit; ‐ A five foot sidewalk along one side of Oak Haven Drive; ‐ A note be added to the plan that no gates, obstructions, or on-site street parking be allowed; ‐ That road inter-connectivity be required once phase 3 is formally submitted for preliminary site plan review; and ‐ That a note be added to the site plan pertaining to the status of wetlands within phase 2. The next regularly scheduled TRC meeting will be March 13th. Two items may be scheduled at that time.