Loading...
TRC Agenda Packet 2.16.2022TECHNICAL REVIEW COMMITTEE AGENDA February 16, 2022 New Hanover County’s Technical Review Committee (TRC) will meet Wednesday, February 16, 2022 at 2:00 p.m. to discuss the below items. PLEASE NOTE: This meeting will be conducted remotely via teleconference Wednesday, February 16, 2022, at 2:00 p.m. Interested parties can contact the Planning and Land Use Department at 910-798-7165 for more information. Item 1: Warehouse (F&B Group, LLC) – Commercial Site Plan – Preliminary Plan Request by William B. Fuller Jr, with F&B Group for a warehouse. The subject property is located at 3012 Hall Watters Drive. It consists of 2.2 acres zoned I-2. The applicant is William B. Fuller Jr, with F&B Group. (wbfuller@gmail.com). The planner assigned is Zach Dickerson (zdickerson@nhcgov.com, 910-798-7450). Item 2: Canopy Point – Commercial Site Plan – Preliminary Plan Request by Tim Clark, McKim & Creed, for a multi-family development. The subject property is located at 205 and 217 Middle Sound Road. It consists of 4.77 acres total and is zoned CZD RMF-M. The applicant is Tim Clark, with McKim & Creed (tclark@mckimcreed.com). The planner assigned is Julian Griffee (jgriffee@nhcgov.com, 910-798-7444). Following our agenda items, we will have a brief overview and discussion of the Bee Safe Storage commercial sketch plan with Brad Schuler of Paramounte Engineering, Inc. This meeting is open to the public by calling 1-336-218-2051 and entering Conference ID: 530881514# F&B Warehouse – 3012 Hall Watters Drive – TRC Review Page | 1 To: William B Fuller, Jr. (910-763-0380), wbfullerjr@gmail.com From: Zach Dickerson, Current Planner Egov # SITECN-22-000004 Date: February 16, 2022 Subject: 3012 Hall Watters Drive – F&B Group Warehouse– I-2 – Commercial Site Plan – TRC Review The following comments have been received for the February 16th, 2022 TRC meeting. Additional comments may be made upon further review of subsequent revisions. Please note: following the TRC meeting, a revised preliminary plan addressing each of the below items must be resubmitted prior to receiving preliminary plan approval. Planning, Zach Dickerson 910-798-7450 1. Please update the plan with the following general corrections: a. Please label adjacent parcels with Parcel ID, Address and Zoning Information. b. Please provide details of sight triangle for ingress and egress to the parking lot, UDO Section 5.4.2.E. c. Please label curbing on western side of parking lot, or add additional curb stops. d. Please clearly show the ROW to the south of the site. 2. Setbacks a. Please show setback on Layout Plan. 3. Please note any sign is subject to Section 5.6. of the UDO and note any other planned locations of signs. 4. Will the sidewalk be ADA accessible? 5. Please provide all NCDOT approvals upon receipt. Please be aware that no building permit will be issued until NCDOT has issued the Driveway Permit approval. 6. Before the building permit can be issued, a lighting plan must be provided to illustrate that street lighting, all exterior lighting, and indoor lighting visible from outside shall be designed and located so that the maximum illumination measured in foot candles at ground level at a lot line does not surpass 2.0, UDO Section 5.5. a. Please note that per section 5.10.8 B, no lighting may be installed that would make it difficult for flyers to distinguish between airport lights and others. 7. Easements: a. Per Section 6.2.2, please label Storm Sewer, Sanitary Sewer, and Water Main Utility Easements. F&B Warehouse – 3012 Hall Watters Drive – TRC Review Page | 2 8. Landscaping: a. Please provide landscape plan as referenced in Site Data Table on C0, to include street yard, interior parking, foundation and screening. 9. Please include the total number of trips for this use per the ITE trip generator. If so, will this new project be covered under the existing TIA? 10. Warehousing: a. Please add this note to the plan, “Storage of live animals, explosives, and flammable gases or liquids is prohibited in warehousing in the B-2 and CS Districts.” Fire Services, Ray Griswold 910-508-0234 1. Fuller Warehouse - 3012 Hall Watters Drive - Proposed Warehouse. I conducted a site visit today. Upon my review of the plans County Fire is good with the proposal with the following comments: a. If building is sprinklered, a fire hydrant shall be within 100 feet of the FDC. b. No high Piled Storage allowed unless permitted through this office. c. A Section 510 study is required for Emergency Radio Coverage for First Responders d. Appendix J guidelines are required to be followed, Building Information Signage. NHC Engineering, Galen Jamison 910-798-7072 1. A land disturbing and stormwater permit issued by the County will be required. Please submit for permits as the design is completed. 2. A modification to stormwater ATC #14-08/08/17 will be required. Note Regional Pond #5 is sized for a maximum 80% impervious coverage per lot. 3. 0.25’ of freeboard between the drop inlet tops adjacent the building isn’t recommended. A minimum of 1’ is recommended between the site’s low point and the finished floor elevation of the building. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. 3. CFPUA water and sewer available. 4. At this time capacity is available; DWQ permit application will require a Planning FTSE. 5. Capacity is also dependent on the analysis of the pipe collection system (gravity and force mains). 6. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. 7. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. NCDOT, Patrick Wurzel 910-398-9100 1. We are currently working on the driveway permit with the engineer. Environmental Health, Dustin Fenske 910-798-6732 1. Environmental Health has no records of any septic systems or wells on Hall Watters Dr. Site will need to connect to public water and sewer or individual well and septic permits must be applied through the COAST online portal. F&B Warehouse – 3012 Hall Watters Drive – TRC Review Page | 3 WMPO, Scott James 910-473-5130 1. No comments provided. Planning (Addressing), Katherine May 910-798-7443 1. The current address 3012 Hall Watters is acceptable. 2. If a utility meter is to be installed, contact Planning for utility address. Brad Shaver USACOE brad.e.shaver@usace.army.mil 1. has never been to or asked to visit the Hall Watters property. Comments not received at this time from: WMPO, Scott James Canopy Point – Preliminary Site Plan – TRC Review Page |1 To: Tim Clark, McKim & Creed, Inc. tclark@mckimcreed.com From: Julian Griffee Current Planner Date: February 11th, 2022 Energov #: SITECN-22-000005 Subject: Canopy Point – Preliminary Site Plan – TRC Review The following comments have been received for the February 16th, 2022 TRC meeting. Additional comments may be made upon further review of subsequent revisions. Please note: following the TRC meeting, a revised preliminary plan addressing each of the below items must be resubmitted prior to receiving preliminary plan approval. Planning, Julian Griffee 910-798-7444 1. Please update the plan with the following general corrections: a. Zoning is referenced as ‘CD RMF-M', please correct to CZD RMF-M'. b. Please show the site angles on the landscape plan. 2. Setback according to approved Concept Plan presented to BOC shows a rear setback of the building to the property line as 73’. Submitted site plan indicates the building will be setback 71.11’. 3. Height a. Building height is listed twice – 42' & 35’-4”; Please clarify. 4. Please complete the application requirements below. a. Please label the existing land use(s) of the adjacent parcels. b. Please be sure to label all loading spaces, outdoor storage areas, and ground level mechanical equipment; fences and walls used for screening or decorative purposes (including height and material) c. Please label the open space or common areas, and bufferyards. d. Please label all existing wells and septic systems including repair area. Please work with environmental health on the correct abandonment procedures, if applicable. e. Please label all other utilities within or adjacent to the property. Canopy Point – Preliminary Site Plan – TRC Review Page | 2 5. Landscaping: a. Section 5.3.4.C of the UDO requires a minimum of 15 trees at least 2” DBH must be retained or planted on the parcel where development occurs for each acre or proportionate area disturbed. Landscaping required to comply with other sections of the ordinance (streetyard, buffering, etc.) can be credited to meet this standard. b. Screening: i. Please include the type and height of the dumpster screening, UDO Section 5.4.4.B. c. Buffers i. Please illustrate how the required buffers standards will be met. Please be aware that proposed use must provide a type A opaque transitional buffer to the existing single-family detached or undeveloped land on the adjacent R-15. Please show this buffering on the landscape plan. If existing trees will be used, additional plantings may be required in order to meet the opacity standards. Please include this as a note on the Landscape plan. ii. Please turn on the tree inventory layer on the Landscape Plan to showcase existing trees within the buffer. d. Interior landscaping i. Please label all interior landscaped areas for verification of the 8% requirement. ii. Please block or curb all parking spaces to prevent vehicles from encroaching more than one foot into planting islands or landscaped yards. e. Foundations Plantings: i. Please labeled the square footages on the plan for verification. f. Street Yard: i. Please illustrate how the street yard requirement will be met. The information in the site data table appears to be correct, however, is not reflected on the plan. Street yard must be compliant with Section 5.4.6. of the UDO. Utilizing existing trees is acceptable. ii. Please turn on the tree inventory layer on the Landscape Plan to showcase existing trees within the street yard. 6. Tree Retention: a. Please apply for a tree removal permit. a. Please be aware that a Tree Removal Permit is required prior to any land disturbance activities. Please provide the specific species (Loblolly Pine, Long Leaf Pine, etc.) of the trees to be removed or retained to determine required mitigation. b. Please be sure to include tree protection, UDO Section 5.3.6. c. It appears that there are trees preserved, please refer to UDO section 5.3.8. Optional Incentives for Retaining Trees. 7. Easements: a. UDO Section 6.2.2, please label all Storm Sewer, Sanitary Sewer, and Water Main Utility Easements. 8. Please apply for the sign removal permit with Zoning, UDO Section 5.6., signage will be subject to section standards. 9. UDO Section 5.7.3.H, please indicate if there are any Historical and Archaeological Sites located on the subject tract. 10. Illumination, please provide a light plan, light plans are required for all new non-residential, mixed- use, and multi-family developments: Canopy Point – Preliminary Site Plan – TRC Review Page | 3 a. UDO Section 5.5.3.A, please submit a lighting plan, submittal of this document is required in conjunction with an application for site plan approval or zoning compliance approval or whichever comes first. b. UDO Section 5.5.4, please submit a lighting plan to illustrate all exterior lighting and indoor lighting visible from outside. Please be aware that these lighting types must be designed and located so that the maximum illumination at a lot line is no greater than 0.5-foot candles adjacent to the R-15 and 2.0-foot candles adjacent to all other uses. c. UDO Section 5 .5.4, street lighting is exempt from the illumination standards mentioned above, but please take into consideration the placement of these lights as well. 11. It is recommended to show ADA accessible connections to the sidewalks in the required locations. 12. Driveway permit, no building permit for any structure shall be issued which requires NCDOT approval for a Driveway Permit until NCDOT has issued the approval. Evidence of approval shall accompany the application for building permit. 13. TIA Improvements: a. Please show the trip generation numbers and supply the exemption documentation which the WMPO has mentioned in their comments. Fire Services, Ray Griswold 910-798-7448 1. The Residence at Canopy Point - 205 - 215 Middle Sound Loop - 72 unit - 3 story Multi Family development I have reviewed the updated comments and County Fire approves this project. Raymond Griswold Deputy Fire Marshal 1-24-22 NHC Engineering, Galen Jamison 910-798-7072 1. A land disturbing permit issued by the County will be required and are currently under review. Any additional information necessary will be requested from the engineer. 2. The stormwater permit application has been initially reviewed and request for additional information was sent to the designer on February 1, 2022. Please resubmit the additional information for permit issuance. 3. There appears to be offsite stormwater drainage coming from the east. If this drainage will be routed through or around the site, a public drainage easement sized in accordance with NHC Stormwater Manual will be required. Construction of offsite drainage conveyance measures that will be maintained by the county will need to be observed during construction by Stormwater Services and a turnover meeting scheduled once the system is ready to be conveyed to the county. 4. Is the tree to remain near the raised garden (SE corner of building) intended to be in the middle of the sidewalk? 5. There are multiple locations of existing trees to remain that will have 2’ of fill placed adjacent the trunk. Is the intent to keep the tree in a sump/ponding area? Will the area remain full of water until the tree and evaporation remove rain water? What is the long term survivability of these existing trees? Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. 3. Project currently in CFPUA Plan Review. 4. CFPUA water and sewer available through mainline extension. Canopy Point – Preliminary Site Plan – TRC Review Page | 4 5. At this time capacity is available; DWQ permit application will require a Planning FTSE. 6. Capacity is also dependent on the analysis of the pipe collection system (gravity and force mains). 7. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. 8. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. NHC Environmental Health, Dustin Fenske 910-798-6664 1. Environmental Health records reflect both existing septic systems and wells located at 205 and 217 Middle Sound Loop Rd. Developer must express due diligence to locate, identify and protect the septic systems and well heads during demolition. Both septic systems and wells must be properly abandoned. Well abandonments/permits must be applied for through the COAST online portal. Site must connect to public water and sewer or individual well and septic system permits must be applied through the COAST online portal. Any infrastructure for this project such as sewer mains and manholes along with storm water devices must maintain required setbacks from adjacent properties well and septic systems. WMPO, Jamar Johnson 910-343-3915 1. Waiver of a Traffic Impact Analysis issued on February 25, 2020. NCDOT, Patrick Wurzel 910-398-9100 1. These preliminary comments and are based on the plans as submitted for the proposed site and are subject to further review upon receipt of any additional information. Subsequently, additional comments and/or requirements may be necessary for this site. 2. -A NCDOT Driveway Permit is required. Submit a plan in accordance with pages 14 and 15 of the Policy on Street and Driveway Access to North Carolina Highways to include access locations within 500’ of the proposed access on both sides of the State road. Submit to the local NCDOT District Engineer’s Office. 3. Verify that sight distance is met for design speed 4. A NCDOT Encroachment Agreement is required for any utility connections or installation within NCDOT right-of-way. 5. NCDOT Driveway Permits are now submitted through the NCDOT Driveway website. https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx Planning (Addressing), Katherine May 910-798-7443 1. Please provide at least 2 street names, one preferred and one alternative. 2. Please provide the number of units for each level of each building, e.g. Building 1 has 24 units with 8 on each floor. 3. Addresses will be assigned after TRC approval. Canopy Point – Preliminary Site Plan – TRC Review Page | 5 Comments not received at this time from: Emergency Services & E911, Steve Still NCDEQ, Chad Coburn New Hanover Soil & Water, Dru Harrison USACE, Brad Shaver NCDEMLR, Dan Sams DCM, Tanya Pietila New Hanover County Schools, Laura Severt