Loading...
08232017 August 23 2017 TRC Agenda PackagePage 1 of 2 TECHNICAL REVIEW COMMITTEE AGENDA AUGUST 23, 2017 New Hanover County’s Technical Review Committee (TRC) will meet Wednesday, August 23, 2017 at 2:00 p.m. in Conference Room 119 (behind the Aquarium), in the New Hanover County Government Center, 230 Government Center Drive, Wilmington, NC to review the following projects:  St. George – 42 residential lots, 18.25 acres (8900 block Stephens Church Road, Kirkland Community)  Pepper Hill – 28 residential lots, 11.28 acres (6000 block Myrtle Grove Road) 2:00 p.m. Item 1: St. George (Performance Plan) – Request by Paramount Engineering for Eston Brinkley for TRC to consider preliminary site plan approval of a 42 lot division with a private road network located near the 8900 block of Stephens Church Road, Kirkland Community. St. George Division History None St. George Site Plan Data o Zoning District: R-15 Residential (2.5 units per acre) o Water Service: Public (CFPUA) o Sewer Service: Public (but Privately Maintained by HOA) o Transportation Impact Analysis: Not warranted o Conservation Resources: None o Comp Future Land Use: Community Mixed Use o School Districts: Castle Hayne & Eaton Elem. (over capacity) Holly Shelter Middle Laney High (over capacity) Planning Staff Observations o Comply with local, State, & Federal mandates as applicable 2:20 p.m. Item 2: Pepper Hill (Performance Plan) – Request by McKim & Creed for Pulte Home Company, LLC for TRC to consider preliminary site plan approval of a 28 lot division with a private road located near the 6000 block of Myrtle Grove Road, west side. Pepper Hill Division History None Pepper Hill Site Plan Data o Zoning District: R-15 Residential (2.5 units per acre) o Water Service: Public (CFPUA) o Sewer Service: Public (CFPUA) o Transportation Impact Analysis: Not warranted o Conservation Resources: None o Comp Plan Future Land Use: General Residential o Schools Districts: Bellamy, CREC, Codington Elem. (over capacity) Murray Middle (over capacity) Ashley High (over capacity) Page 2 of 2 Planning Staff Observations o New subdivision & street name [(Article 4, Section 41-1(8)] o Street cul-de-sac exceeds 500’ length [(Article 4, Section 41-1(h)] -waiver o Road inter-connectivity not met [(Article 4, Section 41-1 (7)(f)]- waiver o Multi-Use path along Myrtle Grove project frontage (Greenway Plan) o Comply with local, State, & Federal mandates as applicable PULTE HOME COMPANY, LLC 4000 FABER PLACE DRIVE, SUITE 110 NORTH CHARLESTON, SC 29405 6" CABC MIN. 12" COMPACTED SUBGRADE PER SPECIFICATIONS 1.5" SF9.5B SURFACE COURSE 1.5" TYPE I-19B INTERMEDIATE COURSE      GENERAL NOTES: 1.PROJECT BOUNDARY DOES NOT CONTAIN ANY CAMA AREAS, 100-YR FLOODPLAIN, CONSERVATION OVERLAY DISTRICTS, AND PROJECT DISCHARGES OUTSIDE THE 575' HQW WATERSHED. 2.PHASE 2 CONSTRUCTION (LOTS #25-28) ONLY TO BEGIN UNTIL UPGRADES AT THE LODER AVENUE PUMP STATION HAVE BEEN COMPLETED AND APPROVED BY CFPUA. 3.STREET LIGHTS TO BE DESIGNED BY DUKE ENERGY AND CONSTRUCTED AS PART OF PHASE 1.