Loading...
Pickleball TRC Comments Tidewater Pickleball – Commercial Site Plan – TRC Review Page | 1 To: Charles D. Cazier, PE – Intracoastal Engineering, PLLC (charlie@intracoastalengineering.com) From: Amy Doss Current Planner Date: October 28, 2022 Energov #: SITECN-22-000048 PID: R01800-002-001-000 Subject: Tidewater Pickleball – Indoor/Outdoor Recreational Facility – 5000 N. College Rd. – Commercial Site Plan – TRC Review The following comments have been received for the November 2, 2022, TRC meeting. Please note: following the TRC meeting, a revised site plan addressing each of the below items must be resubmitted prior to receiving approval. Planning, Amy Doss 910-798-7571 Please update the plan with the following general corrections: 1. Parking surpasses the County’s requirement. 2. Zoning: CZD CB (Z22-12)/Vacant. 3. Building Height: 26’ or 2 stories, site plan in compliance. 4. Uses (3): a. The first defined use is Indoor Recreational Facility: A commercial establishment that provides indoor facilities for recreation, entertainment (except adult entertainment), or amusement, including but not limited to: bowling alleys, pool rooms, indoor sports gymnasiums, movie theaters and live theaters, indoor skating rinks, video arcades, and indoor shooting ranges. b. The second defined use is Outdoor Recreational Facility: Uses that provide commercial recreation or amusement outdoors (except adult entertainment), including but not limited to: drive-in movie theater, amusement park or theme park, fairgrounds, miniature golf establishments, golf driving ranges, water slides, and batting cages. c. The third defined use is Restaurant: Establishments where food and beverages are prepared and sold on a retail basis for consumption on or off premises as its principal business. 5. General Comments: Tidewater Pickleball – Commercial Site Plan – TRC Review Page | 2 a. Please change the title to Commercial Site Plan. b. Please note: Elevations must be tied to North American Vertical Datum of 1988 (NAVD 88) and horizontal coordinates must be tied to the North Carolina Grid System. Once verified, please add a note to the site plan indicating as such. c. Please label ADA accessible ramps on sidewalks. d. Please show the location of all signs and note any proposed sign is subject to Section 5.6. of the UDO. ADA parking signs shown, are any wayfinding or additional signs proposed at this time? e. Please label all open spaces. f. Please label all fences and walls used for screening or decorative purposes (including height and material). Specifically, what type of fence is enclosing the courts? g. Please clearly label all loading spaces, dumpsters, outdoor storage areas, and ground level mechanical equipment. h. Please label all pedestrian circulation areas including sidewalks. Are there paved sidewalks between the courts? i. Please label water and sewer services (including type, size). j. Please label wells and septic systems including repair area. k. Please label all storm pipes, sewer pipes, water pipes, underground utilities, manholes, monitoring wells, and drainage features. l. Please label stormwater management features. m. Please label fire hydrants and fire apparatus access to buildings. n. Please label all radii. o. Please not on the site plan the rezoning for this property, case Z22-12, is subject to the following two conditions: i. The hours of operation will be limited to 7AM-9PM. ii. The restaurant and clubhouse may only operate as an accessory use to an operational outdoor recreational facility. 6. Landscape notes: a. Please provide a detailed landscape plan schedule illustrating the requirements for interior landscaping, street yards, foundation planting, and buffers have been met. 7. Tree Retention: a. Please apply for a Tree Removal Permit. b. Please be aware that a Tree Removal Permit is required prior to any land disturbance activities. Please provide the specific species (Loblolly Pine, Long Leaf Pine, etc.) of the trees to be removed or retained to determine required mitigation. c. Please clearly illustrate what trees are being preserved and what trees are proposed to remain. d. All specimen trees located within subject tract are required to be illustrated as well. UDO Section 5.3.5.C The removal of any specimen tree is prohibited on any parcel unless exempt according to Section 10.3.11, Variance Zoning and Subdivision. If a specimen tree is removed without a permit, the penalty for this violation shall be twice the mitigation fee. e. Please be aware that there are optional incentives for retaining trees on site, UDO Section 5.3.8.A.2. f. Please see the chart below indicating the documented, significant, and specimen trees regulated by the County. Tidewater Pickleball – Commercial Site Plan – TRC Review Page | 3 g. Per UDO Section 5.3.4.C, of the UDO requires a minimum of 15 trees at least 2” DBH must be retained or planted on the parcel where development occurs for each acre or proportionate area disturbed. Please add a note to the Landscape Plan showing has this requirement has been met. Please note that required landscaping for the project can be credited to meet this requirement, however, required landscaping does not count towards mitigation, if applicable. h. Per UDO Section 5.3.6.B, please be aware that prior to any construction activity protection fencing is required around protected trees or tree stands. The fencing shall be a minimum of four feet and shall remain in place through completion of construction activities. i. Tree inventory plans are required to reflect the trees being retained and the trees being removed clearly. Please see the example below, which illustrate the trees with the X’s being removed and the trees and the trees being preserved showing the protection in the correct placement. j. Please include the tree data within a table as shown below. Tidewater Pickleball – Commercial Site Plan – TRC Review Page | 4 8. Please be aware that no building permit will be issued until NCDOT has issued the Driveway Permit approval. 9. Parking/Loading: a. It appears that the parking count exceeds the ordinance standards- is permeable pavement a consideration for the excess parking? This is not a requirement, just a staff note. b. Please provide a typical parking space detail to demonstrate dimensions comply with UDO Table 5.1.4.B. This is noted on notes sheet C5.1, but would also be helpful on the overall site plan that shows all the parking spaces. c. Please provide dimensions of parking lot aisle to demonstrate compliance with UDO Table 5.1.4.B. d. Please show the location of any off-street loading berths if present on site, please refer to Section 5.1.5 of the UDO for the specifications. 10. Lighting: a. Before the building permit can be issued, a lighting plan must be provided to illustrate that street lighting, all exterior lighting, and indoor lighting visible from outside shall be designed and located so that the maximum illumination measured in foot candles at ground level at a residential lot line does not surpass 0.5, UDO Section 5.5. Please refer to Table 5.5.4.B of the UDO for additional standards. Provide documentation from the lighting provider stating they will provide a lighting plan to comply with the County’s UDO standards as stated above. Fire Services, Ray Griswold 910-798-7448 1. A Section 510 study shall be required – Emergency First Responder Radio coverage. 2. Please follow the Guidelines of Appendix J – Building Information Signage. 3. There is no public water supply at this time in this area of the county. Fire hydrant requirements have been waved. 4. No overflow parking allowed in / on the entrance to the facility. Parking only in marked spaces shall be allowed. NHC Engineering, Galen Jamison 910-798-7072 1. A land disturbing and a stormwater permit issued by the County are required for this project. Please submit for permits as the design is completed. Please check with NC DEQ for the requirements of a state stormwater permit. 2. There existing ditch that bisects the parcel appears to carry offsite stormwater and may qualify for NHC Stormwater Services maintenance. A public drainage easement sized in accordance with NHC Stormwater Manual will be required. Any construction of the offsite drainage conveyance measures that will be maintained by the county will need to be observed during construction by Stormwater Services and a turnover meeting scheduled once the system is ready to be conveyed to the county. Please add a plan note and show in plan view to ensure county construction observation and a turnover meeting occurs. Note, should the applicant elect to maintain the ditch themselves, the POA covenants shall indicate the operation and maintenance roles and responsibilities. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. Tidewater Pickleball – Commercial Site Plan – TRC Review Page | 5 3. CFPUA sewer available via FM to FM connection; CFPUA water is not available without a mainline extension. NCDOT, Nick Drees/Mike Frank, 910-398-9100 1. An NCDOT Driveway Permit is required. Submit a plan in accordance with pages 14 and 15 of the Policy on Street and Driveway Access to North Carolina Highways to include access locations within 500’ of the proposed access on both sides of the State Road. Submit to the local NCDOT District Engineer’s Office. 2. An NCDOT Encroachment Agreement is required for any utility connections or installation within NCDOT right-of-way. 3. NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Portal. 4. Stem length from r/w line per policy is 100’, it a variance is allowed the stem length can be shortened depending on conditions. 5. Shift driveway north to not encroach on the next parcel, keep in mind of the crossline. 6. NCDOT Hydraulics Unit will need to review the site. Environmental Health, Dustin Fenske 910-798-6732 1. Site plan reflects the site will connect to a public sewer system via a force main connection. The site plan reflects a proposed well for water supplies. The well will need to be permitted by either the State Public Water Supply section or local Environmental Health, depending on specifics of the businesses. The well will need to be applied for through the appropriate agency and permit obtained prior to building permit issuance. All other infrastructure developments do not affect surrounding properties well or septic systems. 7. The restaurant will need to submit plans and gain approvals/permitting through Environmental Health Food Protection Division. WMPO, Jamar Johnson 910-343-3915 Addressing, Katherine May 910-798-7443 1. The current address is acceptable. Tidewater Pickleball – Commercial Site Plan – TRC Review Page | 6 2. Please make note of any utility meters requiring a separate utility address. USACE, Brad Shaver 910-251-4611 1. Based on the description of wetlands to be filled I assume a USACE permit will be required before construction. Comments not received at this time from: Emergency Services & E911, Steven Still NCDEQ, Chad Coburn New Hanover Soil & Water, Dru Harrison NCDEMLR, Dan Sams DCM, Tanya Pietila New Hanover County Schools, Laura Severt