Loading...
TRC Agenda Packet 7.7.21TECHNICAL REVIEW COMMITTEE AGENDA July 7, 2021 New Hanover County’s Technical Review Committee (TRC) will meet Wednesday, July 7, 2021 at 2:00 p.m. at 230 Government Center Drive, Suite 110, to discuss the below items. PLEASE NOTE: This meeting will be conducted remotely via teleconference. Interested parties can contact the Planning and Land Use Department at 910-798-7165 for more information. 2:00 p.m. Item 1: Porch Concepts – Major Site Plan Request by Paul Maki, Maki Holdings LLC for an 21,000 square foot Retail/warehouse facility. The subject property is located at 7036 and 7038 Market Street. It consists of 2.22 acres and is zoned (CZD) CB. 2:20 p.m. Item 1: Goldenberg Office – Major Site Plan Request by McKim and Creed, Inc. for an 15,040 square foot Office building facility. The subject property is located at 6005 and 6007 Market Street. It consists of 5.98 acres and is zoned I-1. Future Items: • 8130 Market Street - GoDog Pet Hospitality Services o Major site plan for a Retail/warehouse at 7038 Market Street • 4504 Tesla Park Apartments o Clubhouse and Pool • US HWY 421 5210 New Hanover County Landfill o Membrane Bioreactor Porch Concepts –TRC Review Page | 1 To: Charlie Cazier, PE – Intracoastal Engineering PLLC charlie@intracoastalengineering.com From: Ron Meredith Current Planner Date: July 2nd, 2021 Subject: Porch Concepts – 7036/7038 Market Street – Commercial Site Plan – TRC Review The following comments have been received for the July 7th, 2021 TRC meeting. Please note: following the TRC meeting, a revised site plan addressing each of the below items must be resubmitted prior to receiving approval. Planning, Ron Meredith 910-798-7441 1. Please update the plan with the following general corrections: a. General comments per the Major Site Plan application. i. Please provide the land use and zoning of the adjacent parcels. ii. Please be sure that all elevations are tied to North American Vertical Datum of 1988 (NAVD 88) and horizontal coordinates must be tied to the North Carolina Grid System. iii. Are any wetlands located on the site, if so, please indicate the location of all environmental areas of concern including conservation resources, 404 wetlands, and 401 wetlands as defined by the appropriate agency. iv. Please include all existing and proposed landscaping, including caliper, height, and species that will be preserved or installed to comply with the landscaping requirements including bufferyard, streetscape, foundation, screening, and parking lot landscaping. b. Please show and label the sight triangles on the landscape and site plan. c. Please show and label the setbacks on the site plan. 2. Landscape Plan: a. Please provide a landscape plan. 3. Please provide screening, UDO Section 5.4.4, loading/unloading areas and Heating/air conditioning units are to be shielded from view from the property line of an existing residential use by a 100 percent opaque solid wall. 4. Please label the buffer as a Type A Opaque Buffer. Porch Concepts –TRC Review | 2 5. Signs: a. Will the billboard on the site be removed? If not please indicate the location on the site plan. b. Please indicate the location of proposed signage for Porch Concepts as well. 6. Tree Retention: a. Please be aware that there are optional incentives for retaining trees on site, UDO Section 5.3.8.A.2. b. The tree retention standards have recently been updated. Please provide the specific species (Loblolly pine, Long Leaf pine, etc.) of all regulated trees to be removed or credited for mitigation. In addition to the significant trees, please list all regulated trees to be removed. c. Per UDO Section 5.3.4.C, of the UDO requires a minimum of 15 trees at least 2” DBH must be retained or planted on the parcel where development occurs for each acre or proportionate area disturbed. i. Please note that required landscaping for the project can be credited to meet this requirement. d. Please be aware that a Tree Removal Permit is required prior to any land disturbance activities. Please provide the specific species (Loblolly Pine, Long Leaf Pine, etc.) of the trees to be removed or retained to determine required mitigation. e. Per UDO Section 5.3.6.B, please be aware that prior to any construction activity protection fencing is required around protected trees or tree stands. The fencing shall be a minimum of four feet and shall remain in place through completion of construction activities. f. Please modify the tree table provided to include the specific types of pine trees and an additional column to classify if they are native or invasive. 7. Please be aware that no building permit will be issued until NCDOT has issued the Driveway Permit approval. 8. UDO Section 5.5.3, before the Site Plan approval can be issued, documentation must be provided to illustrate that street lighting, all exterior lighting, and indoor lighting visible from outside shall be designed and located so that the maximum illumination measured in foot candles at ground level at lot lines abutting R-15 parcels do not surpass 0.5. Fire Services, Raymond Griswold 910-798-7464 1. I have reviewed the updated plans. I am taking over for Troy Davidson. It appears everything is on the plan and the building will be sprinklered. Only 2 comments I will add. a. A fire hydrant shall be placed within 100 feet of the FDC b. No storage over 12 foot high unless approved by this office and the sprinkler system will be designed for High Piled / Rack Storage. NHC Engineering (Stormwater), Galen Jamison 910-798-7142 1. NHC Engineering has received the application to construct and the land disturbing permit and will follow up directly with the applicant as these reviews are completed. 2. A request for additional information related to the Stormwater System Authorization to Construct (ATC) application was provided on June 9, 2021. Please provide responses and updated documentation as indicated in the request letter. It is recommended the first submission to TRC and adjudication of comments be completed prior to submission of the Stormwater System ATC application. Porch Concepts –TRC Review | 3 3. There appears to be drainage coming from the north and south and the proposed grades will likely result ponding issues on adjacent properties. Additionally, the proposed southern swale discharges onto adjacent property with no outfall control measure nor conveyance. Measures to avoid flooding of adjacent property such as conveying it through/around the site, directing all onsite drainage to the proposed infiltration system, establishing/obtaining public drainage easements and offsite improvements to establish adequate outfall may be necessary. Any offsite drainage routed through/around the site will need a drainage easement to assist with the mission of new Stormwater Services department starting in July. Construction of offsite drainage conveyance measures that will be maintained by the County will need to observed during construction by Stormwater Services and a turnover meeting scheduled once the system is ready to be conveyed to the County. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 1. CFPUA plan review has been completed. Any changes will be required CFPUA re-review. 2. CFPUA water and sewer available. 3. CFPUA Meter Sizing Form will be required. a NCDOT, Patrick Wurzel, 910-398-9100 1. These preliminary comments and are based on the plans as submitted for the proposed site and are subject to further review upon receipt of any additional information. Subsequently, additional comments and/or requirements may be necessary for this site. a. A NCDOT Driveway Permit is required. Submit a plan in accordance with pages 14 and 15 of the Policy on Street and Driveway Access to North Carolina Highways to include access locations within 500’ of the proposed access on both sides of the State road. Submit to the local NCDOT District Engineer’s Office. b. This project is within the U-4751 Project. Please submit DGN files with the driveway permit submission. c. A NCDOT Encroachment Agreement is required for any utility connections or installation within NCDOT right-of-way. d. NCDOT Driveway Permits are now submitted through the NCDOT Driveway website. https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx Environmental Health, Marie Hemmen 910-798-6664 1. Property will be tying onto sewer and water with CFPUA 2. Add to plan, any wells located at 7034 Market St. All buildings (on 7036/7038 Market St.) must maintain 25 feet from any well. Porch Concepts –TRC Review | 4 WMPO, Scott James 910-341-7890 1. NCDOT Projects: a. Tip Projects in the Area: U - 4751 i. Project Description: SR 1409 (MILITARY CUTOFF ROAD) TO US 17 (MARKET STREET) IN WILMINGTON. MULTI-LANES ON NEW LOCATION. ii. Construction Date: under construction 2. Tip Projects in the Area: U – 4902 D a. Project Description: SR 1403 (MIDDLE SOUND LOOP ROAD) TO SR 2290 (MENDEHNALL DRIVE)/ SR 2734 (MARSH OAKS DRIVE). i. Construction Date: Under Construction 3. WMPO 2045 Projects: a. N/A 4. New Hanover County CTP: a. N/A 5. TIA: A TIA will not be required based on the following trip generation: Planning (Addressing), John Townsend 910-798-7443 1. Address will be 7036 Market St 2. If suites or units are planned contact planning for address assignment Comments not received at this time from: NCDEQ, Chad Coburn New Hanover Soil & Water, Dru Harrison NCDEMLR, Dan Sams DCM, Tanya Pietila USACE, Rachel Capito New Hanover County Schools, Laura Severt Goldenberg Office –TRC Review Page | 1 To: Amanda MacLeod, McKim and Creed, Inc. amacleod@mckimcreed.com From: Ron Meredith Current Planner Date: July 2nd, 2021 Subject: Goldenberg Office – 6005/6007 Market Street – Commercial Site Plan – TRC Review The following comments have been received for the July 7th, 2021 TRC meeting. Please note: following the TRC meeting, a revised site plan addressing each of the below items must be resubmitted prior to receiving approval. Planning, Ron Meredith 910-798-7441 1. Please update the plan with the following general corrections: a. General comments per the Major Site Plan application. i. Please provide a copy of the site plan with the Engineer’s seal. ii. Please provide the land use and zoning of the adjacent parcels. iii. Please provide a legend for all symbols used within the site plan. iv. Please be sure that all elevations are tied to North American Vertical Datum of 1988 (NAVD 88) and horizontal coordinates must be tied to the North Carolina Grid System. v. Please indicate the location of all environmental areas of concern including conservation resources, 404 wetlands, and 401 wetlands as defined by the appropriate agency. vi. Please include all existing and proposed landscaping, including caliper, height, and species that will be preserved or installed to comply with the landscaping requirements including bufferyard, streetscape, foundation, screening, and parking lot landscaping. b. It appears there are City of Wilmington references on the General Notes sheet, please work with NHC Engineering and the CFPUA to determine what notes are required. c. Please hatch the existing parking for clarity. d. Please show and label the sight triangles on the landscape and site plan. e. Please show and label the setbacks on the site plan. f. Please adjust the label for the square footage of the interior parking island, it appears the label is on top of the GPS nail label. Goldenberg Office –TRC Review | 2 2. Screening: a. Please provide screening, UDO Section 5.4.4, heating/air conditioning units are to be shielded from view from the property line of an existing residential use by a 100 percent opaque solid wall. 3. Please indicate the location of signage to comply with UDO Section 5. 4. Please label the buffer as a Type A Opaque Buffer. 5. Landscape Plan: a. Please provide a landscape plan. 6. Tree Retention: b. Please be aware that there are optional incentives for retaining trees on site, UDO Section 5.3.8.A.2. c. The tree retention standards have recently been updated. Please provide the specific species (Loblolly pine, Long Leaf pine, etc.) of all regulated trees to be removed or credited for mitigation. In addition to the significant trees, please list all regulated trees to be removed. d. Per UDO Section 5.3.4.C, of the UDO requires a minimum of 15 trees at least 2” DBH must be retained or planted on the parcel where development occurs for each acre or proportionate area disturbed. i. Please note that required landscaping for the project can be credited to meet this requirement. e. Please be aware that a Tree Removal Permit is required prior to any land disturbance activities. Please provide the specific species (Loblolly Pine, Long Leaf Pine, etc.) of the trees to be removed or retained to determine required mitigation. f. Per UDO Section 5.3.6.B, please be aware that prior to any construction activity protection fencing is required around protected trees or tree stands. The fencing shall be a minimum of four feet and shall remain in place through completion of construction activities. 7. Please be aware that no building permit will be issued until NCDOT has issued the Driveway Permit. 8. UDO Section 5.5.3, before the Site Plan approval can be issued, documentation must be provided to illustrate that street lighting, all exterior lighting, and indoor lighting visible from outside shall be designed and located so that the maximum illumination measured in foot candles at ground level at lot lines abutting R-15 parcels do not surpass 0.5. 9. Parking: a. Offices for the Private Business and Professional Activities use requires 2.5 spaces per 1,000 sf. At 16,000 square feet, the proposed building would require more parking than what has been proposed. b. Section 5.1.3 does give options to provide an alternative parking plan to allow for reduced parking. 10. Access: a. Please provide a title opinion to show legal access through the adjacent properties parking lot. b. It appears that the deed reference for the access easement has been covered by the other text. Please adjust accordingly. 11. Easements: a. Easements: i. UDO Section 6.2.2, please label Storm Sewer, Sanitary Sewer, and Water Main Utility Easements. Goldenberg Office –TRC Review | 3 Fire Services, Ray Griswold 910-798-7464 1. Fire hydrant placement shall be within 100 feet of the FDC 2. I have reviewed the Fire Protection Notes. They are all approved. However, this is a County Project. All statements about Wilmington Fire shall reflect back to New Hanover County Fire Services. The correct phone numbers are 910-798-7463 - New Hanover County Building Safety or 910-798-7420 New Hanover County Fire Services. NHC Engineering (Stormwater), Galen Jamison 910-798-7142 1. Although the project appears to disturb less than one acre, the proposed site is within an existing grading permit and will therefore be required to obtain an erosion control permit. Please submit for permit as the design is completed. 2. A land disturbing permit and a modification to the stormwater system authority to construct (ATC #592-11/18/13) is required for this project. Please submit for permits as the design is completed. 3. The site plan component checklist requirement for storm pipes, drainage features and stormwater management features isn’t provided and it is assumed the drainage will conveyed/piped to the offsite permitted pond. If so, an operation and maintenance agreement with the offsite parcel will be required. 4. Documentation that the existing pond has adequate capacity/volume will be required with the completion certification of the stormwater ATC to verify previous pond maintenance and ensure permitted volumes still exists. 5. If there is any offsite drainage routed through or around the site or onsite drainage exiting the site with inadequate conveyance/outfall, a drainage easement to assist with the mission of new Stormwater Services department starting in July may be required. Construction of offsite drainage conveyance measures that will be maintained by the County will need to observed by Stormwater Services and a turnover meeting scheduled once the system is ready to be conveyed to the County. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 1. CFPUA plan review required. 2. CFPUA water and sewer available. 3. CFPUA Meter Sizing Form will be required. NCDOT, Patrick Wurzel, 910-398-9100 1. We do not have any comments. Environmental Health, Marie Hemmen 910-798-6664 1. Property will be tying onto sewer and water with CFPUA 2. It does not appear that proposed building plans will affect adjacent lot septic systems and wells. Goldenberg Office –TRC Review | 4 WMPO, Scott James 910-341-7890 1. NCDOT Projects: a. Tip Projects in the Area: U – 4902 C b. Project Description: NORTH OF US 117/NC 132 (COLLEGE ROAD) TO STATION ROAD). c. Construction Date: Right-of-Way in progress, 2029 2. WMPO 2045 Projects: a. N/A 3. New Hanover County CTP: a. N/A 4. TIA: A TIA will not be required based on the following trip generation: Planning (Addressing), John Townsend 910-798-7443 1. Address will be 440 Judges Rd 2. If suites or units are planned contact planning for address assignment Comments not received at this time from: NCDEQ, Chad Coburn New Hanover Soil & Water, Dru Harrison NCDEMLR, Dan Sams DCM, Tanya Pietila USACE, Rachel Capito New Hanover County Schools, Laura Severt