Loading...
Terms and Conditions DocumentProposed Master Planned Development Terms and Conditions Northside Baptist Church Mixed Use April 7, 2022 Proposed MDP Terms and Conditions: 1) Conditions related to approval of the application for the master planned development zoning district classifications: a) Phase 1 on Master Plan to be completed upon approval of rezoning to Planned Development. Phases 2 thru 4 are listed as future development and cannot be started without an additional community meeting and a full TIA study encompassing these phases has been completed. b) The use and development of our property will comply with all applicable federal, state, and local laws. c) The use of other regulations and conditions approved may be amended or modified to align with county requirements. d) Approval of this rezoning does not give approval of the site plan. All required permits must occur before construction can begin. 2) References to the Master Development Plan, including any density/intensity standards dimensional standards and development standards: a) The Planned Development does not include residential units. The density requirements for residential units will not apply. b) The existing building as well as future buildings have been and will be developed in accordance with the county, state, and federal building and environmental regulations. 3) Conditions related to the approval of the MDP Master Plan, including any conditions related to the form and design of development shown in MDP Master Plan: a) The planned development already has 2 paved access points connected to North College Road. b) The planned development also has 2 additional access points, one at the end of Owls Lane and one access point at the end of Red Hawk Road. c) There will not be any gated restrictions at any of these access points. d) The development already has existing vegetation that was planted per county standards. As future structures are added additional vegetation will be added per county standards. 4) Provisions addressing how transportation, portable water, wastewater, stormwater management, and other infrastructure will be provided to accommodate the proposed development: a) This proposed Planned Development already has paved roads established throughout the development. b) Stormwater management has already been installed (see attached map). c) Development is already serviced by Cape Fear Public Utilities for water and sewer. This includes our own sewer pumping station on property. 5) Provisions related to environmental protection and monitoring: a) Northside Baptist Church has in the past and will continue to follow all local, state, and federal regulations, laws, and ordinances.